INDICE
03 LINEA DE CONDUCCIN...................................................................................................... 46
03.01 MOVIMIENTO DE TIERRAS................................................................................................. 46
03.01.01 LIMPIEZA Y DESBROCE DE TERRENO NATURAL (e = 0.10 m)...................................46
03.01.02 EXCAVACIN DE MATERIAL SUELTO MANUAL..................................................................46
03.01.03 EXCAVACIN MANUAL EN ROCA SUELTA.............................................................................48
03.01.04 EXCAVACIN C/EQUIPO EN ROCA FIJA..................................................................................48
03.01.05 DEMOLICIN DE CONCRETO EXISTENTE............................................................................48
03.01.06 COLOCACIN DE CAMA DE APOYO CON MATERIAL SELECCIONADO E= 2
49
03.01.07 PERFILADO, REFINE DE TALUD Y COMPACTADO DE RASANTE..................................49
03.01.08 RELLENO COMPACTADO CON MATERIAL PROPIO (MANUAL)....................................50
03.01.09 ELIMINACIN DE MATERIAL EXCEDENTE, DISTANCIA HASTA 200 m....................51
03.02 CONCRETO.............................................................................................................................. 51
03.02.01 ENCOFRADO Y DESENCOFRADO CANAL...............................................................................51
03.02.02 CONCRETO FC= 175 kg/cm2.................................................................................................... 51
03.03 MISCELNEO.......................................................................................................................... 52
03.03.01 JUNTAS DE DILATACIN C/SELLO ELASTOMRICO POLIURETANO e = 1.
52
03.03.02 JUNTAS DE CONTRACCIN C/SELLO ELASTOMRICO POLIURETANO e=1
52
03.03.03 INSTALACIN DE TUBERIA HDPE D=200mm PE80 PN 6bar......................................53
03.03.04 INSTALACIN DE TUBERIA HDPE D=250mm PE100 PN 6bar....................................55
03.03.05 INSTALACIN DE TUBERIA HDPE D=315mm PE100 PN 6bar....................................55
03.03.06 SUMINISTRO E INSTALACIN DE ACCESORIOS EN LA LINEA DE
CONDUCCIN......................................................................................................................................................... 55
03.03.07 PRUEBA HIDRAULICA EN LINEA DE CONDUCCIN.........................................................56
04 RESERVORIO.......................................................................................................................... 58
04.01 MOVIMIENTO DE TIERRAS................................................................................................. 58
04.01.01 LIMPIEZA Y DESBROCE DE TERRENO NATURAL (e = 0.10 m)...................................58
04.01.02 EXCAVACIN MANUAL EN MATERIAL SUELTO/C EQUIPO............................................58
04.01.03 EXCAVACIN MANUAL EN ROCA SUELTA.............................................................................60
04.01.04 PERFILADO, REFINE DE TALUD Y COMPACTADO DE RASANTE..................................60
04.01.05 RELLENO COMPACTADO CON MATERIAL PROPIO (MANUAL)....................................60
04.01.06 ELIMINACIN DE MATERIAL EXCEDENTE, DISTANCIA HASTA 200m.....................60
04.02 CONCRETO.............................................................................................................................. 60
04.02.01 ACERO DE REFUERZO Fy= 4200 kg/cm2 GRADO 60....................................................60
04.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA.....................................................................60
04.02.03 CONCRETO F'C = 100 kg/cm2 PARA SOLADO e= 5cm..................................................60
04.02.04 CONCRETO FC= 210 kg/cm2.................................................................................................... 60
04.03 MISCELNEO.......................................................................................................................... 60
