Name of work: Periodical maintenance of Topsel Toyota showroom cum office and service centre 522/524, Budge Budge

Trunk Road,
Maheshtala, Kolkata, West Bengal 700141

Sl No Location Description of work UOM Qnty


1 Technician- Rest Providing and applying 2 coats of synthetic enamel paint Sqm 108
room (Berger make) over a coat of cement/metal primer as required
including surface preparation, scaffolding complete.

Providing and applying cement sand plaster (1:5) to walls , Sqm 8.55
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.

2 Closed pantry Providing and applying 2 coats of synthetic enamel paint Sqm 38
(Berger make) over a coat of cement/metal primer as required
including surface preparation, scaffolding complete.

3 Beside Closed Providing and applying 2 coats of synthetic enamel paint Sqm 48
Pantry Store (Berger make) over a coat of cement/metal primer as required
including surface preparation, scaffolding complete.

Providing and applying cement sand plaster (1:5) to walls , Sqm 37.5
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.

4 Technician toilet Providing and applying 2 coats of Lime wash to walls, ceiling Sqm 72.5
and dressing area etc. as per the instruction including surface preparation,
scaffolding complete in all respect.

5 Staff quarter
terrace room
6 1st floor staff
quarter
Providing and applying 2 coats of Lime wash to walls, ceiling
7 Toilet etc. as per the instruction including surface preparation, Sqm 920
a Store scaffolding complete in all respect.
b Kitchen
c Room
d Stair
8 Generator room Providing and applying 2 coats of Lime wash to walls, ceiling Sqm 58.2
etc. as per the instruction including surface preparation,
scaffolding complete in all respect.
Providing and applying cement sand plaster (1:5) to walls , Sqm 26.7
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.

9 Exterior part of Providing and applying 2 coats of Weather coat paint (Berger Sqm 306
staff quarter make) over a coat of exterior grade primer to walls as per the
instruction of the authority including surface preparation,
scaffolding etc. complete in all respect.

10 Chila Cota Providing and applying 2 coats of Weather coat paint (Berger Sqm 102.2
(Mumty room) make) over a coat of exterior grade primer to walls as per the
instruction of the authority including surface preparation,
scaffolding etc. complete in all respect.

11 Workshop interior Providing and applying 2 coats of synthetic enamel paint Sqm 1000
(Berger make) over a coat of cement primer to walls as per the
direction including surface preparation, scaffolding etc.
complete in all respect.

Workshop interior Providing and applying cement sand plaster (1:5) to walls , Sqm 80
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.

Workshop interior Providing and applying 2 coats of synthetic enamel paint Sqm 858
(Berger make) over a coat of metal primer to the steel
structures as per the instruction including surface preparation,
scaffolding etc. complete in all respect.

12 Compressor room Providing and applying 2 coats of synthetic enamel paint Sqm 76.8
(Berger make) over a coat of cement/metal primer to walls as
per the direction including surface preparation, scaffolding etc.
complete in all respect.

13 Workshop exterior Providing and applying 2 coats of Weather coat paint (Berger Sqm 880
make) over a coat of exterior grade primer to walls as per the
instruction of the authority including surface preparation,
scaffolding etc. complete in all respect.

14 Corridor near Providing and applying 2 coats of Plastic emulsion paint Sqm 64.4
store (Berger make) over a coat of cement primer to the walls, ceiling
etc. as directed by the authority including surface preparation,
scaffolding etc. complete in all respect.
15 Store manager Providing and applying 2 coats of Plastic emulsion paint Sqm 43.4
room (Berger make) over a coat of cement primer to the walls, ceiling
etc. as directed by the authority including surface preparation,
scaffolding etc. complete in all respect.

Provding and fixing Gypsum false ceiling including taking out Sqm 10
the existing false ceiling complet in all respect.
16 GM Customer Providing and applying 2 coats of Plastic emulsion paint Sqm 337
room (Berger make) over a coat of cement primer to the walls, ceiling
etc. as directed by the authority including surface preparation,
scaffolding etc. complete in all respect.

