Você está na página 1de 22

HOJA DE METR

COMPONENTE: ARQUITECTURA

ITEM DESCRIPCION UND CANT

06 CERCO PERIMETRICO
06.01 ARQUITECTURA
06.01.01 MUROS Y TABIQUES DE ALBAILERIA
06.01.01.01 MURO DE SOGA LADRILLO MECANIZADO DE 18 HUECOS (ARCILLA) M2

MURO
LADO - A
MURO 1.00

LADO - B
MURO 1.00

LADO - C
MURO 1.00

DESCUENTO POR COLUMNAS


LADO - A
COLUMNA (CA - 3) 1.00

LADO - B
COLUMNA (CA - 3) 1.00
COLUMNA (CA - 4) 1.00

LADO - C
COLUMNA (CA - 3) 1.00
COLUMNA (CA - 6) 1.00

06.01.02 REBOQUES ENLUCIDOS Y MOLDURAS


06.01.02.01 TARRAJEO EN MUROS ACABADO CON CEMENTO-ARENA

MURO

LADO - A
MURO 1.00

LADO - B
MURO 1.00

LADO - C
MURO 1.00

DESCUENTO POR COLUMNAS


HOJA DE METR

COMPONENTE: ARQUITECTURA

ITEM DESCRIPCION UND CANT

LADO - A
COLUMNA (CA - 3) 1.00

LADO - B
COLUMNA (CA - 3) 1.00
COLUMNA (CA - 4) 1.00

LADO - C
COLUMNA (CA - 3) 1.00
COLUMNA (CA - 6) 1.00

06.01.02.02 TARRAJEO EN SOBRECIMIENTOS MEZCLA C:A M2

TARRAJEO EN SOBRECIMIENTOS
LADO - A
SOBRE CIMINETO 1.00

LADO - B
SOBRE CIMIENTO 1.00

LADO - C
SOBRE CIMIENTO 1.00

LADO - D
SOBRE CIMIENTO 1.00

06.01.02.03 TARRAJEO EN COLUMNAS M2

LADO - A
COLUMNA (CA - 3) 10.00
COLUMNA (CA - 3) 10.00

LADO - B
COLUMNA (CA - 3) 11.00
COLUMNA (CA - 4) 2.00

LADO - C
COLUMNA (CA - 3) 6.00
COLUMNA (CA - 6) 2.00

LADO - D
COLUMNA (CA - 3) 10.00

06.01.02.04 TARRAJEO EN VIGAS M2

LADO - B
HOJA DE METR

COMPONENTE: ARQUITECTURA

ITEM DESCRIPCION UND CANT

VIGA 1.00

LADO - C
VIGA 1.00

LADO - D
VIGA 1.00

06.01.02.05 JUNTA DE CONSTRUCCION CON TEKNOPORT ML

JUNTA 10.00

06.01.02.06 BRUAS DE 1 CM ML

LADO - A 1.00
LADO - B 1.00
LADO - C 1.00
LADO - A 1.00

06.01.03 TECHO Y COBERTURA

06.01.03.01 COBERTURA CON LADRILLO PASTELERO M2


LADO - B-C-D 1.00

06.01.04 CARPINTERIA METALICA

06.01.04.01 PUERTA METALICA M2


PUERTA PRINCIPAL 1.00

06.01.04.02 REJAS METALICAS CON ANGULO DE 1" ML

REJA
FRENTERA 1.00

06.01.05 CERRAJERIA UND


06.01.05.01 CHAPA PARA EXTERIOR, CON LLAVES INTERIOR Y EXTERIOR 3 GOLPES
CHAPA PUERTA PRINCIPAL 1.00

06.01.06 PINTURAS

06.01.06.01 PINTURA ESMALTE EN SOBRECIMIENTO M2 1

06.01.06.02 PINTURA LATEX EN COLUMNAS M2 1

06.01.06.03 PINTURA ESMALTE EN VIGAS M2 1

06.01.06.04 PINTURA ANTICORROSIVO EN PUERTA METALICA M2 1