04.03.01 JUNTA DE DILATACIN CON WATER STOP 6.....................................................................60
04.03.02 JUNTAS DE DILATACIN C/SELLO ELASTOMRICO POLIURETANO e = 1.
60
04.03.03 SUMINISTRO E INSTALACIN DE ACCESORIOS P/CAJA DE VLVULAS....................61
04.03.04 SUMINISTRO E INSTALACIN DE COMPUERTA PLANA DESLIZ. P/ORIFICIO
0.35 x 0.30 m TIPO TARJETA............................................................................................................................ 62
04.03.05 SUMINISTRO E INTALACIN DE CERCO PERIMETRICO DE MALLA
GALVANIZADA DE 2 x21/2x1/8............................................................................................................ 62
04.03.06 SUMINISTRO E INSTALACIN DE ALAMBRE DE PAS GALVANIZADA.....................62
04.03.07 ACCESORIOS METLICOS DE SEGURIDAD DE PUERTA...................................................63
05 TRANSICIN.......................................................................................................................... 63
05.01 MOVIMIENTO DE TIERRAS................................................................................................. 63
05.01.01 LIMPIEZA Y DESBROCE DE TERRENO NATURAL (e = 0.10 m)...................................63
05.01.02 EXCAVACIN DE MATERIAL ROCA SUELTA MANUAL......................................................63
05.01.03 PERFILADO, REFINE DE TALUD Y COMPACTADO DE RASANTE..................................63
05.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO (MANUAL)....................................63
05.01.05 ELIMINACIN DE MATERIAL EXCEDENTE, DISTANCIA HASTA 200m.....................63
05.02 CONCRETO.............................................................................................................................. 64
05.02.01 ACERO DE REFUERZO Fy= 4200 kg/cm2 GRADO 60....................................................64
05.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA.....................................................................64
05.02.03 CONCRETO F'C = 100 kg/cm2 PARA SOLADO e= 5cm..................................................64
05.02.04 CONCRETO FC= 210 kg/cm2.................................................................................................... 64
05.03 MISCELANEO.......................................................................................................................... 64
05.03.01 JUNTAS DE DILATACIN C/SELLO ELASTOMRICO POLIURETANO e = 1.
64
06 CMARA DE AMORTIGUAMIENTO TIPO IMPACTO........................................................64
06.01 MOVIMIENTO DE TIERRAS................................................................................................. 64
06.01.01 LIMPIEZA Y DESBROCE DE TERRENO NATURAL (e = 0.10 m)...................................64
06.01.02 EXCAVACIN DE MATERIAL ROCA SUELTA MANUAL......................................................64
06.01.03 PERFILADO, REFINE DE TALUD Y COMPACTADO DE RASANTE..................................64
06.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO (MANUAL)....................................64
06.01.05 ELIMINACIN DE MATERIAL EXCEDENTE, DISTANCIA HASTA 200m.....................64
06.02 CONCRETO.............................................................................................................................. 64
06.02.01 ACERO DE REFUERZO Fy= 4200 kg/cm2 GRADO 60....................................................64
06.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA.....................................................................65
06.02.03 CONCRETO F'C = 100 kg/cm2 PARA SOLADO e= 5cm..................................................65
06.02.04 CONCRETO FC= 210 kg/cm2.................................................................................................... 65
06.03 MISCELANEO.......................................................................................................................... 65
06.03.01 SUMINISTRO E INSTALACIN DE TAPA METLICA 1.35x1.00 m x 3/16
(interior) 65
07 PASE EREO........................................................................................................................... 66
07.01 MOVIMIENTO DE TIERRAS................................................................................................. 66
07.01.01 LIMPIEZA Y DESBROCE DE TERRENO NATURAL (e = 0.10 m)...................................66
07.01.02 EXCAVACIN DE MATERIAL ROCA SUELTA MANUAL......................................................66
07.01.03 PERFILADO, REFINE DE TALUD Y COMPACTADO DE RASANTE..................................66
07.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO (MANUAL)....................................66
07.01.05 ELIMINACIN DE MATERIAL EXCEDENTE, DISTANCIA HASTA 200m.....................66
07.02 CONCRETO.............................................................................................................................. 66
07.02.01 ACERO DE REFUERZO Fy= 4200 kg/cm2 GRADO 60....................................................66
07.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA.....................................................................66
