Project theme

1. Determination of required currents and peak current on circuits

2. The calculation of parameters for power consumers

3. Sizing the lighting circuits

3.1 Sizing of the electrical circuit from the point of view of thermal stability of the load current

3.2 Checking the electrical circuit from the point of view of voltage falling

3.3 Sizing of protection disjunctors in case of short circuit

3.4 Checking the section conductors of the voltage drops

3.5 Sizing of installation for power factor compensation

4. Sizing of installation for lightning protection

5. Sizing of installation for earthing protection

6. Economic and technical calculation of project

Appendices

Appendics 1.1 The plan of industrial building

Appendics 1.2 The calculation of force parameters for power consumers

Appendics 1.3 Placing consumers inside the hall

Appendics 1.4 The Photometric calculation of lighting consumers

Appendics 1.5 The monophase diagram for power consumers

Appendics 1.6 The monophase diagram for lighting consumers


PROJECT THEME
It is asking to design electrical installations for an industrial building for metal confections containing
force and light consumers, and earth connection.
Also it is necessary to evaluate the total price for this work.
The force consumers are:

3 phases consumers
Type Nominal power [kW]
1. Welding transformer 12+(N/10)
2. Machine tools 4+(N/10)
3. Pneumatic transporter 4+(N/10)
4. Electric saw 1,5+(N/10)
5. Air fan 0,37+(N/10)
6. Welding table 1,5+(N/10)
7. Boring mill 0,75+(N/10)
8. Rectifier 0,25+(N/10)
9. Fan 0.75+(N/10)
10. Turret lathe 11+(N/10)
11. Machine tools 15+(N/10)
12. D.C.Motor for transportation belt 15+(N/10)
13. Synchronous motor 50+(N/10)
14. Machine tools 5+(N/10)
15. Air fan 10+(N/10)
16. Welding transformer 20+(N/10)
17. Machine tools 7+(N/10)
18. Air fan heather 5+(N/10)
19. Plasma cutting machine 25+(N/10)
20. Air fan 13+(N/10)

Single phase consumers


Name Nominal power [kW]
1. Socket circuit 2+(N/10)
2. Building and dependences lighting to be calculated

Building dimensions:
-long 30+ 0.5*N m
-width 12+0.5*N = m
-high 12+0.1*N = m
N is your order number from the laboratory catalog!

The plan of entire project is presented in Appendix 1.1 and includes the following rooms:

-Workshop
- Locker Room for women
- Locker Room for men
- Womens toilet
- Mens toilet
-Canteen
-Office
-Hol/Lobby

REFERENCES

1. Schneider S.R.L Electrical Installation Guide (available online) in Romanian language.

2. Moeller electrical book : available online: www.agenda-electrica.ro - in Romanian language.

3. Standard I7/2011 (available online) in Romanian language.

4. Cilinghir V.: Alimentarea cu energie electric a ntreprinderilor, vol I, Ed. Univ. Transilvania,
Braov, 2000 i vol II, 2002.

5. Pop, F., .a. ndrumar de proiectare a instalaiilor electrice de joas tensiune, Inst. Politehnic
Cluj-Napoca, 1987.

6. Nicolae Mirea: Instalaii electrice industriale Ed. Didactica si Pedagogica Bucuresti, 1988.

1. DETERMINATION OF REQUIRED CURRENTS


AND PEAK CURRENTS ON THE CIRCUITS