WI-MAX
Requirement of Wi-MAX
To extend reach and coverage,
WiMAX intends to cater voice, video
and data service requirements of
customers.
To extend wire free reach/coverage
to cluster/pockets with limited or no
wire-line (Fiber/Copper) coverage.
To provide IP and TDM services.
To provide Quality of services.
P2MP Architecture
Internet Traffic

Location 1
WWW
VLAN 2

))))))))))))))))))) Bharti IP-MPLS Bharti Internet


Network Network
VLAN 1

MPLS Traffic

VLAN 1
VLAN 1

)))))))))))))))))))
)))))))))))))))))))

Location 3
Location 2
Service Architecture
Point to Point
G 703, V,35
AES

Point to point
Ethernet
SI/Partner

Bharti TDM
Network

DXC
Bharti IP-MPLS
Network
FTTB/Microwave
Backhaul CPE 3

i-WAN Node
Bharti Internet
Network
Point to Multipoint CPE 2
WWW
Agenda
1.RF-Planning

2.Site Survey
Base Station (BS) Site
Subscriber Station (SS) Site.

3.Installation & Commissioning


BS (Base station )
SS (Subscriber station)
4.Acceptance Test Procedure
Pre AT Checks
Physical AT
Final AT
6) Optimization.
Drive Test
Physical validation
Customer complain.
RF-Planning
Details Required for RF-
Planning
2. Detail of Already exist sites.
3. Hot spots to be covered.
4. Existing Customer Detail.
5. Customer Requirement.
6. Specification of BTS and CPE.
7. No. of CPE support by the BTS.
Steps for RF-Planning

Area Survey to check hot spots


Details of clutter of area.
Location of BS
Sectorial orientation
Location of CPE
Link feasibility
Result of RF-Planning
1. Total Numbers of BS site Required.
2. Optimum Location of BS site.
3. Coverage Area of BS.
4. No. of sector required per BTS.
5. Total BoQ, TSSR required.
6. Customer site feasibility.
7. Throughput required per CPE.
Tools required for RF-
Planning
Spectrum Analyzer
RF Planning-Tool
Map info
MIPT2G
Digital MAP
Frequency Meter
SITE SURVEY
Site survey
Team size 1 Engineer + 1 Technician
1) Check for basic Infra material like tower,
specification of pole, presence of electricity.

2) Existing Radiation Patterns (Height and azimuth


of Anteena,Microwave)

3) Space in the BS site, parabolic photo, cable


length ,CPE survey ,LOS, place for CPE
mounting.

7) Making of site survey Report, with


building,shelter,lay out diagrams.
8) Pole at CPE and Tower Extention at BS if
required
Tools Required For Site-
Survey
1. GPS
2. Digital Camera
3. Measuring Tape
4. Compass
5. Binocular
Proposed pole
GPS Location Building Top view Building side view

Obstruction Details Radiation Pattern Inside shelter diagram


Installation&Commissioni
ng
Tools for Installation & Commissioning

1) Standared Tool kit.


Drilled machine
Crimping tool
Spanner set(7-32)
Screw driver set
Safety kit
2) Test Equipment
VSWR meter
Power meter
Laptop
Installation Procedure
Team size 1 Engineer + 2 Technician + 1 Rigger
Pre Installation checklist.
Installation of IDU,GPS-SSU.
Installation of ODU and Antenna.
Installation of required switches and router, converter.
Routing.
Earthing.
Labeling.
Power connection
GPS Installation
Installation of SS-Antenna
Post Installation checklist.
INSTALLED SURGE ARRESTOR
2M Loop to Jumper cable
Jumper cable
from SA to IDU

IF Cable entering in rack

IF Cable routine from Hatch plate to SA


Commissioning
Team size 1 Engineer
1) Commissioning of BS site including , required
switches, router and converter at site.
2) Integration with NMS.
3) Commissioning of SS site
4) Integration with BS & NMS.
Acceptance
Test
Acceptance Test
Procedure
Team size 1 Engineer + 1 Technician
1) Pre AT Checks including proper routing of
cables according to standards, loose connection
and fault in jumper if any which also include the
physical AT.
2) Details of BS and CPE
3) Link Availability
4) Throughput related
Quality related (latency, Packet loss, jitter etc.)
End to end Service Testing, Ping response.
Final AT done with the customer and hand over
to the Customer.
Optimization
Team size 1 Engineer + 1 Rigger
Drive Test
After completion of site to check the
parameter which
We planned for the networks.

6) Physical Changes
Physical Changes needs to be done
Like swapping, Handover, change the tilt
, height and the azimuth of the sector
for the
good coverage.
3) Drive Test On customer complain or For
Infiller sites.
EVERYBODY IN THE NETWORK