07.02.03 CONCRETO F'C = 100 kg/cm2 PARA SOLADO e= 5cm..................................................66
07.02.04 CONCRETO FC= 210 kg/cm2.................................................................................................... 66
07.03 MISCELANEO.......................................................................................................................... 66
07.03.01 SUMINISTRO E INSTALACIN DE ACCESORIOS PARA PASE AREO..........................66
08 CMARA DE INSPECCIN.................................................................................................... 67
08.01 MOVIMIENTO DE TIERRAS................................................................................................. 67
08.01.01 LIMPIEZA Y DESBROCE DE TERRENO NATURAL (e = 0.10 m)...................................67
08.01.02 EXCAVACIN DE MATERIAL ROCA SUELTA MANUAL......................................................67
08.01.03 PERFILADO, REFINE DE TALUD Y COMPACTADO DE RASANTE..................................67
08.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO (MANUAL)....................................67
08.01.05 ELIMINACIN DE MATERIAL EXCEDENTE, DISTANCIA HASTA 200m.....................67
08.02 CONCRETO.............................................................................................................................. 67
08.02.01 ACERO DE REFUERZO Fy= 4200 kg/cm2 GRADO 60....................................................67
08.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA.....................................................................67
08.02.03 CONCRETO F'C = 100 kg/cm2 PARA SOLADO e= 5cm..................................................68
08.02.04 CONCRETO FC= 210 kg/cm2.................................................................................................... 68
08.03 MISCELANEO.......................................................................................................................... 68
08.03.01 SUMINISTRO E INSTALACIN DE ACCESORIOS PARA CMARA.................................68
09 TOMA LATERAL..................................................................................................................... 69
09.01 MOVIMIENTO DE TIERRAS................................................................................................. 69
09.01.01 LIMPIEZA Y DESBROCE DE TERRENO NATURAL (e = 0.10 m)...................................69
09.01.02 EXCAVACIN DE MATERIAL ROCA SUELTA MANUAL......................................................69
09.01.03 PERFILADO, REFINE DE TALUD Y COMPACTADO DE RASANTE..................................69
09.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO (MANUAL)....................................69
09.01.05 ELIMINACIN DE MATERIAL EXCEDENTE, DISTANCIA HASTA 200m.....................69
09.02 CONCRETO.............................................................................................................................. 69
09.02.01 ACERO DE REFUERZO Fy= 4200 kg/cm2 GRADO 60....................................................69
09.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA.....................................................................69
09.02.03 CONCRETO F'C = 100 kg/cm2 PARA SOLADO e= 5cm..................................................69
09.02.04 CONCRETO FC= 210 kg/cm2.................................................................................................... 69
09.03 MISCELANEO.......................................................................................................................... 69
09.03.01 JUNTAS DE DILATACIN C/SELLO ELASTOMRICO POLIURETANO e = 1.
69
09.03.02 JUNTAS DE DILATACIN CON WATER STOP 6...................................................................69
09.03.03 SUMINISTRO E INSTALACIN DE COMPUERTA TIPO ARMCO MOD. HPB-30
DE 0.25 X 1.30 M C/SISTEMA DE IZAJE....................................................................................................... 69
09.03.04 SUMINISTRO E INSTALACIN DE COMPUERTA PLANA DESLIZ. P/ORIFICIO
0.25 x 0.35 m TIPO TARJETA............................................................................................................................ 70
10 SIFN....................................................................................................................................... 70
10.01 MOVIMIENTO DE TIERRAS................................................................................................. 70
10.01.01 LIMPIEZA Y DESBROCE DE TERRENO NATURAL (e = 0.10 m)...................................70
10.01.02 EXCAVACIN DE MATERIAL ROCA SUELTA MANUAL......................................................70
10.01.03 PERFILADO, REFINE DE TALUD Y COMPACTADO DE RASANTE..................................70
10.01.04 RELLENO COMPACTADO CON MATERIAL PROPIO (MANUAL)....................................70
10.01.05 ELIMINACIN DE MATERIAL EXCEDENTE, DISTANCIA HASTA 200m.....................70
10.02 CONCRETO.............................................................................................................................. 70