HOJA DE METR

COMPONENTE: ARQUITECTURA

ITEM DESCRIPCION UND CANT

06.01.06.05 PINTURA ANTICORROSIVO EN REJAS METALICAS M2 1


HOJA DE METRADOS

FECHA: MAYO DEL 2017

METRADOS
N
OBSERVACIONES
VECES
DESCUENT
AREA ANCHO LARGO ALTO SUB. TOT TOTAL
O VANOS

203.369

220.76
79.195
1.00 33.70 2.35 79.20

58.14
1.00 24.74 2.35 58.14

83.43
1.00 35.50 2.35 83.43

17.39
5.88
10.00 0.25 2.35 5.88

3.76
4.00 0.25 2.35 2.35
2.00 0.30 2.35 1.41

7.76
12.00 0.25 2.35 7.05
1.00 0.30 2.35 0.71

203.369

220.76

79.195
1.00 33.70 2.35 79.20

58.14
1.00 24.74 2.35 58.14

83.43
1.00 35.50 2.35 83.43

17.39
HOJA DE METRADOS

FECHA: MAYO DEL 2017

METRADOS
N
OBSERVACIONES
VECES
DESCUENT
AREA ANCHO LARGO ALTO SUB. TOT TOTAL
O VANOS
5.88
10.00 0.25 2.35 5.88

3.76
4.00 0.25 2.35 2.35
2.00 0.30 2.35 1.41

7.76
12.00 0.25 2.35 7.05
1.00 0.30 2.35 0.71

57.680

57.680
19.44
2.00 24.30 0.40 19.44

14.56
1.00 36.40 0.40 14.56

10.00
1.00 25.00 0.40 10.00

13.68
1.00 34.20 0.40 13.68

43.36

18.80
2.00 0.25 2.35 11.75
2.00 0.15 2.35 7.05

7.87
1.00 0.25 2.35 6.46
1.00 0.30 2.35 1.41

4.94
1.00 0.25 2.35 3.53
1.00 0.30 2.35 1.41

11.75
2.00 0.25 2.35 11.75

21.46

6.60
HOJA DE METRADOS

FECHA: MAYO DEL 2017

METRADOS
N
OBSERVACIONES
VECES
DESCUENT
AREA ANCHO LARGO ALTO SUB. TOT TOTAL
O VANOS
1.00 26.40 0.25 6.60

6.31
1.00 25.23 0.25 6.31

8.55
1.00 34.20 0.25 8.55

30.00

1.00 3.00 30.00

364.60

1.00 8.00 8.00


1.00 140.95 140.95
1.00 86.15 86.15
1.00 129.50 129.50

23.01
1.00 23.01 23.01

6.75
1.00 2.25 3.00 6.75

242.62

242.62
1.00 242.62 242.62

1.00
1.00 1.00

1 57.68

1 43.3575

1 21.4575

1 6.75
HOJA DE METRADOS

FECHA: MAYO DEL 2017

METRADOS
N
OBSERVACIONES
VECES
DESCUENT
AREA ANCHO LARGO ALTO SUB. TOT TOTAL
O VANOS

1 0.62
HOJA DE METR

PROYECTO: MEJORAMIENTO DE LA OFERTA DE SERVICIOS EDUCATIVOS DEL NIVEL INICIAL


HUALLUYO, PUNAPAMPA, OCRABAMBA, PAYANCCA Y LLACTACUNCA, DEL DISTRITO DE TAM

REGION: APURIMAC PROVINCIA: COTABAMBAS DISTRITO: TAMBOBAM

COMPONENTE: ARQUITECTURA

ITEM DESCRIPCION UND CANT

07 VEREDAS
07.01 ARQUITECTURA

07.01.01. PISOS Y PAVIMENTOS


07.01.01.01 EMPEDRADO CON PIEDRA MEDIANA DE 6" M2
BLOQUE A
VEREDA PRONTAL 1.00
LADO DERECHO 1.00
POSTERIOR 1.00

BLOQUE B
