Escolar Documentos
Profissional Documentos
Cultura Documentos
InstallationOperation&Maintenance
(IOM)for720X
Pressurereductionvalve(double
Chambered)
www.bermad.com.au BermadWaterTechnologies
IOMfor720Xdoublechamber
Introduction
TheBermad720Xdoublechamberpressurereductionvalveisahighlyreactivepressure
reductionvalvethatisdesignedtoenableconstantpressuredownstreamregardlessofinlet
pressureorflow.Thedoublechamberdesignensuresnohydrauliclockoutandfullopening
ifrequiredtominimiseheadloss.
ValveDetails
Thebasic700seriesvalveisconfiguredasdoublechamberwherethelowerdiaphragmis
ventedtoatmosphere.Itiscriticalforoperationthatthislowerchamberisalwaysvented
andneverblockedoff.
Inordertominimisetheminimumheadlossinthevalvetheinnerspringisremoved.
TypicallytheVportplugisusedforregulationshouldtherangeofflowsrequiredisfrom
zeroupwards.IfusingthePRVformediumtohigherflowsonly,thevalvecanbeconfigured
withaflatdiscthatincreasedtheflowcapacityslightly.
www.bermad.com.au BermadWaterTechnologies
IOMfor720Xdoublechamber
Pilotdetails
Inthedoublechamberdesignthereareseveraldifferentdesignsofpilotsavailableinorder
toachievethepressurereductionfunction,eachwithdifferentcharacteristics.Thepilots
areallthreewaypositioningpilotssensinghepressureonthedownstreamside.Some
detailsofthesepilotsareasfollows:
#XR16threewaypositioningpilot
Thispilotisbrassandhasalargerflowpathtoenableveryfastoperationifrequiredon
closingifrequired.Ithasaninbuiltneedlevalvetocontrolopeningspeedshoulditbe
required.
Springrangeforregulation: 116bar
Inletpressurerating: 25bar
Material Brass
PCXAM(Sharp)threewaypositiongpilot
Thispilotisbrassandisusedwherereactionspeedisnotquitesocriticalandgreater
accuracyofcontrolisrequired.Ifopeningspeedadjustabilityisrequired,anexternalneedle
valveisfittedtoport2.
Inletpressurerating:16bar
Material: Brass
Springrangesforregulation:
www.bermad.com.au BermadWaterTechnologies
IOMfor720Xdoublechamber
Pilotdetailsctd/
#8largediameterthreewaypositioningpilot
Thispilotisusedwhenyouneedfastactingbutextremelyaccuracyonregulationwitha
toleranceofplusorminus0.4m.IthastheinbuiltneedlevalvesimilartotheXR16brass
pilottocontrolopeningspeed.
Springrangeforregulation: M6(214m),M5(522m),M4(1535m),M8(2570m)
Pressurerating: 16bar
Material: Brassorstainlesssteel.
www.bermad.com.au BermadWaterTechnologies
IOMfor720Xdoublechamber
Installation
Therearemanydifferentthingsthatareimportantwhenconsideringinstallationofthe
followingvalve,sowesuggestthefollowinginconsideredpriortoinstallation:
1. Makesurethepipeupstreamhasbeenfullyflushedtoclearanypipelinedebristhat
maygetstuckintheinsideofthevalve
2. Makesuretheweightofthevalveisproperlysupportedtoensurethereisnoflexin
thesystem.
3. Makesurethereissufficientroomeithersideofthevalvetoenablemaintenanceof
thevalve.Alsomakesurethereissufficientroomabovethevalvetoremovethe
actuatorwhenitisrequired.
4. Installisolationvalvesclosetothevalvetoenableinternalserviceofthevalve.If
necessary,installabypassaroundthevalvetocontinueflowwhileservicingthe
valve.Ifcriticalthatthereisnotincreaseinpressure,thenfitasmallerbypassPRV
inparallelandorapressurereliefvalveset5mabovethesetpointofthereducing
valve.
5. Thevalveorientationcanbeconfiguredinmanydirectionsincludingvertical,
horizontal,butnotupsidedownasyoucannotventtheairfromthecontrolchamber
correctly.Note:Valvesareplumbedforhorizontalinstallationfromthefactory
unlessspecifiedwhenordering.Makesureifthevalveisbeinginstalledanything
otherthanhorizontal,youmakethefactoryawaresotheycanplumband
configurethevalvesothereisneveranyairinthecontrolchamber.
6. Iftherearegoingtobehighspotsdownstreamofthevalvewhereaircannotbe
released,contactBermadforadviceonthecorrectairreleasevalvetobeinstalled.
7. Ifthepipelineissubjectoratriskofhavinglargersolidspresentinthewater,then
installaBermad70FstrainerpriortothePRV.