17 Service area Providing and applying 2 coats of synthetic enamel paint/Plastic Sqm 368
emulsion paint (Berger make) over a coat of cement/metal
primer as required including surface preparation, scaffolding
complete in all respect

18 Boundary wall Providing and applying 2 coats of Weather coat (Berger make) Sqm 306.6
over a coat of cement primer as required including surface
preparation, scaffolding complete in all respect

19 Rest room office Providing and applying 2 coats of synthetic enamel paint/Plastic Sqm 120
emulsion paint (Berger make) over a coat of cement/metal
primer as required including surface preparation, scaffolding
complete in all respect

Providing and applying cement sand plaster (1:5) to walls , Sqm 30


ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.
24, Budge Budge Trunk Road,

Rate Amount
130 14040

275 2351.25

130 4940

130 6240

275 10312.5

45 3262.5

45 41400
45 2619
275 7342.5

130 39780

130 13286

130 130000

275 22000

130 111540

130 9984

130 114400

130 8372
130 5642

1300 13000

130 43810

130 47840

130 39858

130 15600

275 8250

715869.75
Name of work: Periodical maintenance of Topsel Toyota showroom cum office and service centre 522/524, Budge Budge Trunk Road,
Maheshtala, Kolkata, West Bengal 700141

Sl No Location Description of work UOM Qnty


1 Technician- Rest Providing and applying 2 coats of synthetic enamel paint Sqm 105
room (Berger make) over a coat of cement/metal primer as required
including surface preparation, scaffolding complete.

Providing and applying cement sand plaster (1:5) to walls , Sqm 8.55
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.

2 Closed pantry Providing and applying 2 coats of synthetic enamel paint Sqm 35
(Berger make) over a coat of cement/metal primer as required
including surface preparation, scaffolding complete.

3 Beside Closed Providing and applying 2 coats of synthetic enamel paint Sqm 44
Pantry Store (Berger make) over a coat of cement/metal primer as required
including surface preparation, scaffolding complete.

Providing and applying cement sand plaster (1:5) to walls , Sqm 37.5
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.

4 Technician toilet Providing and applying 2 coats of Lime wash to walls, ceiling Sqm 65
and dressing area etc. as per the instruction including surface preparation,
scaffolding complete in all respect.

5 Staff quarter
terrace room
6 1st floor staff
quarter
Providing and applying 2 coats of Lime wash to walls, ceiling
7 Toilet etc. as per the instruction including surface preparation, Sqm 900
a Store scaffolding complete in all respect.
b Kitchen
c Room
d Stair
8 Generator room Providing and applying 2 coats of Lime wash to walls, ceiling Sqm 58.2
etc. as per the instruction including surface preparation,
scaffolding complete in all respect.

Providing and applying cement sand plaster (1:5) to walls , Sqm 26.7
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.

9 Exterior part of Providing and applying 2 coats of Weather coat paint (Berger Sqm 306
staff quarter make) over a coat of exterior grade primer to walls as per the
instruction of the authority including surface preparation,
scaffolding etc. complete in all respect.

10 Chila Cota Providing and applying 2 coats of Weather coat paint (Berger Sqm 102.2
(Mumty room) make) over a coat of exterior grade primer to walls as per the
instruction of the authority including surface preparation,
scaffolding etc. complete in all respect.

11 Workshop interior Providing and applying 2 coats of synthetic enamel paint Sqm 900
(Berger make) over a coat of cement primer to walls as per the
direction including surface preparation, scaffolding etc.
complete in all respect.

Workshop interior Providing and applying cement sand plaster (1:5) to walls , Sqm 80
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.

Workshop interior Providing and applying 2 coats of synthetic enamel paint Sqm 858
(Berger make) over a coat of metal primer to the steel
structures as per the instruction including surface preparation,
scaffolding etc. complete in all respect.

12 Compressor room Providing and applying 2 coats of synthetic enamel paint Sqm 76.8
(Berger make) over a coat of cement/metal primer to walls as
per the direction including surface preparation, scaffolding etc.
complete in all respect.