VEREDA PRONTAL 1.00
LADO DERECHO 1.00
POSTERIOR 1.00

BLOQUE C
VEREDA PRONTAL 1.00
1.00
LADO DERECHO 1.00
POSTERIOR 1.00

BLOQUE D
VEREDA PRONTAL 1.00
LADO IZQUIERDO 1.00
POSTERIOR 1.00

BLOQUE E
VEREDA PRONTAL 1.00
LADO DERECHO 1.00
LADO IZQUIERDO 1.00
POSTERIOR 1.00

07.01.01.02 CONCRETO f'c=175 kg/cm2 M3


VEREDA
BLOQUE A 1.00
BLOQUE B 1.00
BLOQUE C 1.00
BLOQUE D 1.00
BLOQUE E 1.00

SARDINEL
BLOQUE A 1.00
BLOQUE B 1.00
BLOQUE C 1.00
HOJA DE METR

PROYECTO: MEJORAMIENTO DE LA OFERTA DE SERVICIOS EDUCATIVOS DEL NIVEL INICIAL


HUALLUYO, PUNAPAMPA, OCRABAMBA, PAYANCCA Y LLACTACUNCA, DEL DISTRITO DE TAM

REGION: APURIMAC PROVINCIA: COTABAMBAS DISTRITO: TAMBOBAM

COMPONENTE: ARQUITECTURA

ITEM DESCRIPCION UND CANT

BLOQUE D 1.00
BLOQUE E 1.00

07.01.01.03 ENCOFRADO Y DESENCOFRADO M2


BLOQUE A 1.00
BLOQUE B 1.00
BLOQUE C 1.00
BLOQUE D 1.00
BLOQUE E 1.00

07.01.01.04 BRUAS DE 1 CM M
BLOQUE A
VEREDA PRONTAL 8.00
LADO DERECHO 1.00
POSTERIOR 8.00

BLOQUE B
VEREDA PRONTAL 3.00
LADO DERECHO 2.00
POSTERIOR 4.00

BLOQUE C
VEREDA PRONTAL 2.00
LADO DERECHO 1.00
POSTERIOR 1.00

BLOQUE D
VEREDA PRONTAL 4.00
LADO IZQUIERDO 1.00
POSTERIOR 1.00

BLOQUE E
VEREDA PRONTAL 3.00
LADO DERECHO 1.00
LADO IZQUIERDO 1.00
POSTERIOR 1.00

07.01.01.05 JUNTAS ASFLATICA E=1CM M


BLOQUE A
VEREDAS 1.00

BLOQUE B
VEREDAS 1.00

BLOQUE C
VEREDA PRONTAL 1.00
HOJA DE METR

PROYECTO: MEJORAMIENTO DE LA OFERTA DE SERVICIOS EDUCATIVOS DEL NIVEL INICIAL


HUALLUYO, PUNAPAMPA, OCRABAMBA, PAYANCCA Y LLACTACUNCA, DEL DISTRITO DE TAM

REGION: APURIMAC PROVINCIA: COTABAMBAS DISTRITO: TAMBOBAM

COMPONENTE: ARQUITECTURA

ITEM DESCRIPCION UND CANT

BLOQUE D
VEREDAS 1.00

BLOQUE E
VEREDAS 1.00

08 RAMPAS Y OTROS
08.01 ARQUITECTURA

08.01.01 CARPINTERIA METALICA


08.01.01.01 INTALACION DE JUEGOS MECANICOS INC. ACABADO GLB
JUEGOS MECANICOS 1

08.01.01.01 INSTALACION Y ARMADO DE BARANDA METALICA INC. ACABADO M


RAMPA
LADO DERECHO 1
LADO IZQUIERDO 1

08.01.02 TECHO Y COBERTURA


08.01.02.01 COBERTURA CON CALAMINOM TIPO AL, DE COLORES (InM2
RAMPA
PAO 1 12.00
PAO2 1.00

COBERTURA CON POLICARBONATO ALVEOLAR DE 10mm


08.01.02.02 M2
TRANSPARENTE (Inc accesorios)
PATIO PRINCIPAL
TRAMO DE COBERTURA ELEVADA 3.00
TRAMO DE COBERTURA BAJO 2.00

