Site cleaning
Bore well digging
o Bore
o Bore Well vendors
Temporary Shed construction
Site Marking
Sump construction
o Soil digging for sump
o Sump Construction
Foundation digging
o Soil digging for Pillars
o Soil digging for foundation [OR] Paya
Start carpenter work for window frames and door frames
Footing [OR] Pillar base
Pillars until Plinths
Stone Foundation [OR] paya
Plinth beam
Fill soil inside Plinth area.
Filling 40 MM Jelly on top of Soil this will be done inside plingth area
Setting up main door frame and other room door frames
Wall construction until window frame base (Approximately around 3 feet)
Setup all window frames based on its sizes until 7 feet from the flooring
Setup lintel and saja
Wall construction until beams
Setup kitchen ventilators for exhaust fans OR bathroom ventilators if needed
Sheet centring for beams and also roof
o Fix sheets based on water level
o Apply plaster for the gaps between sheets
o Apply oil for sheets
Bar bending work for beams and roof
o Inverter beams
Electric pipes setup inside roof
Molding
Storing water on top of the roof
After 18 days remove sheet centring
Hocking for the roof
Electric pipes
o Clear any blockage in the roof pipes
o Laying electric pipes in the walls and setup electric boxes
Plumbing work for kitchen and bathroom
o Setup water pipes and sewage pipes till outside of the wall
o Setup Indian latrine if you are going with this option
o Water proofing for bathrooms
o Close all water and sewage pipes with temporary caps
Setup kitchen platform and sink
Tiles laying in bathroom and kitchen for walls
Plastering of roof and walls inside
Plastering of outside walls
Applying putty for window frames
Fixing window frames
Granite Lying
Granite tiles Laying in bathroom if you are going with this option
Fixing bathroom fittings
Finishing outside plumbing work and tank
House Elevation
Painting
Electric work
o Electrical wiring
o Dummy plate fixing/ electrical holders
o Electrical switches setup
Apply paint coating outside
Laying electric service wire from pole to meter board
Fixing meters in panel board.
Digging pit for power earth
Digging pit
Motor & connection to tank
Sewage lines to pit
Parking tiles
Compound wall
Bore
Before Planning to put bore observe surrounding sites/area bore well points
1. Gather information on successful and failure bore well points near your site
2. If successful how much water neighbor got, How much depth each bore well went
3. For each bore well point how much depth casing they used.
All above point will help you in analyzing your decision on Bore well digging and cost
Ask vendors to bring High speed hydraulic Rigs to your site. So that work will be faster with less
manual effort
Usually 6.5 inch diameter bore well drill bit will be used for all domestic purposes
Before start of bore well digging, it is better to inform all your neighbors. So that they will be
prepared to get out of dust and noise
In Bangalore Maratha halli area, people used MS pipes for casing. 10 PVC casing will come
outside of the MS casing pipe. Check with your vendor and engineer whether there is a need to
put PVC casing or not.
Borewell Vendors
You can contact classifieds, classifieds websites and surrounding areas to get list of bore well
vendors, if you dont know already.
Once you collect all vendors and their contact numbers get quotation from every one.
Once you get quotation from each and every one put all the quotations in one excel sheet.
compare their prices based on the depth you are planning to go.
I personally fell this will be the easy way to select vendor based on his quotation.
Here I prepared one excel sheet for this purpose. you can download this excel and make use of
it. Use the attached excel file this may save 15 min of your time . Please note I removed all
the vendor names in excel sheet.
These charges may differ time to time.I heard vendors will charge more in summer because of
season
Few bore well diggers will give same rate until 1 300 feet and few vendors will give 1 250
feet. So see the overall total cost for decision making not only initial price
I removed vendor names from excel. Click on the below links . please let me know if this is not
accessible.
As of now (June 2012) In Bangalore all vendors will come and visit your site and see access for
the site to get Bore well lorry. They will not charge any thing for this.
Temporary Shed
Temporary shed construction will be the first step before you bring your material near
your site.
You need to construct temporary Shed to keep your construction material and your watch
men will stay there to look after your site and material
You need to construct this in your neighbors site with their permission. So have a plan to
contact them early
Since it is temporary, you can consider using soil instead of cement.
Site Marking
Site marking is one of the starting point of your construction.
In this activity your Engineer and Meastri will identify pillar placements.