10.02.01 ACERO DE REFUERZO Fy= 4200 kg/cm2 GRADO 60....................................................70
10.02.02 ENCOFRADO Y DESENCOFRADO CARAVISTA.....................................................................70
10.02.03 CONCRETO F'C = 100 kg/cm2 PARA SOLADO e= 5cm..................................................70
10.02.04 CONCRETO FC= 210 kg/cm2.................................................................................................... 70
10.03 MISCELANEO.......................................................................................................................... 70
10.03.01 INSTALACIN DE TUBERIA HDPE D=200mm PE100 PN 6bar....................................70
10.03.02 SUMINISTRO E INSTALACIN DE COMPUERTA PLANA DESLIZ. P/ORIFICIO
0.35 x 0.50 m TIPO TARJETA............................................................................................................................ 71
10.03.03 SUMINISTRO E INSTALACIN DE TAPA METLICA 0.60x0.60 m x3/16................71
11 CANOA..................................................................................................................................... 71
11.01 MOVIMIENTO DE TIERRAS................................................................................................. 71
11.01.01 LIMPIEZA Y DESBROCE DE TERRENO NATURAL (e = 0.10 m)...................................71
11.01.02 EXCAVACIN MANUAL EN ROCA SUELTA.............................................................................71
11.01.03 RELLENO COMPACTADO CON MATERIAL PROPIO (MANUAL)....................................71
11.01.04 ELIMINACIN DE MATERIAL EXCEDENTE, DISTANCIA HASTA 200m.....................71
11.02 CONCRETO.............................................................................................................................. 71
11.02.01 ENCOFRADO Y DESENCOFRADO CARAVISTA.....................................................................71
11.02.02 CONCRETO CICLPEO FC=210 kg/cm2 + 30% PM........................................................71
11.02.03 MAMPOSTERA DE PIEDRA ASENTADA Y EMBOQUILLADA EN CONCRETO
FC =210 kg/cm2 e = 0.20 m........................................................................................................................... 71
12 MEDIDAS DE MITIGACION AMBIENTAL Y SEGURIDAD.................................................71
12.01 MEDIDAS DE MITIGACIN AMBIENTAL.......................................................................... 71
12.01.01 EQUIPAMIENTO Y MEDIDAS ANTE CONTINGENCIAS......................................................72
12.01.02 SUMINISTRO Y MANTENIMIENTO DE BAOS QUMICOS..............................................73
12.01.03 SUMINISTRO E INSTALACIN DE PUNTO DE ACOPIO PARA RESIDUOS
SLIDOS 74
12.01.04 RECOLECCIN, TRANSPORTE Y DISPOSICIN FINAL DE RESIDUOS
SLIDOS 75
12.01.05 LIMPIEZA Y RESTITUCIN MORFOLGICA DE REAS INTERVENIDAS POR
OBRAS 76
12.02 MEDIDAS DE SEGURIDAD Y SALUD.................................................................................. 77
12.02.01 IMPLEMENTACIN Y ADMINISTRACIN DEL PLAN DE SEGURIDAD Y
SALUD 77
12.02.02 SUMINISTRO Y EQUIPAMIENTO DEL PERSONAL DE OBRA..........................................78
12.02.03 EQUIPAMIENTO DE SEGURIDAD COLECTIVA......................................................................78
12.02.04 SEALIZACIN TEMPORAL DE SEGURIDAD.......................................................................79
12.02.05 EQUIPO PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD
80
ESPECIFICACIONES TECNICAS PARTICULARES
2 OBRAS DE CAPTACIN
2.1 MOVIMIENTO DE TIERRAS
Las Especificaciones contenidas en este acpite, sern aplicadas al movimiento
de tierras manual en superficie, de acuerdo a lo previsto en los planos de
diseo, para construccin de las obras, incluyendo los trabajos de
excavaciones y rellenos.
Los trabajos que comprende ste tem abarcan el suministro, operacin y
mantenimiento de todos los equipos menores y herramientas, as como
tambin el empleo de mano de obra, material y combustible que fueran
necesarios para realizar los trabajos.
Las excavaciones sern efectuadas segn los ejes, rasantes y niveles indicados
en los planos de diseo, y se llevarn a cabo aplicando medios apropiados
elegidos por el Contratista.
Los cambios de los niveles o lneas de excavacin indicados en los planos, se
realizarn previa autorizacin de la Supervisin y sern efectuados por el
Contratista, y los costos por estos trabajos adicionales sern reconocidos con
los mismos precios unitarios. Pudiendo realizarse variaciones de trazo y
niveles, de acuerdo con las condiciones que se presenten durante la excavacin
proyectada, previa autorizacin de la Supervisin.
El Contratista deber proceder a las excavaciones, despus que haya procedido
al levantamiento de las secciones transversales del terreno natural aprobado
por la Supervisin. Se incluye en ste tem, la proteccin de las excavaciones de
todos los cortes y refines de sus taludes, as como la preparacin del fondo de
las excavaciones para la cimentacin de las estructuras que posteriormente se
emplazarn en estos lugares.