08.01.02.03 CORREAS CON TUBO RECTANGULAR LAC DE 2" X 2" M


RAMPA
CORREAS METALICAS 5.00
CORRES METALICA 5.00

08.01.02.04 CORREA METALICA TUBO 40x60x2.5MM M


PATIO PRINCIPAL
TRAMO DE COBERTURA ELEVADA 13.00
TRAMO DE COBERTURA BAJO 13.00

09 TRATAMIENTOS DE AREAS VERDES


09.01 ARQUITECTURA

09.01.01 AREAS VERDE CON GRAS NATURAL


09.01.01.01 PREPARADO DE TIERRA ORGANICA M3
BLOQUE B 1.00
HOJA DE METR

PROYECTO: MEJORAMIENTO DE LA OFERTA DE SERVICIOS EDUCATIVOS DEL NIVEL INICIAL


HUALLUYO, PUNAPAMPA, OCRABAMBA, PAYANCCA Y LLACTACUNCA, DEL DISTRITO DE TAM

REGION: APURIMAC PROVINCIA: COTABAMBAS DISTRITO: TAMBOBAM

COMPONENTE: ARQUITECTURA

ITEM DESCRIPCION UND CANT

BLOQUE C 1.00
BLOQUE D 1.00
BLOQUE E 1.00

09.01.01.02 SEMBRADO DE GRAS NATURAL M2


BLOQUE B 1.00
BLOQUE C 1.00
BLOQUE D 1.00
BLOQUE E 1.00

09.01.02 AREA VERDE CON GRAS ARTIFICIAL


09.01.02.01 ENROCADO CON PIEDRA GRANDE DE 8"
PATIO PRINCIPAL 1.00

09.01.02.02 SUB BASE CON GRABA


PATIO PRINCIPAL 1.00

09.01.02.03 NIVELACION Y COMPACTADO CON ARENA GRANULAR M3


PATIO PRINCIPAL 1.00

09.01.02.04 COLOCADO DE GRAS SINTETICO M2


PATIO PRINCIPAL 1.00
HOJA DE METRADOS

EL NIVEL INICIAL ESCOLARIZADO DE LAS I.E.I DE LAS C.C. DE ANTUYO, ALLAHUA, CHULLUPATA,
DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS APURIMAC

STRITO: TAMBOBAMBA LUGAR:. PALLCCARO

FECHA: MAYO DEL 2017

METRADOS
N
OBSERVACIONES
VECES
DESCUENT
AREA ANCHO LARGO ALTO SUB. TOT TOTAL
O VANOS

228.323
78.38
1.00 1.70 25.80 43.86
1.00 5.34 5.34
1.00 29.18 29.18

27.99
1.00 1.70 7.88 13.40
1.00 4.87 4.87
1.00 0.81 12.00 9.72

29.38
1.00 1.70 7.32 12.44
1.00 1.00 2.95 2.95
1.00 0.75 8.20 6.15
1.00 0.75 10.45 7.84

48.93
1.00 1.70 14.35 24.40
1.00 0.75 6.30 4.73
1.00 19.81 19.81

43.65
1.00 1.70 15.42 26.21
1.00 0.76 6.40 4.86
1.00 6.34 6.34
1.00 0.53 11.75 6.23

23.6728
11.42
1.00 78.38 0.05 3.92
1.00 27.99 0.05 1.40
1.00 29.38 0.05 1.47
1.00 48.93 0.05 2.45
1.00 43.65 0.05 2.18

12.26
1.00 0.15 61.46 0.35 3.23
1.00 0.15 30.00 0.35 1.58
1.00 0.15 50.45 0.35 2.65
HOJA DE METRADOS

EL NIVEL INICIAL ESCOLARIZADO DE LAS I.E.I DE LAS C.C. DE ANTUYO, ALLAHUA, CHULLUPATA,
DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS APURIMAC

