Escolar Documentos
Profissional Documentos
Cultura Documentos
Trunk Road,
Maheshtala, Kolkata, West Bengal 700141
Providing and applying cement sand plaster (1:5) to walls , Sqm 8.55
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.
2 Closed pantry Providing and applying 2 coats of synthetic enamel paint Sqm 38
(Berger make) over a coat of cement/metal primer as required
including surface preparation, scaffolding complete.
3 Beside Closed Providing and applying 2 coats of synthetic enamel paint Sqm 48
Pantry Store (Berger make) over a coat of cement/metal primer as required
including surface preparation, scaffolding complete.
Providing and applying cement sand plaster (1:5) to walls , Sqm 37.5
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.
4 Technician toilet Providing and applying 2 coats of Lime wash to walls, ceiling Sqm 72.5
and dressing area etc. as per the instruction including surface preparation,
scaffolding complete in all respect.
5 Staff quarter
terrace room
6 1st floor staff
quarter
Providing and applying 2 coats of Lime wash to walls, ceiling
7 Toilet etc. as per the instruction including surface preparation, Sqm 920
a Store scaffolding complete in all respect.
b Kitchen
c Room
d Stair
8 Generator room Providing and applying 2 coats of Lime wash to walls, ceiling Sqm 58.2
etc. as per the instruction including surface preparation,
scaffolding complete in all respect.
Providing and applying cement sand plaster (1:5) to walls , Sqm 26.7
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.
9 Exterior part of Providing and applying 2 coats of Weather coat paint (Berger Sqm 306
staff quarter make) over a coat of exterior grade primer to walls as per the
instruction of the authority including surface preparation,
scaffolding etc. complete in all respect.
10 Chila Cota Providing and applying 2 coats of Weather coat paint (Berger Sqm 102.2
(Mumty room) make) over a coat of exterior grade primer to walls as per the
instruction of the authority including surface preparation,
scaffolding etc. complete in all respect.
11 Workshop interior Providing and applying 2 coats of synthetic enamel paint Sqm 1000
(Berger make) over a coat of cement primer to walls as per the
direction including surface preparation, scaffolding etc.
complete in all respect.
Workshop interior Providing and applying cement sand plaster (1:5) to walls , Sqm 80
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.
Workshop interior Providing and applying 2 coats of synthetic enamel paint Sqm 858
(Berger make) over a coat of metal primer to the steel
structures as per the instruction including surface preparation,
scaffolding etc. complete in all respect.
12 Compressor room Providing and applying 2 coats of synthetic enamel paint Sqm 76.8
(Berger make) over a coat of cement/metal primer to walls as
per the direction including surface preparation, scaffolding etc.
complete in all respect.
13 Workshop exterior Providing and applying 2 coats of Weather coat paint (Berger Sqm 880
make) over a coat of exterior grade primer to walls as per the
instruction of the authority including surface preparation,
scaffolding etc. complete in all respect.
14 Corridor near Providing and applying 2 coats of Plastic emulsion paint Sqm 64.4
store (Berger make) over a coat of cement primer to the walls, ceiling
etc. as directed by the authority including surface preparation,
scaffolding etc. complete in all respect.
15 Store manager Providing and applying 2 coats of Plastic emulsion paint Sqm 43.4
room (Berger make) over a coat of cement primer to the walls, ceiling
etc. as directed by the authority including surface preparation,
scaffolding etc. complete in all respect.
Provding and fixing Gypsum false ceiling including taking out Sqm 10
the existing false ceiling complet in all respect.
16 GM Customer Providing and applying 2 coats of Plastic emulsion paint Sqm 337
room (Berger make) over a coat of cement primer to the walls, ceiling
etc. as directed by the authority including surface preparation,
scaffolding etc. complete in all respect.