Once pillars placement is identified based on soil condition earth work will start.
Engineer will mark the area around the piller. Earth workers will dig marked area
Depending on soil condition pillar depth will vary.
Some people perform puja before starting this marking.
Pillar plan This plan you will receive from Engineer. This will tell you about distance
between pillar to pillar.
Empty Site:
Required meterial on marking day from owner(These may change subject to situation )
Threads this is used to tie rods
Paint and brush 100 ML paint to mark walls
chalk powder This is used to mark digging area
Steel rods used to tie threads usually around 2-3 feel long
Photos
Empty site:
Sump will be the one which will be constructed first. By the time you construct sump, you
should have and idea how may houses you are going to construct in site
sump size should be directly proportional to the number of houses you are constructing in site
and water availability
If there is only one house then 6000 liters to 8000 liters sump is sufficient.
if you are constructing rented houses then maintain more storage space for sump (~12000 ltrs of
water).
Having bigger tank is useful when there is a water scarecity.
Sump Photos:
If you observe below photo for the walls rough plastering was done.
This rough plastering was done after metal mesh was tied to the wall.
Download this photo and look at the wall edges you can observe iron mesh.
After plastering:
Now a days few persons are using steps (see below picture) instead of rock. I am not sure of the
disadvantage of this.
Please share your ideas to my mail id. i will include them in this website. So that it will be useful
for others
How to find Sump/Tank capacity OR How many liters can be stored in your tank/sump?
1. To find out your sump capacity first you need to have length, width and depth of your
sump/tank in feet
2. Multiply length, width and depth of your sump to find out cubic area of your tank/sump.
3. 1 feet cube area(1 length * 1 width * 1 height) will store upto 28 ltrs of water.
4. So multiply your sump cubic area with 28 and you will get your sump/tank water storage
capacity in liters
5. Above formula will work only if your tank shape is in rectangle or square.
6. If at all there are different shapes then find out total area in cubic feet and multiply with
28 which will result number of liters
Water pressure will be more on the edges of the tank. So avoid constructing sump/tank
corners with 90 degrees like room walls.
When you are constructing sump, have edges in a curved shape. so that water pressure
will be diverted to a larger area. This will have some significant effect in the long run.
While constructing sump, Manson will use iron mesh during plastering to avoid cracks.
Sump and tank plastering should be completed at one stretch to avoid cracks.
Do not use low quality brick for sumps and tanks.
Keep sump door always towards street side. so that tankers can pour water easily
Keep 3 pipe connection to the sump from outside. So that water tankers can directly
pour water from outside
You need to dig soil until you find hard soil it all depends on your area soil condition
observe your surrounding buildings, how much depth they went, that will give you an
approximate idea
Please be aware that if your area/Layout is formed in lakes or down side areas. your
layout owner might have filled all the land with new soil, in those areas you may need to
go deep for footings
Pillar Footings
In below Photograph this pillar is ready for footings.
While pouring cement mixture, cement mix will not go waste because of gaps in between
sheets
No need of hocking at the time of centering removal.
Points to consider:
Spray water before pouring concrete on these mats so that gaps will get reduced.
These mats are made up with Jammu it will get expanded little bit if you pour water on
it
Remove these mats immediately after centering sheets are removed. it will be easier to
remove when it is wet.
other wise you need to spray water and remove them which will be an extra work
Inverted beams:
Usually Inverter beams will come if you are going to construct a wall where there is no
beam.
So for example during ground floor molding time you should have first floor plan
ready.
Hooks in the roof:
Hooks in the roof will be helpful to hang caddles in hall and bedroom.
This will be useful for the families who has infants/children.
<attach photo here>
After molding no one should hold pillar rods. If some holds pillar rod and leaves, it
will create few small vibations and these vibrations will leave small gaps in pillars.
vibrator
Sufficient Meterial:
Owner has to make sure he has sufficient sand, jelly and cement for Molding
For 30*40 Site (Molding area will be around 1000 sft excluding beams)
bring 100 bags of cement, ~ 700 cft of sand, ~700 cft of 20 mm gravel (20 MM jelly).
