Você está na página 1de 1

FIELD Quality plan

Qp No. 1 Sewage Treatment Plants at


ITEM :CIVIL Work Doddabele,Yellamalappachetty
KEC WATERLEAU Date:- Rev.NO. 0 and Intermediate Sewage pumping Station and
(JV) Pumping Mains at Sadarmangala

Contract No. S1e

(LOA NO. & Date: )

Client : M/s.
Contractor : M/s. KEC-Waterleau

Daily Concrete Batching Formula for RMC Production


( As Per IS : 516 )
Conc. Mix Design ID : Grade of Concrete : Date :

Plant ID :

Weight
Weight for for
Approved Mix Design :- Ingradients
1 m3
0.5 m3

Cement
Water
Natural Sand
Crushed Sand
10 mm CA
20 mm CA
40 mm Ca
Admixture

Sr. No. Size of Wt of Sample Dry Weight Weight % of Weight % of water Absorption Free
Aggregate Loss Loss Moisture
gm gm gm
1 Sand

2 10 mm

3 20 mm

4 40 mm

Concrete Batch Weight for Production:-

Weight for Corrected Batch Weight(kg) (For


Ingradients m3(kg) Correction Applied ( Calculation)
Plant Operator)

Cement
Water
Natural Sand
Crushed Sand
10 mm CA
20 mm CA
40 mm Ca
Admixture

Signature of Contractor Signature of Client Signature of Client


( KEC Waterleau.) (CCD, ) (FQA,)

Você também pode gostar