Embankment

sta ngl fge diff. in elev l w


2+100 85.95 91.248 5.298 0 150
2+120 85.34 91.188 5.848 20 150
2+140 86 91.126 5.126 20 150
2+160 84.34 91.068 6.728 20 150
2+180 84.58 91.009 6.429 20 150
2+200 84.31 90.951 6.641 20 150
2+220 86 90.894 4.894 20 150
2+240 84 90.839 6.839 20 150
2+260 86.08 90.784 4.704 20 150
2+273.5 86.268 90.748 4.48 13.5 150
2+280 86.36 90.73 4.37 6.5 150
2+300 86.61 90.677 4.067 20 150
2+320 86.81 90.626 3.816 20 185
2+340 86.85 90.575 3.725 20 185
2+360 86.89 90.525 3.635 20 185
2+380 86.94 90.477 3.537 20 185
2+400 87 90.429 3.429 20 185
2+408.5 87.059 90.411 3.352 8.5 185
2+420 87.55 90.383 2.833 11.5 185
2+440 88.01 90.337 2.327 20 185
2+460 88.91 90.293 1.383 20 185
2+480 89 90.25 1.25 20 185
2+500 88.74 90.207 1.467 20 75
2+500B 88.74 90.207 1.467 0 75
2+520 88.32 90.166 1.846 20 75
2+540 87.77 90.126 2.356 20 75
2+560 87.08 90.087 3.007 20 75
2+580 86.46 90.048 3.588 20 75
2+600 84.58 90.011 5.431 20 75
2+620 86.41 89.975 3.565 20 75

ECONOCRETE

L W THCK VOL
460 45 0.25 5,175.00
135 55 0.25 928.13
91.5 55 0.25 1,258.13
7,361.25 M3

PCCP W/30MM PLAIN DOWEL BARS W/28MM TIE BAR

L W THCK VOL
460 45 0.4 8,280.00
135 55 0.4 1,485.00
91.5 55 0.4 2,013.00
11,778.00 M3

SHOULDERS

GRAVEL SUBBASE

L W THCK VOL
697.27 15 0.15 1,568.86 M3

CRUSHED AGG BASE COURSE

L W THCK VOL
697.27 15 0.1 1,045.91 M3

ASPHALT CONCRETE

L W THCK VOL
697.27 15 0.075 784.43 M3

BIT. PRIME COAT

L W AREA
697.27 15 10,459.05 M2

SODDING (CARABAO GRASS)

L W AREA
693.5 15 10,402.50
135 44 2,970.00
91.5 44 4,026.00
17,398.50 M2

TOP SOIL

L W THK VOLUME
693.5 15 0.05 520.13
135 44 0.05 297.00
91.5 44 0.05 201.30
920 1,018.43 M3

PAVEMENT MARKINGS 2,325.54 M2

TOUCHDOWN ZONE MARKINGS


L W # AREA
22.5 3 4 270.00 M2

THRESHOLD MARKING
L W # AREA
30 1.8 14 756.00 M2

RUNWAY TURN PAD MARKING


L W AREA
447.02 0.6 268.21 M2

RUNWAY SIDE STRIPE MARKING


L W AREA
920 0.9 828.00 M2

RUNWAY CENTERLINE MARKING


L W # AREA
30 0.45 6 81.00 M2

RUNWAY DESIGNATION MARKING


L W AREA
30.9 1.5 46.35 M2

ZEBRA MARKING
L W AREA
84.42 0.9 75.98 M2

MANHOLE 8 UNITS @ 10,920.00 CONCRETE


150 CHB
16MM RSB
12MM RSB

LABOR
DUCTS

2 PIPES 1 SET
L W THK VOLUME
75 0.42 0.25 7.875 M3
RSB
10MM 187.5 281.25 46.875
12MM 450 75 26250
WARNING TAPE, 150MM 2500
2SQ.M HOT DIPPED GALVANIZED STEEL WIRE 26250
PVC PIPE 110MM 2 PCS 400
6 PIPES 1 SET

8 PIPES 2 SET

summary

description qty unit unit price total

temfacil 1.00 ls 150,000.00 150,000.00


Embankment 369,782.97 m3 400.00 147,913,188.75
ECONOCRETE 7,361.25 m3 4,500.00 33,125,625.00
PCCP 11,778.00 m3 7,500.00 88,335,000.00
GRAVEL SUBBASE 1,568.86 m3 985.00 1,545,324.64
CRUSHED AGG BASE COURSE 1,045.91 m3 1,200.00 1,255,086.00
ASPHALT CONCRETE 784.43 m3 6,000.00 4,706,572.50
BIT. PRIME COAT 10,459.05 m2 90.00 941,314.50
SODDING (CARABAO GRASS) 17,398.50 m2 30.00 521,955.00
TOP SOIL 1,018.43 m3 200.00 203,685.00
PAVEMENT MARKINGS 2,325.54 m2 80.00 186,043.20
MANHOLE 8 units 10,920.00 87,360.00
DUCTS 4 units 532,012.50 2,128,050.00

total 281,099,204.59
compact. volume,
Allowance m3
0.25 -
0.25 21,930.00
0.25 19,222.50
0.25 25,230.00
0.25 24,108.75
0.25 24,903.75
0.25 18,352.50
0.25 25,646.25
0.25 17,640.00
0.25 11,340.00
0.25 5,325.94
0.25 15,251.25
0.25 17,649.00
0.25 17,228.13
0.25 16,811.88
0.25 16,358.63
0.25 15,859.13
0.25 6,588.78
0.25 7,534.01
0.25 10,762.38
0.25 6,396.38
0.25 5,781.25
0.25 2,750.63
0.25 -
0.25 3,461.25
0.25 4,417.50
0.25 5,638.13
0.25 6,727.50
0.25 10,183.13
0.25 6,684.38

369,782.97 m3 400 147,913,188.75


18225
3025
21250
2100
1100
800
3800
7800
3120
177,337.50

11812.5

103125

532,012.50

1,418,700.00
2,128,050.00
532,012.50