covering stones:
Covering stones are the most important thing which you need to remember with out
fail
Covering stone is a flat thin piece of a stone. These stones will be kept below steel rods
to avoid contact between sheet centering and steel rod
These stone will keep some gap between molding sheet and steel rod. So that concrete
will go in between
Before Molding II
Filling the gaps between wall and side centering sheet:
This method will have more impact, In case if you are constructing walls along with
pillars
Small gaps will be left unattended once centering people completes their work
Since these gaps are not covered, while pouring concrete all the cement mixture will
come out
<Attach a picture>
To avoid this leackage during molding time , apply cement for the gaps, before starting
barbending work
Refer below picture, you can observe cement was applied for beam edges. Before
applying cement, gaps were there
<Attach photo here>
So most of the leackage issues will get solved
This is better way rather than filling these gaps under cealing on molding day. With less
work you can increase the quality of the cement mixture.
Hocking
Hocking
Hocking means doing small small hits for concrete pillers/roof, so that piller or roof surface will
become rough.
If surface is rough with little up and downs, cement will get attached to concrete surface.
While doing hocking for concrete surface meastri has to hit a concrete roof/pillar for
every 1.5/2 inches.
Perform this activity immediately after removing sheet centaring/pillar boxes. At this time
concrete will be wet and soft. Other wise after few days concrete will become hard and workers
need to put more effort to perform this activity.
Bathroom Fittings
Bathroom fitting are one among the costly items in house
House Elevation #5
Paintings
Materials
Brick
For most of the buildings two types of Bricks will be used.
Red brick
Hallow cement brick
Red brick:
Usually red brick size will be 9 * 4 * 3
In Soil bricks itself there are various types of bricks. Process will be different to make these
bricks
Before constructing wall, ask mason to spill water on bricks. You will come to know if there are
any bricks which not properly heated. with this processyou can easily remove them
Sample Photos:
Wire cut brick:
Bricks rear view:
With Hallow and solid cement bricks, you can complete wall construction faster than normal red
bricks.
if you are taking cement bricks make sure vendor did proper curing for these bricks. Then only
strength will be there.
Fly ash bricks:
Few people are using Fly ash bricks are also. these bricks are lighter weight.
Solid bricks:
Steel
We observed following weights while purchasing steel. These may vary from your observation.
You can keep this for your reference.
Door Beadings
Door beadings are used to hide gaps between wall and door/window frame
These beadings are available in different sizes. sizes will start from 0.75 inch
Puja Room Door beading:
Bulk Material Purchase
Purchase material in bulk if you have storage place and safety
In Bangalore K R Market is the right place to get bulk material.
There will be many shops and all will be at one place. You will get very competitive price over
here
Most of the vendors in Bangalore will get items from Market and sell in thir own shops.
You can get following items from market
Electric material- wires, switches, switch boxes, copper plates, copper wire etc
Submersible motors, monolithic motors, pump etc
Plumbing material pipes, fittings, water tanks,
Kitchen items, bathroom fittings
Carpenter material hinges, aldrops, locks, door handles
Cast iron pieces
If you purchase cement more than 50 bags you will get 10 rupees discount from the normal price
Electric Switches
In all the bedrooms dont forget to have two way connection for light and fan. This two
way switches will be very useful.
In staircase also you can plan to have two way switch. while you are going up you can
switch on light and once you reached next floor you can switch off the light. It will be
very convinient.
Have a light in staircase.
Wood Selection
When do you need to purchase wood? or When will be correct time to purchase wood?
People will construct house in two diffrent ways.
First method people will finish all molding work then they will construct
walls.
Second method Along with pillars people will construct walls. once wall
construction is done they will go for roof work.
Seasoning:
Teak wood:
Teak wood one of the costly and good wood. Usually people use this wood for Main door
and Puja door
weighs is less sttength is more
Neam wood:
less costly, strong wood, if not seasoned properly it will give cracks and bends.
Personal openion: For my house we used Neam wood for window frames and door frames. Here
and there, there are few issues but if i see from economic perspective i got benefited
For Main door frame take 5*3 (5 inch * 3 inch) size wood
For all other bedroom and bath room doors 4 * 3 size wood is sufficient. You can go
for larger size also if you can offered
Window shutters :
While selecting glass, select the design which will be available in future also. So that if
any window glass breaks down then you can replace.
If your house is beside a busy road, use reflective/Design glass which can protect your
privacy.