La excavacin excesiva o sobre excavacin efectuada por el Contratista ser
por su cuenta, a excepcin de la ordenada por la Supervisin y la sobre
excavacin ser rellenada de acuerdo a las instrucciones de la Supervisin, con
materiales suministrados y colocados por cuenta del Contratista.
Respecto al manejo y ubicacin de botaderos, para minimizar los impactos
relacionados con la inadecuada disposicin de los materiales sobrantes, se
recomienda se ubiquen en zonas de canteras abandonadas o suelos estriles
sin ningn tipo de cobertura vegetal, pudiendo rellenarse con material propio
reas inundadas, evitando la proliferacin de mosquitos y otros agentes. En
todo caso se deber evitar utilizar zonas inestables o reas de importancia
ambiental como reas agrcolas.
A Excavacin en Material Suelto:
La excavacin en material suelto consiste en la remocin y levantamiento de
todos los materiales que pueden ser removidos a mano, con excavadora, o con
equipos de movimiento de tierra sin escarificador ni empleo de explosivos.
El Contratista deber proceder a las excavaciones en material suelto, despus
que haya procedido a la limpieza y al levantamiento topogrfico de secciones
transversales del terreno natural aprobado por la Supervisin.
B Excavacin de Roca Fija:
Se entender por roca fija a aquellos depsitos o masa de roca duras
compactadas que seolo pueden trabajarse con explosivos de alto poder por lo
mismo que son compactadas o fuertemente litificadas; no tienen frecuentes
planos de clivaje, tales como las rocas gneas, algunas variedades de
conglomerados consolidados y las areniscas y andesitas; as mismo en este
grupo se puede considerar el material aluvial y coluvial con porcentajes de
pedrones, bolones de ms de 75% y con tamaos superiores a un metro
cbico (1 m3). Debido a su cementacin y compactacin; requieren el empleo
sistemtico de explosivos.
Para iniciar los trabajos de perforacin y voladuras de roas, el ejecutor deber
presentar en primer lugar un procedimiento ejecutivo con carcter de
obligatoriedad para ser aprobados por la SUERVISIN, en el cual debe
establecerse criterios de voladuras, las mallas, etc. Unas vez que se cumpla con
los requerimientos ofrecidos en la propuesta tcnico econmica del
CONTRAISTA para realizar esta partida de voladura en roca.
C Proteccin de las Excavaciones
Los anchos y taludes de las excavaciones sern los indicados en los planos de
diseo. Las pendientes de los taludes de excavacin sern ejecutadas segn lo
indicado en los planos, de acuerdo con el tipo de material de cimentacin.
C.1 Proteccin Temporal de las Excavaciones
El Contratista durante la ejecucin de las excavaciones y hasta el momento de
ser rellenados y/o revestidos, tomar todas las medidas tcnicamente
correctas y adecuadas con el objeto de asegurar la estabilidad de las
superficies excavadas empleando donde sea necesario apuntalamiento.
Las obras de proteccin de las excavaciones debern dejar espacio suficiente
para permitir el acceso permanente a las obras.
Despus de terminada la obra, deber ser removida toda proteccin o
armadura de carcter provisional que haya quedado en el sitio, siempre y
cuando la Supervisin no considere lo contrario.
C.2 Proteccin Permanente
Los taludes de las excavaciones permanentes estn indicados en los planos de
diseo. De acuerdo a las condiciones encontradas en el momento de la
excavacin, se podr utilizar en los taludes de roca, shotcrete con malla
electrosoldada y otras protecciones que sern previamente definidas con la
Supervisin.
C.3 Preparacin del Fondo de la Cimentacin
El fondo de la cimentacin se acondicionar para contener la estructura
proyectada, limpiando y compactando el rea excavada.
La profundidad de la excavacin se guiar por las indicaciones del diseo, sin
embargo estar sujeta a las caractersticas encontradas en el subsuelo, en cuyo
caso deber ser fijada y aprobada por la Supervisin. Mientas sea necesario,
las excavaciones se protegern a entera satisfaccin de la Supervisin, de tal
forma que no se produzca dao alguno que pudiera disminuir la capacidad
portante de stas.