13 Workshop exterior Providing and applying 2 coats of Weather coat paint (Berger Sqm 880
make) over a coat of exterior grade primer to walls as per the
instruction of the authority including surface preparation,
scaffolding etc. complete in all respect.
14 Corridor near Providing and applying 2 coats of Plastic emulsion paint Sqm 60
store (Berger make) over a coat of cement primer to the walls, ceiling
etc. as directed by the authority including surface preparation,
scaffolding etc. complete in all respect.

15 Store manager Providing and applying 2 coats of Plastic emulsion paint Sqm 40
room (Berger make) over a coat of cement primer to the walls, ceiling
etc. as directed by the authority including surface preparation,
scaffolding etc. complete in all respect.

Provding and fixing Gypsum false ceiling including taking out Sqm 10
the existing false ceiling complet in all respect.
16 GM Customer Providing and applying 2 coats of Plastic emulsion paint Sqm 305
room (Berger make) over a coat of cement primer to the walls, ceiling
etc. as directed by the authority including surface preparation,
scaffolding etc. complete in all respect.

17 Service area Providing and applying 2 coats of synthetic enamel paint/Plastic Sqm
emulsion paint (Berger make) over a coat of cement/metal
primer as required including surface preparation, scaffolding
complete in all respect

18 Boundary wall Providing and applying 2 coats of Weather coat (Berger make) Sqm 290
over a coat of cement primer as required including surface
preparation, scaffolding complete in all respect

19 Rest room office Providing and applying 2 coats of synthetic enamel paint/Plastic Sqm 110
emulsion paint (Berger make) over a coat of cement/metal
primer as required including surface preparation, scaffolding
complete in all respect

Providing and applying cement sand plaster (1:5) to walls , Sqm 27


ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.
24, Budge Budge Trunk Road,

Rate Amount
120 12600

275 2351.25

120 4200

120 5280

275 10312.5

38 2470

38 34200
38 2211.6

275 7342.5

120 36720

120 12264

120 108000

275 22000

120 102960

120 9216

120 105600
120 7200

120 4800

1300 13000

120 36600

120 34800

120 13200

275 7425

594752.85
S.MConstruction & Communication
Barrackpur Road, Kolkata 700 121
MOB: 98366 50710 / 8100632487
Ref. No.S.M/TT/Q/005/2017-18. 12.06.17
Quotation
To

Topsel Toyota
E.M Bypass
Saltlake
Kolkata
Sub : Quotation for raising of floor inside workshop allied civil work
as & where necessary at NH 6 Bombay Road.
Kind Attention : Mr. P . Vasudevan ( Head Service )

Dear Sir,
As discussed with you at time of inspection of propossed site we are submitting our
offer for your kind acceptance.
Sl. Description of work Unit Qty. Rate Amount
No in Rs. P. in Rs. P.
1 Scope of works
Civil Work
1 Raising of floor ( 100 mm thick ) by concreting on top of exising brick Cum 37.00 8700.00 321900.00
on edge soling with M-20 grade of Ready mix concrete to workshop
floor.
2 Reinforcement for reinforced concrete work in all sorts of MT 2.00 75000.00 150000.00
structures including distribution bars, stirrups, binders etc. including
supply of rods, initial straightening and removal of loose rust (if
necessary), cutting to requisite length, hooking and bending to correct
shape, placing in proper position and binding with 16 gauge black
annealed wire at every inter-section complete as per drawing and
direction.

3 Providing applying two coats of snowcem paint to wall. Sqm R/O 60.00
4 Providing applying two coats of weather proof paint to wall. Sqm R/O 75.00
5 Providing and painting lime wash to wall Sqm R/O 55.00

6 Misc civil work like supporting of existing wash area by brick Ls R/O 12000.00
work , tit bits plastering work, Dismantling of existing partition
wall, etc .
Total 471900.00

( Rupees four lakhs two hundred three hundread only )

Terms & Condition: Amount of 40% should be paid in


advance of our quoted amount with your valuable work
order. Balance will be paid according to progress of work
as phase wise.

for S.M Construction & Communication


Proprietor

Actual : 9' x 9' x 4 No / 8x9x4 / 12.25 x 9' x 4 /


S.MConstruction & Communication
Barrackpur Road, Kolkata 700 121
MOB: 98366 50710 / 8100632487
Ref. No.S.M/TT/Q/012/2017-18. 20.08.17
Revised Quotation
To
Topsphares Ltd
Chgamrail
NH-6
Howrah