Curton Rod:
You can place base for curton rods befor fixing. so that it will be nice to see
Sand
What Type of sand every one should use
Role of sand:
Sand will play a key role in construction. If you use good sand, construction quality will get
increased and buildings will last longer.
Even though good sand price will be always high, better to use good sand rather than filter sand.
Based on work try to bring sand of different types. For molding you can bring rough sand and for
plastering you can bring nice sand so that you can avoid wastage.
While bringing sand make sure it is free of dust and clay balls.
How to find out whether it is good sand or not
Sand wont be sticky when you take it into your hand
Filter sand:
Filter sand can be made by washing the soil with water. once it is washed all the dust particles
will go off and finally filter sand you will get.
Few vendors will mix filter sand in good sand and sell. So have a contact with good reliable
vendor.
Filter sand will be available for cheaper rate.
Ex: Good sand is available in kolegallu. this sand is famous in Bangalore for good quality.
Price:
When we are constructing latest house we paid Rs 12000 for ~300-330 cubic feets(November
2009). Price of the sand will vary from time to time. At the time of lorry strike prices will be
very high and you may not get sand even if you want to pay more. so be cautious. Reserve one or
two loads of sand always.
Have a vendor who will supply good sand.
Picture of good sand:
Rough Sand photos:
Nice sand Photos
Good Sand preferably used for plastering:
Watch below video to know more about sand which is suitable for plastering
Granite Selection
Granite will be available in different sizes
Gangsow
These are big slabs. height will > ~ 5 and length will > ~ 7
Thickness: 20 MM to 40MM
Slabs:
Tiles:
Granite selection:
Points to Note:
In some of the granite types iron content will be more. avoid taking them
Before taking granite check whether it has any cracks. If cracks are there then vendor will
not consider that portion in his measurement
Since it is a natural stone you may not find similar pattern tomorrow. It differs from stone
to stone. So when ever you are taking granite take every thing from one lot
Dont purchase granite tiles which are unsized, these will take more effort of layer and
more cutting cost
There are tiles with rough finish. vendors will get this roughness through flamming
Flamed tiles are widely used in bath rooms and out side of the house or in passages
Granite gangsows will come in different finishings like mat finish which will avoid
skidding
Electric Boxes
There are two different types of electric boxes are there available in market
1. Metal boxes
2. Wood boxes
If you are going to keep Roma company switches then you need to go for metal boxes otherwise
wood box is sufficient.
Wood box after fixing in wall:
Normal switches
Roma switches
<attach a photo here>
Normal switches will cost you less. There will be huge savings if you are going by normal
switches.
Based on your finance position you can opt any one.
When you are going for metal boxes there are few local companies metal boxes are also
available . use local companies metal boxes so that you can save money. I observed both local
and Roma metal boxes. definitely there is some quality difference but spending double amount
for the quality is not required. More over metal box will be inside the wall. after finishing you
may not see anything. you can fix roma switches for local companies metal boxes.
<take a photo of the normal metal box>
<take a photo of the Roma metal box>
Electric wires:
During wiring you need to bring differnt colors of electric wirs so that it will easy during
maintainence time
Waterproofing
It is better to do waterproofing for bathroom to avoid leakages. For our house this time we asked
one person to do water proofing.
35.
36. After applying the primer
37.
38. Painters are painting first quote of outside painting
39.
40. Painters are doing sanding inside the building
41.
42.
43. Room after sanding is done
44.
45. protecting the electric switches with taps before painting process
46.
Granite Laying
One of the important phase in your house construction.
Nosing means making granite edge in a curved shape. Usually 20MM(Milli Meter)
granite will be used for Nosing
Types of nosing :
o Half round
o Full round
Granite nosing will cost more. but look wise it be very good.
While selecting Granite layer look for the joints in between tiles and slabs; These gaps should be
less.
Granite border cost will go based on running feet. Price varies based on thickness.
Granite Border:
Granite Skirting: When ever mason is applying a cement for skirting ask him to apply cement
slantly. so that dust will not get accumulated on skirting. In The below picture there are more
chances of accumulating more dust.
Granite skirting is completed and plastering need to be done
Search HCT
To search, typ
Disclaimer
Information shared in this Site is based on our own experience.Please think from your context
and your circumstances. This site will give you only basic information. We do our best to correct
any errors and welcome your feedback!