La cimentacin deber limpiarse de todo material descompuesto, material
suelto, races y de todas las dems inclusiones que pudieran perjudicarlas. La
excavacin para cimentacin se proteger contra fenmenos de meteorizacin
y ablandamiento y en caso necesario mediante una capa de concreto pobre
(solado).
Para este efecto, la cimentacin permanecer descubierta el tiempo necesario,
en caso contrario, sus alineamientos finales no se excavarn hasta que se tenga
todo preparado para el proceso de hormigonado de los cimientos. No se
considerar ningn pago extraordinario por dificultades que de los procesos
necesarios pudieran derivarse para cumplir estos requisitos.
Si al alcanzar las cotas indicadas en los planos, se comprobara que no se
satisfacen las condiciones requeridas, los trabajos de excavacin habrn de
continuarse siguiendo las instrucciones de la Supervisin, hasta alcanzar una
capa apropiada que rena las condiciones necesarias para soportar las cargas
de las estructuras. Las grietas, diaclsas, etc., que aparezcan en estas zonas,
ser rellenadas por suelos bien compactados o por concreto pobre segn lo
requiera a criterio de la Supervisin.
Daos como grietas, sobre excavaciones u otras que pudieran derivarse de una
ejecucin defectuosa de los trabajos de excavacin o a causa de las voladuras
realizadas, corrern por cuenta del Contratista y habrn de ser eliminadas a
satisfaccin de la Supervisin.
D Descarga del Material de Excavacin
El material de excavacin ser depositado generalmente fuera del lmite de la
Obra, y en caso de excavaciones a media ladera depositarlo en el talud aguas
abajo de la zona de excavaciones, con el objeto de reducir en lo posible
operaciones de transporte.
Cuando los materiales excavados sean juzgados aptos para agregados de
concreto, rellenos de terraplenes, enrocados, etc., el Contratista podr
utilizarlo limitando al mnimo posible la explotacin de canteras de prstamo.
E Derrumbes y Sobre-Excavaciones
Los derrumbes de materiales que ocurran en las obras y los ocasionados fuera
de la lnea fijada para la excavacin, sern removidos y los taludes sern
regularizados segn disposiciones de la Supervisin.
La limpieza de los derrumbes as como los mayores rellenos requeridos ser a
cuenta del Contratista, siempre y cuando las causas de stas no se deban a
fallas geolgicas, deslizamientos de taludes, o a sobre-excavaciones indicadas
en los planos y/o autorizadas por la Supervisin.
Cuando el derrumbe o sobre-excavacin se efecte en una zona destinada a
estar en contacto con estructuras de concreto, los espacios dejados sern
rellenados con concreto pobre de regularizacin hasta recuperar la lnea de
excavacin terica; o por razn de orden constructiva, pueden ser rellenados a
la vez con el mismo concreto de la estructura en contacto directo.
2.2 CONCRETO
2.2.1 ACERO DE REFUERZO Fy= 4200 kg/cm2 GRADO 60
DESCRIPCION
Esta partida se refiere al acero que ir colocado para conformacin de la losa
de concreto de la obra de arte para cruce de quebrada, de acuerdo a planos y
aprobado por la Supervisin.
METODO DE EJECUCIN
El Contratista deber suministrar, detallar, fabricar e instalar todas las varillas
de acero de refuerzo, necesarias para completar las estructuras de concreto
armado.
Todas las varillas de refuerzo, se conformarn de acuerdo a los requisitos de la
especificacin ASTM A-615 para varillas de acero Grado 60. El acero deber
tener un lmite de fluencia de 4,200 kg/cm2 como mnimo.
Las varillas de acero de refuerzo sern habilitadas en taller. El Contratista ser
el total y nico responsable del detalle, suministro, doblado y colocacin de
todo el acero de refuerzo. Antes de efectuar la colocacin de las varillas, la
superficie de las mismas ser limpiada de todos los xidos, escamas, suciedad,
grasa y cualquier otra sustancia ajena que en la opinin de la Supervisin sea
rechazable.
Todos los detalles y habilitacin, sern efectuados de acuerdo a la
Especificacin ACI-315 "Manual de Prcticas Normales para Detallar
Estructuras de Concreto".
Todos los anclajes y traslapes de las varillas, satisfarn los requisitos de la
Especificacin ACI-318 "Requisitos del Cdigo de Edificacin para Concreto
Armado".
