Escolar Documentos
Profissional Documentos
Cultura Documentos
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 2
Aditya Bayu Putranto Fresh Graduate & CCNA Certified
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 3
Actually 4 things
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 4
At Universitas Sanata Dharma Yogyakarta, Indonesia
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 5
WebEx Meeting
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 6
Just technical issue.
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 7
Business Communication
Reliable Network
Redundant Network
Small Company
Cisco Switch 2960
Spanning Tree Protocol
Legacy protocol
STP timers
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 8
Convergence Time 30 50 second
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 9
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 10
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 11
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 12
Timers Setting vs Convergence Time.
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 13
STP Timers impact for initial convergence, failover convergence,
dan recovery convergence.
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 14
Literature Review
Planning
Implement
Data Measurement
Data Analysis
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 15
Aditya Bayu Putranto - 085314113
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 16
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 17
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 18
Lets zoom in
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 19
The legacy protocol
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 20
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 21
Electing a root switch
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 22
Hello Time
Forward Delay
Maximum Age
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 23
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 24
My technical constraint device constraint.
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 25
Only 9 Catalyst 2960
Data Measurement
Whole Network
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 26
Network Diameter
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 27
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 28
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 29
Switch>enable
Switch#configure terminal
Enter configuration commands, one per line. End with CNTL/Z.
Switch(config)#spanning-tree vlan 1 hello 2
Switch(config)#spanning-tree vlan 1 forward 15
Switch(config)#spanning-tree vlan 1 max 20
Switch(config)#
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 30
Initial Convergence
Failover Convergence
Recovery Convergence
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 31
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 32
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 33
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 34
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 35
*Direct Topology Change
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 36
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 37
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 38
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 39
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 40
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 41
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 42
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 43
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 44
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 45
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 46
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 47
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 48
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 49
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 50
Aditya Bayu Putranto - 085314113
2010
2010 Cisco
Cisco and/or
and/or its
its affiliates.
affiliates. All
All rights
rights reserved.
reserved. Cisco Confidential 51
Forward Delay
Flapping
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 52
More Maximum Network
Diameter
Packet Filtering
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 53
Hucaby, David (2010), CCNP Switch 642-813 Official Certification Guide, Protocol Timers, Document ID: 19120.
Chapter 7: Traditional Spanning Tree Protocol.
Cisco Systems, Inc. (2005), Data Sheet: Cisco Catalyst 2960 Series Switches.
Cisco System, Inc. (2007), CCNA Exploration 4.0: LAN Switching and
Wireless, Cisco System, Inc., Chapter 1: Switched LAN Architecture.
The Wireshark Team, Wireshark FAQ, (www.wireshark.org/faq.html),
Diakses pada tanggal 9 September 2012.
Cisco System, Inc. (2007), CCNA Exploration 4.0: LAN Switching and
Wireless, Cisco System, Inc., Chapter 3: VLANs.
IEEE 802.1 Working Group (1998), 802.1D-1998 ANSI/IEEE Standards
802.1D, 1998 Edition Document: Media Access Control Bridges
Cisco System, Inc (2007), CCNA Exploration 4.0: LAN Switching and
Wireless, Cisco System, Inc., Chapter 4: STP.
Cisco Systems, Inc., Cisco Catalyst 2960 Series Switches
(www.cisco.com/en/US/products/ps6406/index.html), Diakses pada tanggal 18
Sofana, Iwan (2010), Cisco CCNA & Jaringan Komputer, Penerbit Informatika. November 2012.
Hucaby, David (2010), CCNP Switch 642-813 Official Certification Guide, Networkers 2004, Accurate Time Synchronization on Cisco Routers, Cisco
Chapter 4: VLANs and Trunks Document ID: NMS-1N03.
Sincoskie, W. D., Cotton, C. J (1988), Extended Bridge Algorithms for Large Quigley, J Colin (2011), An Investigation into Spanning Tree Protocol 802.1D
Networks, IEEE Network Journal January and Convergence Performance, Honours Final Project Report.
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 54
2010 Cisco and/or its affiliates. All rights reserved. Cisco Confidential 55
Thank you.