17 Service area Providing and applying 2 coats of synthetic enamel paint/Plastic Sqm 368
emulsion paint (Berger make) over a coat of cement/metal
primer as required including surface preparation, scaffolding
complete in all respect
18 Boundary wall Providing and applying 2 coats of Weather coat (Berger make) Sqm 306.6
over a coat of cement primer as required including surface
preparation, scaffolding complete in all respect
19 Rest room office Providing and applying 2 coats of synthetic enamel paint/Plastic Sqm 120
emulsion paint (Berger make) over a coat of cement/metal
primer as required including surface preparation, scaffolding
complete in all respect
Rate Amount
130 14040
275 2351.25
130 4940
130 6240
275 10312.5
45 3262.5
45 41400
45 2619
275 7342.5
130 39780
130 13286
130 130000
275 22000
130 111540
130 9984
130 114400
130 8372
130 5642
1300 13000
130 43810
130 47840
130 39858
130 15600
275 8250
715869.75
Name of work: Periodical maintenance of Topsel Toyota showroom cum office and service centre 522/524, Budge Budge Trunk Road,
Maheshtala, Kolkata, West Bengal 700141
Providing and applying cement sand plaster (1:5) to walls , Sqm 8.55
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.
2 Closed pantry Providing and applying 2 coats of synthetic enamel paint Sqm 35
(Berger make) over a coat of cement/metal primer as required
including surface preparation, scaffolding complete.
3 Beside Closed Providing and applying 2 coats of synthetic enamel paint Sqm 44
Pantry Store (Berger make) over a coat of cement/metal primer as required
including surface preparation, scaffolding complete.
Providing and applying cement sand plaster (1:5) to walls , Sqm 37.5
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.
4 Technician toilet Providing and applying 2 coats of Lime wash to walls, ceiling Sqm 65
and dressing area etc. as per the instruction including surface preparation,
scaffolding complete in all respect.
5 Staff quarter
terrace room
6 1st floor staff
quarter
Providing and applying 2 coats of Lime wash to walls, ceiling
7 Toilet etc. as per the instruction including surface preparation, Sqm 900
a Store scaffolding complete in all respect.
b Kitchen
c Room
d Stair
8 Generator room Providing and applying 2 coats of Lime wash to walls, ceiling Sqm 58.2
etc. as per the instruction including surface preparation,
scaffolding complete in all respect.
Providing and applying cement sand plaster (1:5) to walls , Sqm 26.7
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.
9 Exterior part of Providing and applying 2 coats of Weather coat paint (Berger Sqm 306
staff quarter make) over a coat of exterior grade primer to walls as per the
instruction of the authority including surface preparation,
scaffolding etc. complete in all respect.
10 Chila Cota Providing and applying 2 coats of Weather coat paint (Berger Sqm 102.2
(Mumty room) make) over a coat of exterior grade primer to walls as per the
instruction of the authority including surface preparation,
scaffolding etc. complete in all respect.
11 Workshop interior Providing and applying 2 coats of synthetic enamel paint Sqm 900
(Berger make) over a coat of cement primer to walls as per the
direction including surface preparation, scaffolding etc.
complete in all respect.
Workshop interior Providing and applying cement sand plaster (1:5) to walls , Sqm 80
ceiling etc. as per requirement including dismantling the
existing damaged palster, necessary scaffolding, staging etc.
complete.
Workshop interior Providing and applying 2 coats of synthetic enamel paint Sqm 858
(Berger make) over a coat of metal primer to the steel
structures as per the instruction including surface preparation,
scaffolding etc. complete in all respect.
12 Compressor room Providing and applying 2 coats of synthetic enamel paint Sqm 76.8
(Berger make) over a coat of cement/metal primer to walls as
per the direction including surface preparation, scaffolding etc.
complete in all respect.
13 Workshop exterior Providing and applying 2 coats of Weather coat paint (Berger Sqm 880
make) over a coat of exterior grade primer to walls as per the
instruction of the authority including surface preparation,
scaffolding etc. complete in all respect.
14 Corridor near Providing and applying 2 coats of Plastic emulsion paint Sqm 60
store (Berger make) over a coat of cement primer to the walls, ceiling
etc. as directed by the authority including surface preparation,
scaffolding etc. complete in all respect.