STRITO: TAMBOBAMBA LUGAR:. PALLCCARO

FECHA: MAYO DEL 2017

METRADOS
N
OBSERVACIONES
VECES
DESCUENT
AREA ANCHO LARGO ALTO SUB. TOT TOTAL
O VANOS
1.00 0.15 48.85 0.35 2.56
1.00 0.15 42.70 0.35 2.24

108.972
1.00 61.46 0.4 24.58
1.00 30.00 0.4 12.00
1.00 74.20 0.4 29.68
1.00 64.07 0.4 25.63
1.00 42.70 0.4 17.08

430.93
163.55
1.00 12.00 96.00
1.00 8.67 8.67
1.00 7.36 58.88

57.20
1.00 8.96 26.88
1.00 6.76 13.52
1.00 4.20 16.80

47.80
1.00 10.00 20.00
1.00 11.80 11.80
1.00 16.00 16.00

92.60
1.00 11.80 47.20
1.00 12.70 12.70
1.00 32.70 32.70

69.78
1.00 11.10 33.30
1.00 10.80 10.80
1.00 8.20 8.20
1.00 17.48 17.48

55.89
21.30
1.00 21.30 21.30

5.75
1.00 5.75 5.75

6.95
1.00 6.95 6.95
HOJA DE METRADOS

EL NIVEL INICIAL ESCOLARIZADO DE LAS I.E.I DE LAS C.C. DE ANTUYO, ALLAHUA, CHULLUPATA,
DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS APURIMAC

STRITO: TAMBOBAMBA LUGAR:. PALLCCARO

FECHA: MAYO DEL 2017

METRADOS
N
OBSERVACIONES
VECES
DESCUENT
AREA ANCHO LARGO ALTO SUB. TOT TOTAL
O VANOS
11.82
1.00 11.82 11.82

10.07
1.00 10.07 10.07

1
1 1

89.88
89.88
1 41.42 41.42
1 48.46 48.46

96.30
96.30
1.00 2.57 3.00 92.52
1.00 2.57 1.47 3.78

279.462
279.46
1.00 4.30 14.10 181.89
1.00 3.46 14.10 97.57

195
195.00
12.00 3.00 180.00
1.00 3.00 15.00

253.5
253.50
3.00 4.26 166.14
2.00 3.36 87.36

11.088
1.00 7.78 0.2 1.56
HOJA DE METRADOS

EL NIVEL INICIAL ESCOLARIZADO DE LAS I.E.I DE LAS C.C. DE ANTUYO, ALLAHUA, CHULLUPATA,
DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS APURIMAC

STRITO: TAMBOBAMBA LUGAR:. PALLCCARO

FECHA: MAYO DEL 2017

METRADOS
N
OBSERVACIONES
VECES
DESCUENT
AREA ANCHO LARGO ALTO SUB. TOT TOTAL
O VANOS
1.00 30.04 0.2 6.01
1.00 11.38 0.2 2.28
1.00 6.24 0.2 1.25

55.44
1.00 7.78 7.78
1.00 30.04 30.04
1.00 11.38 11.38
1.00 6.24 6.24

134.695
1.00 7.9 17.05 134.70

134.695
1.00 7.9 17.05 134.70

26.939
1.00 7.90 17.05 0.20 26.94

134.695
1.00 7.90 17.05 134.70
HOJA DE METR

PROYECTO: MEJORAMIENTO DE LA OFERTA DE SERVICIOS EDUCATIVOS DEL NIVEL INICIAL


HUALLUYO, PUNAPAMPA, OCRABAMBA, PAYANCCA Y LLACTACUNCA, DEL DISTRITO DE TAM

REGION: APURIMAC PROVINCIA: COTABAMBAS DISTRITO: TAMBOBAM

COMPONENTE: ARQUITECTURA

ITEM DESCRIPCION UND CANT

10 OBRAS EXTERIORES
10.01 ESTRUCTURAS
VEREDAS Y ZARDINEL
10.01.01 TRABAJOS PRELIMINARES
10.01.01.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR M2
BLOQUE A
VEREDA PRONTAL 1.00
LADO DERECHO 1.00
POSTERIOR 1.00