Sub : Quotation for raising of floor inside the workshop and allied civil works
as & where necessary at NH 6 Bombay Road.
Ref. S.M/TT/Q/005A/2017-18
Kind Attention : Mr. P . Vasudevan ( Head Service )

Sl. Description of work Unit Qty. Rate Amount


No in Rs. P. in Rs. P.
Scope of works
A Construction of trhe office rooms. Size : 26'-6"x8'-7" = 227.34 Sft Sft 227.34 650.00 147771.00

B Construction of the Security room. Size : 07'-6"x6'-2" = 46.20 Sft Sft 46.20 625.00 28875.00

C Construction of the Oil tank room. Size : 10'-3"x 10'-6" = 107.62 Sft Sft 107.62 625.00 67262.50

D Raising of floor
1 Raising of floor ( 100 mm thick ) by concreting on top of exising brick Cum 37.00 8500.00 314500.00
on edge soling with M-20 grade of Ready mix concrete to workshop
floor.
2 Reinforcement for reinforced concrete work in all sorts of MT 1.290 75000.00 96750.00
structures including distribution bars, stirrups, binders etc. including
supply of rods, initial straightening and removal of loose rust (if
necessary), cutting to requisite length, hooking and bending to correct
shape, placing in proper position and binding with 16 gauge black
annealed wire at every inter-section complete as per drawing and
direction.

7 Misc civil work like supporting of existing wash area by brick Ls 1.00 32000.00 32000.00
work , tit bits plastering work, Dismantling of existing partition
wall, etc .
E Painting Works
1 Providing and applying two coats of synthetic enamel paint to Ls 1.00 45000.00 45000.00
structural shed sfter clesning of the existing surface .
2 Providing and applying two coats of synthetic enamel paint to Sft 11000.00 12.50 137500.00
verical GI sheets and wall to workshop floor.
3 Providing and painting to lime wash to asbestos roof and Sft 6200.00 5.25 32550.00
outside of the wokshop.
4 Providing and applying two coats of weather coat paint to Sft 5500.00 12.50 68750.00
exterior wall surface over a coat of primer.
5 Providing and painting to Border 150 mm height as per Rft 130.00 40.00 5200.00
specification.
C/O 976158.50

for S.M Construction & Communication


Proprietor contd..

S.MConstruction & Communication


Barrackpur Road, Kolkata 700 121
MOB: 98366 50710 / 8100632487
Ref. No.S.M/TT/Q/012/2017-18. 20.08.17
Revised Quotation

Sl. Description of work Unit Qty. Rate Amount


No in Rs. P. in Rs. P.
F Misc. Civil Works B/F 976158.50
i) Toilet Block
1 Dismantling of existing steps . Ls 1.00 1200.00 1200.00

2 Providing making of brick work for making of steps with sand cement Cft 37.00 170.00 6290.00
mortar.

3 Providing and making of sand cement plaster with neat cement Sft 60.00 40.00 2400.00
finish.

4 Removal of existing dado from wall and floor to toilet block for Nos 3.00 1800.00 5400.00
fixing of tiles.

5 Poroviding and making of sand cement plaster to wall. Sft 340.00 23.00 7820.00

6 Providing and laying 40mm thick PCC for fixing of tiles. Nos 3.00 1000.00 3000.00

7 Fixing of tiles to floor and wall with sand cement mortar etc all Sft 400.00 38.00 15200.00
complete. ( Tiles should be supplied by deppertment )
ii) Drain in Passage
8 Providing and fixing of 200 mm dia UDC pipe to drain for easy Rft 40.00 280.00 11200.00
clearence of water.
9 Providing and laying of PCC i/c sand cement plaster with neat Rft 100.00 87.00 8700.00
cement finish to inside of the drain for easy sloppe .
10 Providing and making of pit with RCC cover. Nos 1.00 1800.00 1800.00

iii) Other area works


11 Construction of urinal block near boundary wall. Sft 15.00 625.00 9375.00
12 Providing and making of concrete platform in generator room Sft 298.00 110.00 32780.00
and making of concrete ramp to front portion of the Generator
room.
13 Providing and making of cash counter to office block by brick Ls 1.00 8700.00 8700.00
work 10" thick , sand cement plaster, RCC lintel in door top etc
all complete.
Construction of Server room in Mezanine floor.
14 Dismantling of existing brick work. Ls 1.00 750.00 750.00