Recent Pages
Advertisement
BathRoom
Placing corner plates to keep things:
You can place corner plates to keep items in the bthroom. These are granite plates
Use contrast colours for these plates, then it will look good.
Have atleast 2 corner plates per bathroom.
Based on your convinience you can place these corner plates
soap box:
Soap boxes will be available in the market . These are available in diffrent colours, based
on your tiles colour select matching colour of soap box and insert in the wall. This will
avoid fixing another place holder for soap box
The one which we used in our home costs around Rs 80.
Power connections:
if you are providing any sockets in bathroom keep them above 5 feet. So that water will
not get spilled on those and that will avoid electric shock risk.
Waterproofing:
Do water proofing for evry bathroom. This will keep roof safe from leakage. Contact
your plumber to do waterproofing. you can go through waterproofing page to know more
details about this process
Dont keep your letrine height more than 6. If it is more than 6 it wont be convinient to
elder people.
In your home if there are old people, it is better to go with western toilet. Otherwise you
can go for Indian type latrine
Bathroom Fittings:
Bathroom Door:
o Bathroom door bottem should end below the bathroom step. so that there wont be
any gap between bathroom door and step. This will avaoid spilling the water
outside
o <attach a photo here>
If you are using normal wood rather tahn plastick door for bathroom, you can fix plastick
sheet for door so that wood will not get spoiled
<attach photo here>
Bathroom step:
Keep your bathroom step hight nearly 6-7. so that it will be easier for old age people
also.
From bathroom flooring step should have atleat 40-50mm height so that when you pour
more water it will not come out side. In below picture two 20mm granite stones are
joined with metal paste.
Corner sink:
In case if your bathroom doesnt have much space think about keeping this corner wash basin.
Bathroom window:
<pending>
Sunken slabs in bathrooms:
Using Sunken slabs in bathrooms is not an disadvantage. You can go ahead with that.
Just remember to perform water proofing for bath rooms.
With this kind of sunken slab construction you can reduce the height of the bathroom. so that it
will be easy for old-age people.
In case if you are constructing a bathroom on normal roof, after waterproofing it will become 7-8
inch height With Sunken slabs you can easily avoid this situation.
Cupboards
Different ways of constructing cupboard:
There are different ways of cupboard construction. below I have explained pros and cons of
the both cupboards. go through this choose your option.
Cost effective Usually cupboard will be of length 7 feet. Since bricks will cost less
than wood, this method will be cost-effective.
Less work If you are constructing with brick Meastri will construct this. There wont be
any extra charge for this from his side.
Occupies more space and bulky Since you will be using bricks at least it will come to
4. You can construct by using half brick even though after plastering it will come to 3.
Second option will be good but it will take some more time of Meastri. Meastri has to
construct cupboard in two stretches.
Can use kadapa stone inside When you are constructing with brick you can use kadapa
stone. so that you can save more money.Take thin kadapa stone for this. select the ones
which are of 3/4 inch thick
Occupies less space If you are using wood material you need to use plywood
sheets for this. Usually this will be 3/4 or 1 thick. It will not occupies your room space.
More cost- Since plywood cost Rs 40- Rs 60 so your material cost will go up and
carpenter will charge will extra for this option.
More work- Most of the work will get completed after plastering
Place can be changed If you make box type cubboard you can move it to one place
to another place. These will be best suited to small rooms.
Below picture shows cupboard constructed with mesh and cement. Bolts will be left outside to
fix wood doors. Look wise it will be nice and it is strong also.
Design 1:
Design 2:
Cupboard designs:
cupboard Inside design
cupboard Inside design
Avoid making food inside new house when plastring is not over to roof, because this will
cause smoke to get accumulated to the roof. If plastering was done with out cleaning
smoke properly, after few days plasering cement layer will get detached from roof. Then
plastering layer will give cracks and roof plastring will fall down.
Measris has to complete window edges and wall edges at a time. If they complete
plasering in different time frames it will give cracks for plastering
Before starting plastering work mason will build a pedestal with wood sticks.