En ningn caso el recubrimiento ser menor a 2.5 cm, en el caso de estructura
en contacto con el agua y en cimentaciones el recubrimiento mnimo ser el
indicado en los planos del proyecto.
METODOS DE MEDICION
Esta partida se medir por Kilogramo (Kg); segn lo indicado en los planos y
aprobado por el Supervisor.
BASES DE PAGO
Esta partida se pagar por Kilogramos. Dicho precio y pago constituir
compensacin total por mano de obra, herramientas, materiales e imprevistos
que se presente.
2.3 MISCELNEO
2.3.1 JUNTA DE DILATACIN C/ SELLO ELASTOMRICO
POLIURETANO e=1
DESCRIPCION
El precio unitario, incluye los costos de mano de obra, materiales,
herramientas necesarios para realizar la colocacin del sellado elastomrico
de poliuretano, para sellado de las juntas de dilatacin de conformidad con los
planos o lo indicado por el Supervisor.
METODO DE CONSTRUCCION
El procedimiento a seguir en la colocacin del sellante elastomrico ser de
acuerdo a las especificaciones del fabricante, limpiando la superficie de todo
material extrao, polvo, impurezas, lechada de cemento y otros, antes de
proceder al relleno.
En el lado en contacto con el agua las juntas a rellenar sern de 1 de ancho
por 1/2" de profundidad del sellador elastomrico de poliuretano; una vez
haber incrustado el aislante compuesto de rodn de espuma de poliolefina de
= 1 y la plancha de tecnopor de 1 de espesor como relleno del sellado.
El Ingeniero Supervisor podr modificar las proporciones, con la finalidad de
mejorar la consistencia de las mezclas.
Prestaciones Incluidas:
Suministro y transporte de material, equipo y mano de obra, para la
realizacin de los trabajos.
Suministro de los diferentes elementos que conformarn las juntas.
Limpieza de las juntas previo a una vaciada.
Confeccin de la junta, incluyendo el encofrado adicional.
METODOS DE MEDICION
La unidad de medida ser el metro lineal (m) con aproximacin a un decimal,
para lo cual se determinar la longitud de junta de contraccin terminada de
acuerdo a los planos u rdenes del Supervisor.
BASES DE PAGO
El pago se efectuar segn el avance mensual realmente ejecutado y aprobado
por el supervisor, de acuerdo al precio unitario contratado para esta partida.
Esta partida se pagar por metro lineal.
3 LINEA DE CONDUCCIN
3.1 MOVIMIENTO DE TIERRAS
3.1.1 LIMPIEZA Y DESBROCE DE TERRENO NATURAL (e = 0.10 m)
(Especificacin tcnica considerada en la partida 2.1.1)
3.3 MISCELANEO
3.3.1 SUMINISTRO E INSTALACIN DE ACCESORIOS PARA PASE
AREO
DESCRIPCIN
Comprende el suministro de los accesorios que se instalarn las obras de arte
proyectadas, de acuerdo a los detalles de los planos y lo indicado por el
supervisor, as como tambin, la mano de obra, herramientas manuales y los
trabajos necesarios para la adecuada instalacin de los accesorios en las obras
de arte proyectadas, tales como captaciones, reservorios, tanques de
amortiguamiento, tomas laterales, y otras.
MODO DE EJECUCIN
Esta partida inicia su instalacin, con el encontrado donde se debe colocar el
codo PVC en la losa y el tubo de salida en uno de los lados del muro, cuyas
ubicaciones se sealan en el plano.
La superficie exterior de los accesorios PVC que estarn en contacto con el
concreto debern estar rugosos (lijados) para que tenga mayor adherencia con
el concreto y no exista fuga de agua.
CONTROLES
El supervisor verificara las dimensiones y disposiciones especificadas en los
planos de diseo para dar la conformidad antes del vaciado con concreto.
MEDICIN Y FORMA DE PAGO
La medicin y forma de pago ser efectuado de forma global (gbl), y
comprende el suministro y colocacin en su disposicin final de todos los
accesorios de la obra de arte, de acuerdo al precio unitario y metrado
especificado del expediente tcnico, entendindose que dicho precio
constituye la compensacin total por toda la mano de obra, equipo,
herramientas, materiales e imprevistos necesarios para la ejecucin del
trabajo.