Note
Ifeverindoubtaboutthedesignofthestation,contactyournearestBermadofficefor
adviceonhowbesttoconfigurethestationforoptimumperformance
www.bermad.com.au BermadWaterTechnologies
IOMfor720Xdoublechamber
Commissioning
WesuggestthefollowingbeconsideredpriortoanycommissioningofthePRV
1. Makesurethevalveissafelysupportedandthattheinstallationiseasyandsafe
tooperate
2. FlushanydebrisoutofthepipepriortothePRVtodiscardanydebrisinthepipe.
3. Turnadjustmentboltforpilotanticlockwisefullywithnotension.
4. Openinletisolationvalveonvalve(1)inletand(2)outlettothepilot
5. Relaxafittingatthehighestpointonthevalvetoreleaseairfromthecoverof
thevalve.
6. OpenasmallvalvedownstreamofthePRVtoinduceasmallamountofflow
7. Starttoturntheadjustmentboltonthepilotclockwise(nomorethanofaturn
atatime)andwatchthevalveopen.Whenthevalveopens,asmallamountof
waterwillventfromthesideporttoopenthevalve.Donotcontinuetoturnthe
boltuntilthewaterhasstoppedventing.
8. Continuetoturnincrementallywithdelaysuntilthedesiredpressureisreached.
Ifoperatingatextremelylowflows,theventlinemayhavetobesloweddownby
closingdowntheneedlevalve(21)clockwise.Tightenlocknuttocomplete.
ClosedRegulatingFullyOpen
www.bermad.com.au BermadWaterTechnologies
IOMfor720Xdoublechamber
Maintenance
Wesuggestthefollowingmaintenanceiscarriedouttoensurethevalveisoperatingas
designed.
6Monthly
Cleaninletstrainer(#4)
CheckfunctionofPRVbyalteringinletfloworpressuretoseethatthevalveremains
stable.
Checkthepressuregaugeisfunctioningasdesigned
Makesuretheportontheundersideofthediaphragmopentoatmosphereis
alwaysfullyopenedandnotblocked.
12Monthly
Alloftheitemson6monthlylist
Flushcontrolchambercompletelytoremoveanydebrisinthecontrolchamber
Closeneedlevalveonpilotandre0opentothesamesetpointtodislodgeanydebris
ontheseat
5yearly
Alloftheitemsin12monthlyservice
Removetheactuatorandchecktheinternalforanywearontheseat,bodyorseal
discsealofthevalve.
10Yearly
Alloftheitemsin5yearlyservice
Installafullservicekitinthepilotandvalve.
Note:IfinanydoubtasalwayscontactyournearestBermadSalesoffice.
www.bermad.com.au BermadWaterTechnologies
IOMfor720Xdoublechamber
TroubleShooting
Valvefailstooopen
Theneedlevalveisblocked.Closefullyandbackofftosamesetpoint.
Thevalveisalreadyfullyopensotheinletpressureisalmostequaltothe
downstreampressure.ChecktheinletpressurerangetypicallyofthePRV.
Thesetpointofthepilotadjustmentboltisnotcorrect.Increaseclockwiseatofa
turnatatimeuntilthevalveopensandisstableatthecorrectsetpoint.
Theoutletpressureisgreaterthantheinletpressureandthevalveisremaining
closedasitisanonreturnvalve.Checkinletpressures.
Checkballvalves1and2arefullyopenandnotblocked.
Valvefailstooclose
Theinletstrainer(#4)isblocked.Isolateandclean.
Anobjectisunderthemainvalvebodykeepingthebodyfromclosing.Isolatethe
valveandremovetheactuatortocleanthedebrisout.
Theadjustmentboltonthepilotiswoundfullyclockwisetomakethevalvegofully
open.Checktheadjustmentboltonpilotsetting.
Checkballvalves1and2arefullyopenandnotblocked.
Valveisoscillatingonpressuresetpoint.
Theneedlevalveisblocked.Closefullyandbackofftosamesetpoint.
Checkballvalves1and2arefullyopenandnotblocked.
ThereisanairpocketeitherupstreamordownstreamofthePRVthatiscausingthe
airpockettocollapseandexpand.Releaseairorfitcorrectairreleasevalvesto
rectify
Note:Ifinanydoubt,calltheBermadnearestsalesofficeforadvice
www.bermad.com.au BermadWaterTechnologies
BERMAD WW Spare Parts
Accessories
Large Control Filter
60
Effective: Jan/08
BERMAD Spare Parts
700 Series
40
2/05
BERMAD Spare Parts
Pilots
44
2/05
BERMAD Spare Parts
Pilots
48
2/05
BERMAD IR Spare Parts
PC Series
35c
Effective 10/2014
printed on 24/05/2010
* Please note that some items may be used for various sizes and positions.
* Data correct at "Updated" date only, please consult factory for updated data.
1 Elastomers - WW elastomers-700.xls