Você está na página 1de 4

2017 4

46 7 CONSTUCTION TECHNOLOGY 53

DOI 10. 7672 / sgjs2017070053



300383





TU94 A 1002-8498 2017 07-0053-04

Analysis and educing Measures of Steel Structure Fabricated House Cost


YIN YisongBA HuHAN Yuetao
China Construction Steel Structure Co Ltd Tianjin 300383China

Abstract Aiming at the cost of steel assemble housing is generally higher than the current traditional
cast-in-situ concrete structure housingsteel modular managementpartition wall retaining structure
reductionconstruction period and policy support and other aspects are summarized to analyze steel
structure prefabricated construction cost measures and feasibilityproviding a way for prefabricated
buildings into market popularly
Key words steel structures precast residence industrialization cost modularization

1
4

70m 7
6% 10% 0. 15g
5% 2
150 / m 70m

2
400 / m

2
m
1


ALC


70m 8
2
0. 20g + ALC
2. 1
70m

+
2
70m 120kg / m

2
E-mail
yinyisong2008@ 163 com

2017-01-20
H H
54 46

1 7 21
0. 15g 2. 9m
Table 1 Cost of cast-in-place shear wall structure 7 degree0. 15g2. 9m hight21 floors

49 30kg / m2 0 37m3 / m2 3 19m2 / m2 0 12m3 / m2 0 80m2 / m2
4 6 / kg 400 / m3 57 / m2 730 / m3 26 / m2
/ m 2 226 78 148 00 181 83 87 60 20 80 30 00
/ m 2 695 01



40 / m2
3 400 / t 340 / m3

2 7
0. 15g 2. 9m
33
Table 2 Cost of cast-in-place shear wall structure 7 degree0. 15g2. 9m hight33 floors

2 3 2 2 2 3 2 2 2
53 50kg / m 0 43m / m 3 34m / m 0 11m / m 0 70m / m
3 2 3 2
4 6 / kg 400 / m 57 / m 730 / m 26 / m
/ m 2 246 10 172 00 190 38 80 30 18 20 28 50
/ m 2 735 48




340 / m3 40 / m2
3 400 / t

3 7
0. 15g 3m
21
Table 3 Cost of steel structure residence 7 degree0. 15g3m hight21 floors
ALC
2 3 2 2 2 3 2 2 2
80kg / m 0 11m / m 0 9m / m 0 24m / m 1 6m / m
6 36 / kg 400 / m3 48 / m2 900 / m3 7 / m2
/ m 2 508 80 44 00 43 20 216 00 11 20 18 00
/ m 2 841 2


+
340 / m3 40 / m2
6 360 / t

4 7 33
0. 15g 3m
Table 4 Cost of steel structure residence 7 degree0. 15g3m hight33 floors
ALC
125kg / m2 0 11m3 / m2 0 9m2 / m2 0 24m3 / m2 1 6m2 / m2
6 36 / kg 400 / m3 48 / m2 900 / m3 7 / m2
/ m 2 699 60 44 00 43 20 216 00 11 20 17 00
/ m 2 1 127 2



+
340 / m3 40 / m2
6 360 / t


H
6 360 / t
H
3 400 / t H

5 200 / t 3 4m 1 /15 200 300mm
H 20 30 24 70m 300
2
/ m 70m
400mm

2017 No 7 55



GB501182010
2. 2 40dB 45dB
3
75mm 50mm
45dB
5 I a
130 / m2 B07
200mm ALC
45dB 6
2. 3
1 /3
150mm ALC
ALC
0. 11W / mK 73% 21
150mm ALC 200mm 6%
80mm ALC 1 /3 2%
40 200mm ALC 2
75mm 0. 5%
45dB ALC 6%
85% 30 2
2. 5% 17 / m
2
/m 6 000 / m2 2 30%
45 / m
2


5 75mm 500 2 000Hz
Table 5 Sound insulation values of 75mm-thickness hollow aerated concrete double walls
/ / dB
/ mm
kgm 2 125 250 500 1 000 2 000 4 000 Ia

a = 60
192 95. 9 41 41 47 51 64 71 50 51
b = 80 d = 50

a = 80
193 120 43 47 48 58 68 74 53 54
b = 120 d = 50

a = 100b = 150
194 125 41 42 50 62 72 76 55 54
380d = 100

a = b = 75

195 d = 50 37 44 44 49 60 67 49 49
196 d = 75 39 49 49 56 66 70 54 54

197 d = 100 40 50 50 57 65 70 55 55
198 d = 150 140 42 50 51 58 67 73 56 55
199 d = 200 40 52 51 59 71 76 57 58
200 d = 300 41 55 58 58 77 79 61 60
201 d = 400 42 57 59 63 76 80 62 62
56 46

6 ALC 3
Table 6 ALC walls structure and sound
insulation calculation

ALC 5% 8%

10% 20%
/ mm 200 30 8

/ kgm 3 750 2 000 2 000
/ kgm 2 226 226200kg / m2
/ dB = 23lg226 9 = 45. 145

2. 4
90%

60%
1 /2


215
2

135 55 / m
40%
21

57 43 30 / m2
3

2

30 / m

2. 5







3% 1
2
100 / m M
2016
2 D

2015

3 M
2004
4 J

2. 6 2005 6 18-21

5 J
21
2012 6 40-41
6
2
CO2 480kg / m
J 2005 10 31-
2
740. 6kg / m 35% 35
42
7 J
900
2001 8 17-19
35
1 000kg / m2 2
1 500 1 800kg / m 8 J
40%
2001 8 39-41

9 J
45 21 58-60
2016 70

5%

9 000hm2 30%


010-68333804
5% 10

Você também pode gostar