Close water lines before plastering. So that cement will not go inside the pipes
Manos are removing the sticks and closing the holes in wall
safety:
1 Steel
Tata
Indus
Sunvik
Maha lakshmi
2 Cement
Ultratech
ACC
Coromandel king
Birla Super
Birla sakthi
Bharathi
3 Electric wires
Anchor
Legrand
V Guard
Finolex
Havels
4 Motor
Mahendra
V Guard
Crompton and
Greaves
5 Fans Usha
Crompton and
Greaves
6 Lighting equipment
Philips
Pasolite
Crompton and
Greaves
Wipro
7.5 Geysers
V Guard
Crompton and
Greaves
8 Vertified Tiles
SoMany
9 Water mixer
Jaquar
ESS ESS
10 Water taps
Jaquar
Ess Ess
11 Sanitary fittings
Viking
12 Camodes
Cera
Hindware
parryware
CPVC Plumbing
13
meterial
Astral
Ashirvad
14 Inverter
Amaron
15 Glass
Saint Gobian
AFTER CONSTRUCTION
Plumbing Work
Check whether plumber is using washers while joining pipes.
Latrine pipes on wall should have a slope of 2 because waste should go along with
water. If slope is more water will go fast and waste will stay in pipes.
While pumping water from sump to tank use long bends or 45 degree bends instead of 90
degree bend. So that water will flow with less resistance.
In case if you use 90 degree bend force reduction will be more.
while purchasing motor, see Motor has big impeller or not. The bigger impeller will push
more water with more force.
setup a 3 pipe connection to sump towards street so that instead of opening sump door
you can empty tanker.
Observe plumbers are keeping proper slope for the water traps.
Plumbing pipes:
75 mm pipe 4 KG gauge
110 mm pipe 4 KG gauge
Water Tank
Plastic tanks:
In case if you are constructing tank put two or three layers of concrete while constructing sump
that will avoid cracks. In below picture they kept three concrete layers.
Recently for our house we went with Granite cladding. Following is the process granite layer
followed to fix the granite tiles to the wall
For cladding we went with 1 feet * 2 feet tiles which is 10 mm size. people will go with 20 mm
size slabs which are bigger in size.
Before cladding process begins, We need to get marble chips and Araldite
This time we went with small stones which are available in rock dust. We separated small
stones from dust and kept aside.
Get Araldite from hardware shop. Araldite is a Epoxy adhesive, for that you need to
add hardener.
Before start of the cladding process, you need to mix both of the liquids, apply the mixed
adhesive on back side of the granite tile and place chips. Leave this tile at least a day for drying.
After this this is ready for use.
Reason behind for this process:
Granite tile back surface will be smooth. By this process we are providing the grip for the back
side. When ever you apply cement on back side it will hold granite tile strongly. So that cladding
will not come outside even after years.
There are companies available who will come and install these water level controller sets in your
house for your sump and over head tank. Basically it will work with a device.
First, they will identify a suitable place to keep this machine. Ideally all the people will keep this
machine near motor switch.
Recently we installed water level controller instrument for our house 1st Dec 2013.
During setup process, from sump one cable will be pulled until motor switch point
From upper tank also one more cable will be pulled until motor switch.
Both of the wires will be joined in the instrument and motor wire also will get connected to this
instrument.
With in Tank and sump there will be aluminum pieces which will be there for sensing the water
level
Once water level is low in upper tank automatic water level controller will automatically switch
on the motor. Once Sump water is low, then system will switch off motor
If you want to operate manually you can do that thorough this machine
Precautions which you need to take: Provide an electric pipe from motor switch to sump to
take cable wire
Provide a pipe till sump so that you need not take this cable wire out side.
If cable is outside then there is a good chance that it will get damaged.
Price: When I purchased it is 2750 rupees. This includes the system, wire and installation and
labour.
Advantages:
No need to switch on motor daily. This will save your time and daily monitoring
Water overflow will be avoided from over head Tank
With respect to sump, dry run will get avoided
In case if you dont want automatic pumping option you can always set the manual
operation option and it will work as normal switch
AC fitting Tips
Fix AC either on right side wall or left side wall to the bed.
It is not advisable to keep Air conditioner indoor unit either on head side wall or opposite
side wall
AC Indoor unit installed to the nearest drain point this will avoid any kind of blockage
Proper slope need to be maintained for the drain pipe. so that waste Water will go out
easily
In case if you are not able to set up proper slope for the drain pipe consider AC units with
drain pump
http://houseconstructiontips.com
What Standards People Should Look for
Before Buying Steel from Companies
When you need to purchase steel for a construction project big or small, or some other reason,
there are certain things you need to know before you set about doing your buying even if it is
from a reputable company like Metro Steel. Here are some suggestions to help you get through:
Your typical steel manufacturer will stock a huge variety of items from aluminum, alloy, brass,
bronze, copper, cold roll, hot roll, Stainless and Tool Steels. They should custom cut the steel to
whatever length you need free of charge, and there should be no minimums.