BLOQUE B
VEREDA PRONTAL 1.00
LADO DERECHO 1.00
POSTERIOR 1.00

BLOQUE C
VEREDA PRONTAL 1.00
1.00
LADO DERECHO 1.00
POSTERIOR 1.00

BLOQUE D
VEREDA PRONTAL 1.00
LADO IZQUIERDO 1.00
POSTERIOR 1.00

BLOQUE E
VEREDA PRONTAL 1.00
LADO DERECHO 1.00
LADO IZQUIERDO 1.00
POSTERIOR 1.00

10.01.01.02 LIMPIEZA DE TERRENO MANUAL M2


BLOQUE A
VEREDA PRONTAL 1.00
LADO DERECHO 1.00
POSTERIOR 1.00

BLOQUE B
VEREDA PRONTAL 1.00
LADO DERECHO 1.00
POSTERIOR 1.00

BLOQUE C
HOJA DE METR

PROYECTO: MEJORAMIENTO DE LA OFERTA DE SERVICIOS EDUCATIVOS DEL NIVEL INICIAL


HUALLUYO, PUNAPAMPA, OCRABAMBA, PAYANCCA Y LLACTACUNCA, DEL DISTRITO DE TAM

REGION: APURIMAC PROVINCIA: COTABAMBAS DISTRITO: TAMBOBAM

COMPONENTE: ARQUITECTURA

ITEM DESCRIPCION UND CANT

VEREDA PRONTAL 1.00


1.00
LADO DERECHO 1.00
POSTERIOR 1.00

BLOQUE D
VEREDA PRONTAL 1.00
LADO IZQUIERDO 1.00
POSTERIOR 1.00

BLOQUE E
VEREDA PRONTAL 1.00
LADO DERECHO 1.00
LADO IZQUIERDO 1.00
POSTERIOR 1.00

10.01.02 MOVIMIENTO DE TIERRAS


10.01.02.01 EXCAVACION MANUAL TERRENO M2
VEREDA
BLOQUE A 1.00
BLOQUE B 1.00
BLOQUE C 1.00
BLOQUE D 1.00
BLOQUE E 1.00

SARDINEL
BLOQUE A 1.00
BLOQUE B 1.00
BLOQUE C 1.00
BLOQUE D 1.00
BLOQUE E 1.00

10.01.02.02 NIVELACION Y COMPACTADO EN PISO M2


VEREDA 1.00

10.01.02.03 ELIMINACION MATERIAL EXCEDENTE M3


VEREDA Y SARDINEL 1.00
HOJA DE METRADOS

EL NIVEL INICIAL ESCOLARIZADO DE LAS I.E.I DE LAS C.C. DE ANTUYO, ALLAHUA, CHULLUPATA,
DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS APURIMAC

STRITO: TAMBOBAMBA LUGAR:. PALLCCARO

FECHA: MAYO DEL 2017

METRADOS
N
OBSERVACIONES
VECES
DESCUENT
AREA ANCHO LARGO ALTO SUB. TOT TOTAL
O VANOS

228.32
78.38
1.00 1.70 25.80 43.86
1.00 5.34 5.34
1.00 29.18 29.18

27.99
1.00 1.70 7.88 13.40
1.00 4.87 4.87
1.00 0.81 12.00 9.72

29.38
1.00 1.70 7.32 12.44
1.00 1.00 2.95 2.95
1.00 0.75 8.20 6.15
1.00 0.75 10.45 7.84

48.93
1.00 1.70 14.35 24.40
1.00 0.75 6.30 4.73
1.00 19.81 19.81

43.65
1.00 1.70 15.42 26.21
1.00 0.76 6.40 4.86
1.00 6.34 6.34
1.00 0.53 11.75 6.23

