April 2009
www.eni.it
Basis and Criteria of the Study
Results
2
SUMMARY OF THE STUDY
3
Basic Data
4
Gas Composition and Characteristics
5
Malta Required Flowrate
Mid-season week day Mid-season Weekend day Summer Week day
Summer Weekend day Winter Week day Winter Weekend day
Peak day
140
103 x SCM/h
120
100
80
60
40
20
0
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
Hour
6
Pipeline Data
Pipeline characteristics
Pipe Material Steel Grade API 5L-X65
SMYS 450 MPa
SMTS 535 MPa
Steel Density 7850 kg/m3
Young Modulus 207000 MPa
Poisson Ratio 0.3
Coefficient Of thermal Expansion 1.16 x 10-5 C-1
Sea Water Density 1026 kg/m3
Concrete Density 3040 kg/m3
Corrosion Coating Density 1300 kg/m3
Corrosion Coating Thickness 2.5 mm
Corrosion Allowance 0 mm
1.5% OD
Out of roundness
but maximum 15 mm
0.75 mm for t 15 mm
Thickness tolerance
1.00 mm for t > 15 mm
7
Soil Data
KP KP Dr Su D50
SOIL GELA-MALTA 3 2
From To kN/m Deg. % kN/m mm
Fine SAND with occasion Shell becoming medium 0.09-0.16 0.7
0 4.4 9 44 85-100 --
toward coast (max.)
Silty Fine SAND with Occasional Shell. Possible
4.4 7.9 9 32 35-65 -- 0.07-0.1
Presence of clayey SAND.
7.9 10.2 Very Soft Silty CLAY with Occasional Shell 7.5 -- -- 2 0.009-0.013
8
Hydraulic Analysis - Inlet and Delivery Gas Conditions
9
Hydraulic Analysis Data Input
Pipe and Soil data:
Steel grade: X65
Pipe internal roughness: 25 microns
Corrosion Coating Thickness: 2.5 mm.
Pipeline Material
Thermal Conductivity
W/m K
Steel 50
Corrosion Coating (PE) 0.3
Overweight Concrete 2.33
W/m K
Wet Sand 2
Dry Sand at Gela 1
Dry Sand at Malta 1.5
10
Hydraulic Analysis Data Input
Pipeline Burial Configuration:
The pipeline is assumed buried in the onshore sections and in the coastal
areas (i.e. for WD<30m at Gela side and for WD<35-40m at Malta side).
The pipeline is considered unburied in the deep water.
11
Results
12
Scenario 16 OD Pipeline Gela Malta (Delimara):
Process Analyses Results
Scenario A - 16" ND Pipeline
- Flow Rates Trends-
120,000
110,000
100,000
90,000
80,000
Flow Rate [Scm/h]
70,000
60,000
50,000
40,000
30,000
20,000 Gas Supply at Gela Terminal (P/L Inlet)
10,000 Gas Delivery at Delimara Terminal (P/L Outlet)
0
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Time [h]
44
42
40
38
36
34
32
30
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Time [h]
13
Scenario 18 OD Pipeline Gela Malta (Delimara):
Process Analyses Results
Scenario A - 18" ND Pipeline
- Flow Rates Trends-
120,000
100,000
80,000
Flow Rate [Scm/h]
60,000
40,000
44
42
40
38
36 Pressure Supply at Gela Terminal (P/L Inlet)
34 Pressure Delivery at Delimara Terminal (P/L Outlet)
32
Minimum Delivery
30
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
Time [h]
14
Scenario 18 OD Pipeline Gela Malta (Delimara):
Wall Thickness Analyses Results
-20 18
WT=15.9
-40 16
-60 14
WT=10.3
-100 10
-120 8
-140 6
-160 4
-180 2
-200 0
0 20000 40000 60000 80000 100000 120000 140000
KP (m)
15
Scenario 18 OD Pipeline Gela Malta (Delimara):
On Bottom Stability and Layability Analyses Results
50 100
CCT= 90.0 CCT= 90.0
90
0 80
-50 60
50
CCT= 40.0
-100 40
30
-150 20
10
-200 0
0 20000 40000 60000 80000 100000 120000 140000
KP (m)
16
Budgetary
Estimates
17
Budgetary Estimates - CAPEX
Scenario
CAPITAL COSTS
OD = 18"
Inch 18
Materials Meuro 53
18
Budgetary Estimates - OPEX
Scenario
OPERATING COST
OD = 18"
19
Budgetary Estimates Notes
The budgetary cost estimate has been evaluated in Euro on the basis of in house data
bank. Particularly, the following cost for procurement of steel pipeline have been considered:
2,000 Euro/ton
20
Budgetary Estimates Exclusions
21