15 Store manager Providing and applying 2 coats of Plastic emulsion paint Sqm 40
room (Berger make) over a coat of cement primer to the walls, ceiling
etc. as directed by the authority including surface preparation,
scaffolding etc. complete in all respect.
Provding and fixing Gypsum false ceiling including taking out Sqm 10
the existing false ceiling complet in all respect.
16 GM Customer Providing and applying 2 coats of Plastic emulsion paint Sqm 305
room (Berger make) over a coat of cement primer to the walls, ceiling
etc. as directed by the authority including surface preparation,
scaffolding etc. complete in all respect.
17 Service area Providing and applying 2 coats of synthetic enamel paint/Plastic Sqm
emulsion paint (Berger make) over a coat of cement/metal
primer as required including surface preparation, scaffolding
complete in all respect
18 Boundary wall Providing and applying 2 coats of Weather coat (Berger make) Sqm 290
over a coat of cement primer as required including surface
preparation, scaffolding complete in all respect
19 Rest room office Providing and applying 2 coats of synthetic enamel paint/Plastic Sqm 110
emulsion paint (Berger make) over a coat of cement/metal
primer as required including surface preparation, scaffolding
complete in all respect
Rate Amount
120 12600
275 2351.25
120 4200
120 5280
275 10312.5
38 2470
38 34200
38 2211.6
275 7342.5
120 36720
120 12264
120 108000
275 22000
120 102960
120 9216
120 105600
120 7200
120 4800
1300 13000
120 36600
120 34800
120 13200
275 7425
594752.85
S.MConstruction & Communication
Barrackpur Road, Kolkata 700 121
MOB: 98366 50710 / 8100632487
Ref. No.S.M/TT/Q/005/2017-18. 12.06.17
Quotation
To
Topsel Toyota
E.M Bypass
Saltlake
Kolkata
Sub : Quotation for raising of floor inside workshop allied civil work
as & where necessary at NH 6 Bombay Road.
Kind Attention : Mr. P . Vasudevan ( Head Service )
Dear Sir,
As discussed with you at time of inspection of propossed site we are submitting our
offer for your kind acceptance.
Sl. Description of work Unit Qty. Rate Amount
No in Rs. P. in Rs. P.
1 Scope of works
Civil Work
1 Raising of floor ( 100 mm thick ) by concreting on top of exising brick Cum 37.00 8700.00 321900.00
on edge soling with M-20 grade of Ready mix concrete to workshop
floor.
2 Reinforcement for reinforced concrete work in all sorts of MT 2.00 75000.00 150000.00
structures including distribution bars, stirrups, binders etc. including
supply of rods, initial straightening and removal of loose rust (if
necessary), cutting to requisite length, hooking and bending to correct
shape, placing in proper position and binding with 16 gauge black
annealed wire at every inter-section complete as per drawing and
direction.
3 Providing applying two coats of snowcem paint to wall. Sqm R/O 60.00
4 Providing applying two coats of weather proof paint to wall. Sqm R/O 75.00
5 Providing and painting lime wash to wall Sqm R/O 55.00
6 Misc civil work like supporting of existing wash area by brick Ls R/O 12000.00
work , tit bits plastering work, Dismantling of existing partition
wall, etc .
Total 471900.00
Sub : Quotation for raising of floor inside the workshop and allied civil works
as & where necessary at NH 6 Bombay Road.
Ref. S.M/TT/Q/005A/2017-18
Kind Attention : Mr. P . Vasudevan ( Head Service )
B Construction of the Security room. Size : 07'-6"x6'-2" = 46.20 Sft Sft 46.20 625.00 28875.00
C Construction of the Oil tank room. Size : 10'-3"x 10'-6" = 107.62 Sft Sft 107.62 625.00 67262.50
D Raising of floor
1 Raising of floor ( 100 mm thick ) by concreting on top of exising brick Cum 37.00 8500.00 314500.00
on edge soling with M-20 grade of Ready mix concrete to workshop
floor.