228.32
78.38
1.00 1.70 25.80 43.86
1.00 5.34 5.34
1.00 29.18 29.18

27.99
1.00 1.70 7.88 13.40
1.00 4.87 4.87
1.00 0.81 12.00 9.72

29.38
HOJA DE METRADOS

EL NIVEL INICIAL ESCOLARIZADO DE LAS I.E.I DE LAS C.C. DE ANTUYO, ALLAHUA, CHULLUPATA,
DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS APURIMAC

STRITO: TAMBOBAMBA LUGAR:. PALLCCARO

FECHA: MAYO DEL 2017

METRADOS
N
OBSERVACIONES
VECES
DESCUENT
AREA ANCHO LARGO ALTO SUB. TOT TOTAL
O VANOS
1.00 1.70 7.32 12.44
1.00 1.00 2.95 2.95
1.00 0.75 8.20 6.15
1.00 0.75 10.45 7.84

48.93
1.00 1.70 14.35 24.40
1.00 0.75 6.30 4.73
1.00 19.81 19.81

43.65
1.00 1.70 15.42 26.21
1.00 0.76 6.40 4.86
1.00 6.34 6.34
1.00 0.53 11.75 6.23

43.00
34.25
1.00 78.38 0.15 11.76
1.00 27.99 0.15 4.20
1.00 29.38 0.15 4.41
1.00 48.93 0.15 7.34
1.00 43.65 0.15 6.55

8.75
1.00 0.15 61.46 0.25 2.30
1.00 0.15 30.00 0.25 1.13
1.00 0.15 50.45 0.25 1.89
1.00 0.15 48.85 0.25 1.83
1.00 0.15 42.70 0.25 1.60

228.32
1.00 228.32 228.32

45.15
1.00 43.00 43.00 ESPONJAMIENTO DEL 5%
HOJA DE METR

PROYECTO: MEJORAMIENTO DE LA OFERTA DE SERVICIOS EDUCATIVOS DEL NIVEL INICIAL


HUALLUYO, PUNAPAMPA, OCRABAMBA, PAYANCCA Y LLACTACUNCA, DEL DISTRITO DE TAM

REGION: APURIMAC PROVINCIA: COTABAMBAS DISTRITO: TAMBOBAM

COMPONENTE: ARQUITECTURA

ITEM DESCRIPCION UND CANT

06 DEMOLICIONES

11 ESTRUCTURAS
REMOCIONES
REMOCIONES DE VANOS (VENTANAS, PUERTAS) UND
VENTANAS 19.00
PUERTAS 10.00

REMOCION DE COBERTURAS M2
COBERTUA DE CALAMINAS GALVANIZADAS
CONSTRUCCIONES DE ADOBE 1.00

COBERTURA DE TEJA DE ARCILLA


CONSTRUCCIONES DE CONCRETO ARMADO 1.00

DEMOLICIONES
DEMOLICIONES DE CONSTRUCCIONES EXISTENTES M3

CONSTRUCCIONES EN ADOBE 1.00


CONSTRUCIONES EN CONCRETO ARMADO 1.00

ELIMINACION DE MATERIAL DE DEMOLICION M3


CONSTRUCCIONES EN ADOBE 1.00
CONSTRUCCIONES EN CONCRETO ARMADO 1.00
HOJA DE METRADOS

EL NIVEL INICIAL ESCOLARIZADO DE LAS I.E.I DE LAS C.C. DE ANTUYO, ALLAHUA, CHULLUPATA,
DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS APURIMAC

STRITO: TAMBOBAMBA LUGAR:. PALLCCARO

FECHA: MAYO DEL 2017

METRADOS
N
OBSERVACIONES
VECES
DESCUENT
AREA ANCHO LARGO ALTO SUB. TOT TOTAL
O VANOS

29.00
1.00 19.00
1.00 10.00

423.97
190.30
1.00 190.3 190.30

233.67
1.00 233.67 233.67

114.30

1.00 46.44 46.44


1.00 67.86 67.86

160.02
1.00 46.44 46.44
1.00 67.86 67.86