Escolar Documentos
Profissional Documentos
Cultura Documentos
1
[GeoStructural Analysis - Gravity Wall | version 5.16.13.0 | Copyright 2013 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Verificacin Muro de Cerco
0,00:1
0,50 0,310,24
1,20
0,70 0,00:1 0,70
1:0,00
0,55
Basic soil parameters
jef cef g gsu d
No. Name Pattern
[] [kPa] [kN/m3] [kN/m3] []
Low plasticity clay (CL,CI), consistency
1 19,00 12,00 21,00 13,00 2,00
firm
All soils are considered as cohesionless for at rest pressure analysis.
Soil parameters
Low plasticity clay (CL,CI), consistency firm
Unit weight : g = 21,00 kN/m3
Stress-state : effective
Angle of internal friction : jef = 19,00
Cohesion of soil : cef = 12,00 kPa
Angle of friction struc.-soil : d = 2,00
Soil : cohesionless
Saturated unit weight : gsat = 23,00 kN/m3
Terrain profile
Terrain behind the structure is flat.
Water influence
GWT behind the structure lies at a depth of 0,80 m
Uplift in foot. bottom due to different pressures is not considered.
2
[GeoStructural Analysis - Gravity Wall | version 5.16.13.0 | Copyright 2013 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Verificacin Muro de Cerco
11,26
-1,7
+x
1,20
+z
0,55
Settings of the stage of construction
Design situation : permanent
Verification No. 1
Passive pressure on front face of the structure - partial results
Layer Thickness a jd cd g dd Kp Comment
No. [m] [] [] [kPa] [kN/m3] []
1 0,70 0,00 19,00 12,00 21,00 0,00 4,254
Passive pressure distribution on front face of the structure
Layer Start [m] sZ sW Pressure Hor. comp. Vert. comp.
No. End [m] [kPa] [kPa] [kPa] [kPa] [kPa]
0,00 0,00 0,00 33,65 33,65 0,00
1
0,70 14,70 0,00 62,54 62,54 0,00
Active pressure behind the structure - partial results
Layer Thickness a jd cd g dd Ka Comment
No. [m] [] [] [kPa] [kN/m3] []
1 0,50 0,00 19,00 12,00 21,00 2,00 0,497
2 0,30 0,00 19,00 12,00 21,00 2,00 0,497
3 0,40 0,00 19,00 12,00 13,00 2,00 0,497
Active pressure distribution behind the structure (without surcharge)
Layer Start [m] sZ sW Pressure Hor. comp. Vert. comp.
No. End [m] [kPa] [kPa] [kPa] [kPa] [kPa]
0,00 0,00 0,00 0,00 0,00 0,00
1
0,50 10,50 0,00 0,00 0,00 0,00
0,50 10,50 0,00 0,00 0,00 0,00
2
0,80 16,80 0,00 0,00 0,00 0,00
0,80 16,80 0,00 0,00 0,00 0,00
3
1,20 22,00 4,00 0,00 0,00 0,00
3
[GeoStructural Analysis - Gravity Wall | version 5.16.13.0 | Copyright 2013 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Verificacin Muro de Cerco
1,26
1,20 10,10
33,67
0,80
+x
0,55
+z
4
[GeoStructural Analysis - Gravity Wall | version 5.16.13.0 | Copyright 2013 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Verificacin Muro de Cerco
1,20
0,55
20,65
20,65
Dimensioning No. 1
Active pressure behind the structure - partial results
Layer Thickness a jd cd g dd Ka Comment
No. [m] [] [] [kPa] [kN/m3] []
1 0,50 0,00 19,00 12,00 21,00 2,00 0,497
Active pressure distribution behind the structure (without surcharge)
Layer Start [m] sZ sW Pressure Hor. comp. Vert. comp.
No. End [m] [kPa] [kPa] [kPa] [kPa] [kPa]
0,00 0,00 0,00 0,00 0,00 0,00
1
0,50 10,47 0,00 0,00 0,00 0,00
Water pressure distribution
Point Depth Hor. comp. Vert. comp.
No. [m] [kPa] [kPa]
1 0,00 0,00 0,00
2 0,50 0,00 0,00
5
[GeoStructural Analysis - Gravity Wall | version 5.16.13.0 | Copyright 2013 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Verificacin Muro de Cerco
6
[GeoStructural Analysis - Gravity Wall | version 5.16.13.0 | Copyright 2013 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Verificacin Muro de Cerco
Soil parameters
Low plasticity clay (CL,CI), consistency firm
Unit weight : g = 21,00 kN/m3
Stress-state : effective
Angle of internal friction : jef = 19,00
Cohesion of soil : cef = 12,00 kPa
Saturated unit weight : gsat = 23,00 kN/m3
Rigid bodies
g
No. Name Sample
[kN/m3]
7
[GeoStructural Analysis - Gravity Wall | version 5.16.13.0 | Copyright 2013 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Verificacin Muro de Cerco
Water
Water type : GWT
Coordinates of GWT points [m]
No. GWT location
x z x z x z
-10,00 -1,20 0,00 -1,20 0,05 -0,80
10,00 -0,80
Tensile crack
Tensile crack not inputted.
Earthquake
Earthquake not included.
Settings of the stage of construction
Design situation : permanent
Results (Stage of construction 1)
Analysis 1
Circular slip surface
8
[GeoStructural Analysis - Gravity Wall | version 5.16.13.0 | Copyright 2013 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]
Verificacin Muro de Cerco
9
[GeoStructural Analysis - Gravity Wall | version 5.16.13.0 | Copyright 2013 Fine spol. s r.o. All Rights Reserved | www.finesoftware.eu]