Your chosen steel manufacturer like Metro Steel should be able to give excellent shipping
service to all of its customers. This generally means that your order should ship in 1 to 3
business days. It should arrive promptly and undamaged. If there should be a back-order
problem, the manufacturer should contact you by phone, email or at least indicate the problem on
your packing slip.
The steel manufacturer you select should have the latest, most modern, sawing, shearing and
cutting equipment available. Their typical cutting tolerance should be: (Plus 1/8 Minus 000).
Ferrous and non-ferrous gauges or steel and brass gauges are not all the same thickness. If you
dont know what thickness to order than there should be a Sheet Gage link located on each
applicable sheet product pages on their website that you can refer to.
Pricing
The steel manufacturer you end up working with should be able to match your current vendors
pricing or even do better.
You should be familiar with some of the terms concerning steel before you attempt to hire a steel
manufacturer even one as well-known as the Metro Steel suppliers. Galvanized sheet steel is
one term you should know the meaning of. Galvanized sheets have many different uses and
applications, such as automobile parts including both interior and exterior parts, roofing,
appliance parts, heating and ventilating ducts, culverts, microwaves, vending machines, the list is
endless.
Stainless Steel
This is the universal name for many different steels used mainly because of the anti-corrosive
element they possess. Stainless steel was developed to be able to withstand a number of
corrosive environments. Its use assures us that our workplaces are safe, that buildings last longer
and that our food preparation surfaces are hygienic. Another good thing about stainless steel is
that it is an earth friendly material which can be melted down, recycled and made into something
else.
Mild Steel
This is the steel used the most often and it is also the least expensive steel. You can find it in
practically every product you can think of that is made from steel. It is available at all
manufacturers including Metro Steel suppliers. It is wieldable, very hard, and even thought it
will rust easily, it is also very durable. This type of steel can be used in nearly every project that
needs a large amount of metal.
Now buying steel for a building project can be difficult and stressful because you want to be
absolutely certain that you buy exactly the type of steel you need. These are just a few tips on
what you should know before you venture out to make your purchase. If you are truly a novice,
however, you could benefit from consulting someone in the business to make sure you know
what you are doing, or even hiring someone in the business to ensure that you end up with the
correct supplies.
Biography:
Jake Hyet is considered an expert concerning steel. He has worked for ten years for Metro Steel
Brisbane, and learned much from Metro Steel suppliers. He has written extensively about the
steel industry.
Granite:
Marble:
Soft rock
You need to lay the Marbles then polishing process will start. Initial laying process is more than
granite and tiles
Advantage is if you feel flooring lost its shining then you can do polishing one more time so that
you will get the first look. This will be one advantage in case if you are going for a marble
Generally cost wise it will be little lesser than granite but laying cost may vary.
very fewer chances are there to break and for scratches but because of the soft nature, when
compared to granite it is prone to scratches.
If patterns are available in Marble, Marble Layer can create very nice patterns out of it
Vitrified Tiles:
Environmental factors:
Climate will not be a main consideration if you prefer any one of the floor type but keep this in
mind that this also plays an important role
Marble will give you coldness. if you are in Hyderabad then it will be better to opt for a marble
because temperatures are high in Hyderabad when compared to Bangalore
If you are in Bangalore then you can opt for Granite because of cold weather nature.
Conclusion:
It is purely on the personal choice, but you can conclude your decision based on following
factors. List down your priorities based on below points and give percentage/marks to each point.
Then you should be able to come to a conclusion.
If we have not included any other points please let me know through contact us form. We will
include those points here.
There are a lot of granite names. Sometimes you will get confused with these names. So initially
you note down the names on the back side of the visiting card which you collect from each shop.
preferably you can take a photograph of that so that you can identify the color easily. You will
hear some of the names like Indian Jubran, Raw silk, Tomato Red, Cat eye, Black Galaxy,
Hassan gray, Velvet pink, Amba white etc.
Even though, granite name is same you will see a lot of variation in grains, patterns.
