OBRA: UBICACIN:
PROPIETARIO: FECHA:
SUPERVISOR:
8.00 2,441.20
12.00 558.36 12.00 558.36 28.00 1,302.84 30.00
50.00 247.00 50.00 247.00 450.00 2,223.00 10.00
9.00 2,512.98
72.00 2,381.04 72.00 2,381.04 48.00 1,587.36 60.00
140.00 691.60 140.00 691.60 560.00 2,766.40 20.00
408.00 1,089.36 408.00 1,089.36 612.00 1,634.04 40.00
OBRA: AMPLIACION
CONTRATISTA: P.B= 43,789.98
ESPECIALIDAD: ESTRUCTURAS FECHA= AG.
AREA GEOGRAFICA: 02
ABRIL
MONOMIO DESCRIPCION SIMBOLO I.U C.I % Io
1 CEMENTO P.T 1 21 72.93 367.31
PIEDRA CHANCADA CPM 5 0.133 17.29 216.5
MAQUINARIA NACIONAL 48 9.78 354.51
2 LADRILLO ARCILLA 17 11.93 676.62
LA 0.109
ARENA GRUESA 4 88.07 899.62
3 MADERA NACIONAL P/ENCOFRADO 43 0.103 89.32 599.6
DH
HERR. 37 10.68 296.12
4 ACERO CORRUGADO F 3 0.170 100.00 505.2
5 MANO DE OBRA INC. BS J 47 0.285 100.00 523.15
6 G.G.U G.G.U 39 0.200 100.00 411.5
AG.
Ir K
367.31
219.12 0.133
359.33
666.35 0.109
899.56
608.82 0.105
296.63
462.12 0.156
544.59 0.297
418.64 0.203
1.002
CLCULO DE REINTEGROS Y DEDUCCIONES
OBRA:
SUPERVISOR:
CONTRATISTA:
PRESUPUESTO BASE:
PRESUPUESTO CONTRATADO:
D = DEDUCCION Ka=
VRC = V x K - A x V / C (K / Ka - 1)
Rprog= Vprog(K-1)
R= V ( K-1) Rreal= Vreal(K-1)
REINTEGROS
DEDUCCIN
AMORTIZACIN
OBRA:
SUPERVISOR:
CONTRATISTA:
PRESUPUESTO BASE: 43,789.98
PRESUPUESTO CONTRATADO: 42,850.55
VALORIZACION
MONTO CONTRATADO
DESCRIPCIN ANTERIOR ACTUAL
SIN IGV (S/.)
(S/.) (S/.)
TOTAL CONTRACTUAL
Avances en porcentaje
DEDUCCIONES (D)
POR ADELANTO EN EFECTIVO 0.00 0.00
POR ADELANTO PARA MATERIALES 0.00 0.00
AMORTIZACIONES (A)
AMORTIZACION DEL ADELANTO EN EFECTIVO 0.00 0.00
AMORTIZACION DEL ADELANTO PARA MATERIALES 0.00 0.00
13,527.42
RETENCIONES ( C )
FONDOS DE GARANTIA (5% X VB)
GASTOS DE LICITACION
MULTA POR ATRASO DE OBRA
TOTAL
ALORIZACION
% DE AVANCE SALDO POR
ACUMULADO ACUMULADO VALORIZAR (S/.)
(S/.)
50.31
0.00
0.00
0.00
0.00
/. 15,962.36