15 Providing and making of 125 mm thick brick work with sand Sft 60.00 90.00 5400.00
cement mortar
16 Providing and making of 15-20 mm thick sand cement plaster Sft 120.00 23.00 2760.00
to both side of the wall.
C/O 1098933.50
for S.M Construction & Communication

Proprietor contd..

S.MConstruction & Communication


Barrackpur Road, Kolkata 700 121
MOB: 98366 50710 / 8100632487
Ref. No.S.M/TT/Q/012/2017-18. 20.08.17
Revised Quotation

Sl. Description of work Unit Qty. Rate Amount


No in Rs. P. in Rs. P.
iv) Workshop
17 Providing and making of RCC slab in workshop area with B/F 1098933.50
supported by 125mm thick brick work, concreteing work i/c
shuttering , reinforcement work, and plaster with nest cement
finish to top of the slab etc. all complete.
i Brick work Sft 34.00 90.00 3060.00
ii RCC slab i/c shuttering and reinforcement all complete. Ls 1.00 4700.00 4700.00
iii Plaster with neat cement finish in top of the slab and supporting Ls 1.00 1800.00 1800.00
brick work.

v) Pantry

Providing and making of RCC slab in workshop area with Ls 1.00 7200.00 7200.00
supported by 125mm thick brick work, concreteing work i/c
shuttering , reinforcement work, and fixing of mable on top of
the slab etc. all complete as per direction of the department.

vi) Driver's Room


18 Dismantling of brick work , making of brick work in propper Ls 1.00 8200.00 8200.00
sloppe, blocking of jafri openings in diff. location plaster, floor
cutting for drainage, and concreting to floor to driver room.

19 Patch repairing to pump room. Ls 1.00 3500.00 3500.00

20 Repairing to existing RCC ramp and making brick work for Nos 9.00 575.00 5175.00
supporting of beam i/c plaster all complete.

21 Patch plaster to electrical concealed line to workshop, office Ls 1.00 3700.00 3700.00
and as where necessary.
1136268.50
( Rupees eleven lakhs thirty six thousands two hundred
sixty eight and paisa fifty only )

Add GST as per Govt rules

N.B : Quotation for ETP tank, Water proofing of washing pit


and water tank inside of the pump room will be submitted
latter.

for S.M Construction & Communication


Proprietor
S.MConstruction & Communication
Barrackpur Road, Kolkata 700 121
MOB: 98366 50710 / 8100632487
Ref. No.S.M/TT/Q/015/2017-18. 20.09.17
Quotation
To

Madhesiya Motors
Chgamrail
NH-6
Howrah

Sub : Quotation for Masonery job in propossed 2n floor of the building.

Kind Attention : Mr. Lokesh Kumar Sharma

Sl. Description of work Unit Qty. Rate Amount


No in Rs. P. in Rs. P.
Scope of works : Brick work, Plaster and titbits concreting work
as where & Necessary.

1 Providing and making of 10" thick brick work with sand cement mortar Cft R/O 170.00
( 1:5) proportion i/c necessary scafolding work etc all complete.

2 Providing and making of 10" thick brick work with sand cement mortar Sft R/O 90.00
( 1:5) proportion i/c necessary scafolding work etc all complete.

3 Providing and making of Sand cement plater to ceiling and wall with Sft R/O 23.00
( sand cement mortar(1:4 ) proportion i/c necessary scafolding work
etc all complete.

4 Providing and making of Sand cement plater with neat cement finish if Sft R/O 40.00
required wall dado with i/c necessary scafolding work etc all
complete.

Add GST as per Govt rules

N.B :

for S.M Construction & Communication

Proprietor