2 Reinforcement for reinforced concrete work in all sorts of MT 1.290 75000.00 96750.00
structures including distribution bars, stirrups, binders etc. including
supply of rods, initial straightening and removal of loose rust (if
necessary), cutting to requisite length, hooking and bending to correct
shape, placing in proper position and binding with 16 gauge black
annealed wire at every inter-section complete as per drawing and
direction.
7 Misc civil work like supporting of existing wash area by brick Ls 1.00 32000.00 32000.00
work , tit bits plastering work, Dismantling of existing partition
wall, etc .
E Painting Works
1 Providing and applying two coats of synthetic enamel paint to Ls 1.00 45000.00 45000.00
structural shed sfter clesning of the existing surface .
2 Providing and applying two coats of synthetic enamel paint to Sft 11000.00 12.50 137500.00
verical GI sheets and wall to workshop floor.
3 Providing and painting to lime wash to asbestos roof and Sft 6200.00 5.25 32550.00
outside of the wokshop.
4 Providing and applying two coats of weather coat paint to Sft 5500.00 12.50 68750.00
exterior wall surface over a coat of primer.
5 Providing and painting to Border 150 mm height as per Rft 130.00 40.00 5200.00
specification.
C/O 976158.50
2 Providing making of brick work for making of steps with sand cement Cft 37.00 170.00 6290.00
mortar.
3 Providing and making of sand cement plaster with neat cement Sft 60.00 40.00 2400.00
finish.
4 Removal of existing dado from wall and floor to toilet block for Nos 3.00 1800.00 5400.00
fixing of tiles.
5 Poroviding and making of sand cement plaster to wall. Sft 340.00 23.00 7820.00
6 Providing and laying 40mm thick PCC for fixing of tiles. Nos 3.00 1000.00 3000.00
7 Fixing of tiles to floor and wall with sand cement mortar etc all Sft 400.00 38.00 15200.00
complete. ( Tiles should be supplied by deppertment )
ii) Drain in Passage
8 Providing and fixing of 200 mm dia UDC pipe to drain for easy Rft 40.00 280.00 11200.00
clearence of water.
9 Providing and laying of PCC i/c sand cement plaster with neat Rft 100.00 87.00 8700.00
cement finish to inside of the drain for easy sloppe .
10 Providing and making of pit with RCC cover. Nos 1.00 1800.00 1800.00
15 Providing and making of 125 mm thick brick work with sand Sft 60.00 90.00 5400.00
cement mortar
16 Providing and making of 15-20 mm thick sand cement plaster Sft 120.00 23.00 2760.00
to both side of the wall.
C/O 1098933.50
for S.M Construction & Communication
Proprietor contd..
v) Pantry
Providing and making of RCC slab in workshop area with Ls 1.00 7200.00 7200.00
supported by 125mm thick brick work, concreteing work i/c
shuttering , reinforcement work, and fixing of mable on top of
the slab etc. all complete as per direction of the department.
20 Repairing to existing RCC ramp and making brick work for Nos 9.00 575.00 5175.00
supporting of beam i/c plaster all complete.
21 Patch plaster to electrical concealed line to workshop, office Ls 1.00 3700.00 3700.00
and as where necessary.
1136268.50
( Rupees eleven lakhs thirty six thousands two hundred
sixty eight and paisa fifty only )
Madhesiya Motors
Chgamrail
NH-6
Howrah
1 Providing and making of 10" thick brick work with sand cement mortar Cft R/O 170.00
( 1:5) proportion i/c necessary scafolding work etc all complete.
2 Providing and making of 10" thick brick work with sand cement mortar Sft R/O 90.00
( 1:5) proportion i/c necessary scafolding work etc all complete.
3 Providing and making of Sand cement plater to ceiling and wall with Sft R/O 23.00
( sand cement mortar(1:4 ) proportion i/c necessary scafolding work
etc all complete.
4 Providing and making of Sand cement plater with neat cement finish if Sft R/O 40.00
required wall dado with i/c necessary scafolding work etc all
complete.
N.B :
Proprietor