Now a days sellers/manufacturers are applying various colors while applying epoxy. These
colors will hide the natural color of the stone. Generally this kind of colors will be applied to the
low-quality material, or to increase the price. These colors will fade out after few years and you
will see the original color of the stone after few years. In recent days, I do observe this kind of
color variations in Jigini, Bangalore. It is advisable to take a transparent epoxy coating rather
than more dark colored epoxy coating
it is difficult to make out whether it is a transparent color epoxy or not. You can solve this by
following two ways
Easiest thing is to pour water on the back side of the slab. So that you will see the original color.
Slab back side you can always see the natural color of the stone.
Another method is, observe the color on 20 mm thickness side, you will see the epoxy colors.
You can identify whether it is a transparent color or not. Based on this you can guess whether it
is thick color or not.
Buy granite for the entire house at once if you are going for pattern type of granite. You will not
get the same color or variety once again. But if needed, you can match the similar patterns but
this is very subjective to the color you have chosen
If you are laying the granite in multiple houses then you can accommodate/face this situation but
transportation will be an additional cost for you.
Even patterns in the same granite slab will cost much then the uneven pattern.
Kerosene cutting:
kerosene cutting slabs will not be good. kerosene cutting slabs will loose its shining fast. You
can identify the kerosene cut slabs by smell. Once you open the slabs in the lot, Then you can
feel the smell if slabs were cut by the kerosene. All gangsow slabs will not come with kerosine
cutting.
Water cutting:
Water cutting slabs are preferred one than kerosene cut slabs
Granite Cracks:
If you find any cracks in the material then Seller will exclude the granite slab until the cracks
portion. After excluding the defective portion of the slab, measurement will be taken. Granite
layer will reuse this additional granite. So that you can save some amount
Iron content in stone:
In light colors granite varieties, in some places you will see dark iron color spots. For example,
you can see this iron spots in Amba white granite variety. After few years, iron content will
spread over the iron spot and slightly change the color around that spot
Various factories are available in Jigini surrounding area. Usually, factories will deal with few
varieties of the granite Go and roam to identify the granites. enquire you will get the better price
and good material
Buying from factory directly will save you some money because loading and unloading charges
are not there from seller
1. Based on your own preference. This will take the precedence over all the factors
2. Based the ventilation you can choose the color. On low light conditions in the house, you can
preferably go with light colors and vice versa
3. Black colors granite will be harder when compared with light color granite and light color will be
soft when compared to black color ones.
In this method, contactor will bring all the materials for your building construction and
also contractor will manage all the daily labors work also. You need to have an agreement with
him. He will monitor your building work on behalf of you.
Pros:
Contactor will be one point of contact for your you. You no need to hire/negotiate with any
workers and with shops to get material
Cons:
You will not have a chance to choose any workers and all of them will be managed by contractor
There is a good chance of using second quality material for construction where ever is possible.
This is one of the area all the owners will have major concern with this method. To mitigate this
problem one need to have proper quotation from contractor for each item.
Since it is not his work contractor may not concentrate more on this work. He may do the work
with usual attention not with at most care
In this method, you need to bring all the materials for your building construction. Mason will
manage only labor. Owner has to supply all the required materials based on the need.
Pros:
Important point, you will be exposed to various people; you will closely observe different
mentalities of people. This experience will give courage to face any other circumstance in your
life.
Cons:
For a period of construction time you will be occupied completely. You will be the point of
contact for all the activities.
You need to act like a coordinator for all the workers like Mason, centering workers, bar bending
workers, plumber, electrician, painter etc.
How to choose
Apart from all these things, this question can be answered based on below major points
your availability
Your basic knowledge in construction
will there be any person who can take care in your obscene during working day(this
point is kept based on working people)
Quality of Meastris (for all the works) in terms of responsibility/accountability/ideas
based on situation/experience
Cement Price List
Dalmia Cement Price List
GRADE PPC(Rs) OPC53(Rs)
Hdpe-Poly Pack 380.00 -
Paper Pack 390.00 -
Sagar Cement Price List
GRADE PPC(Rs) OPC53(Rs)
Hdpe-Poly Pack 330.00 345.00
Paper Pack 340.00 -
Coromandel Cement Price List
Hdpe-Poly Pack 380.00 395.00
Paper Pack 390.00 -