Pipe ID=1 AVERAGE FLOW


Pipe data: length=32.172m, diameter=175mm, C=100
Area,A =22/7*diameter2/4=0.0241m2
Hydraulic radius, R =Area/perimeter =0.044m
Flow, Q =Area*Velocity
=>Q/A =Velocity
Velocity,V =0.8492*C*R0.63S0.54(m/s)
=>Q/A =0.8492*C*R0.63S0.54
=>26.1014/0.02 =0.8492*100*0.0440.63S0.54/1000
=>S0.54 =26.1014/0.02*1/(0.8492*100*0.0440.63)/1000
=>S =0.011996m/m
Head loss, HL =S*L =0.011996*32.17
=0.385922m
Total Head loss, HL total =0.385922
Pipe Calculation
Pipe ID=1 PEAK FLOW
Pipe data: length=32.172m, diameter=175mm, C=100
Area,A =22/7*diameter2/4=0.0241m2
Hydraulic radius, R =Area/perimeter =0.044m
Flow, Q =Area*Velocity
=>Q/A =Velocity
Velocity,V =0.8492*C*R0.63S0.54(m/s)
=>Q/A =0.8492*C*R0.63S0.54
=>54.3779/0.02 =0.8492*100*0.0440.63S0.54/1000
=>S0.54 =54.3779/0.02*1/(0.8492*100*0.0440.63)/1000
=>S =0.046700m/m
Head loss, HL =S*L =0.046700*32.17
=1.502428m
Total Head loss, HL total =1.502428
Pipe Calculation
Pipe ID=2 AVERAGE FLOW
Pipe data: length=60.82m, diameter=175mm, C=100
Area,A =22/7*diameter2/4=0.0241m2
Hydraulic radius, R =Area/perimeter =0.044m
Flow, Q =Area*Velocity
=>Q/A =Velocity
Velocity,V =0.8492*C*R0.63S0.54(m/s)
=>Q/A =0.8492*C*R0.63S0.54
=>23.8100/0.02 =0.8492*100*0.0440.63S0.54/1000
=>S0.54 =23.8100/0.02*1/(0.8492*100*0.0440.63)/1000
=>S =0.010119m/m
Head loss, HL =S*L =0.010119*60.82
=0.615419m
Total Head loss, HL total =0.615419
Pipe Calculation
Pipe ID=2 PEAK FLOW
Pipe data: length=60.82m, diameter=175mm, C=100
Area,A =22/7*diameter2/4=0.0241m2
Hydraulic radius, R =Area/perimeter =0.044m
Flow, Q =Area*Velocity
=>Q/A =Velocity
Velocity,V =0.8492*C*R0.63S0.54(m/s)
=>Q/A =0.8492*C*R0.63S0.54
=>49.6042/0.02 =0.8492*100*0.0440.63S0.54/1000
=>S0.54 =49.6042/0.02*1/(0.8492*100*0.0440.63)/1000
=>S =0.039393m/m
Head loss, HL =S*L =0.039393*60.82
=2.395880m
Total Head loss, HL total =2.395880
Pipe Calculation
Pipe ID=3 AVERAGE FLOW
Pipe data: length=19.569m, diameter=175mm, C=100
Area,A =22/7*diameter2/4=0.0241m2
Hydraulic radius, R =Area/perimeter =0.044m
Flow, Q =Area*Velocity
=>Q/A =Velocity
Velocity,V =0.8492*C*R0.63S0.54(m/s)
=>Q/A =0.8492*C*R0.63S0.54
=>23.5600/0.02 =0.8492*100*0.0440.63S0.54/1000
=>S0.54 =23.5600/0.02*1/(0.8492*100*0.0440.63)/1000
=>S =0.009923m/m
Head loss, HL =S*L =0.009923*19.57
=0.194180m
Total Head loss, HL total =0.194180
Pipe Calculation
Pipe ID=3 PEAK FLOW
Pipe data: length=19.569m, diameter=175mm, C=100
Area,A =22/7*diameter2/4=0.0241m2
Hydraulic radius, R =Area/perimeter =0.044m
Flow, Q =Area*Velocity
=>Q/A =Velocity
Velocity,V =0.8492*C*R0.63S0.54(m/s)
=>Q/A =0.8492*C*R0.63S0.54
=>49.0834/0.02 =0.8492*100*0.0440.63S0.54/1000
=>S0.54 =49.0834/0.02*1/(0.8492*100*0.0440.63)/1000
=>S =0.038631m/m
Head loss, HL =S*L =0.038631*19.57
=0.755961m
Total Head loss, HL total =0.755961
Pipe Calculation
Pipe ID=4 AVERAGE FLOW
Pipe data: length=65.697m, diameter=150mm, C=100
Area,A =22/7*diameter2/4=0.0177m2
Hydraulic radius, R =Area/perimeter =0.038m
Flow, Q =Area*Velocity
=>Q/A =Velocity
Velocity,V =0.8492*C*R0.63S0.54(m/s)
=>Q/A =0.8492*C*R0.63S0.54
=>0.4166/0.02 =0.8492*100*0.0380.63S0.54/1000
=>S0.54 =0.4166/0.02*1/(0.8492*100*0.0380.63)/1000
=>S =0.000012m/m
Head loss, HL =S*L =0.000012*65.70
=0.000785m
Total Head loss, HL total =0.000785
Pipe Calculation
Pipe ID=4 PEAK FLOW
Pipe data: length=65.697m, diameter=150mm, C=100
Area,A =22/7*diameter2/4=0.0177m2
Hydraulic radius, R =Area/perimeter =0.038m
Flow, Q =Area*Velocity
=>Q/A =Velocity
Velocity,V =0.8492*C*R0.63S0.54(m/s)
=>Q/A =0.8492*C*R0.63S0.54
=>0.8680/0.02 =0.8492*100*0.0380.63S0.54/1000
=>S 0.54
=0.8680/0.02*1/(0.8492*100*0.0380.63)/1000
=>S =0.000000m/m
Head loss, HL =S*L =0.000000*65.70
=0.000000m
Total Head loss, HL total =0.000000
Pipe Calculation
Pipe ID=5 AVERAGE FLOW
Pipe data: length=86.767m, diameter=150mm, C=100
Area,A =22/7*diameter2/4=0.0177m2
Hydraulic radius, R =Area/perimeter =0.038m
Flow, Q =Area*Velocity
=>Q/A =Velocity
Velocity,V =0.8492*C*R0.63S0.54(m/s)
=>Q/A =0.8492*C*R0.63S0.54
=>1.2499/0.02 =0.8492*100*0.0380.63S0.54/1000
=>S0.54 =1.2499/0.02*1/(0.8492*100*0.0380.63)/1000
=>S =0.000091m/m
Head loss, HL =S*L =0.000091*86.77
=0.007931m
Total Head loss, HL total =0.007931
Pipe Calculation
Pipe ID=5 PEAK FLOW
Pipe data: length=86.767m, diameter=150mm, C=100
Area,A =22/7*diameter2/4=0.0177m2
Hydraulic radius, R =Area/perimeter =0.038m
Flow, Q =Area*Velocity
=>Q/A =Velocity
Velocity,V =0.8492*C*R0.63S0.54(m/s)
=>Q/A =0.8492*C*R0.63S0.54
=>2.6039/0.02 =0.8492*100*0.0380.63S0.54/1000
=>S0.54 =2.6039/0.02*1/(0.8492*100*0.0380.63)/1000
=>S =0.000000m/m
Head loss, HL =S*L =0.000000*86.77
=0.000000m
Total Head loss, HL total =0.000000
Pipe Calculation
Pipe ID=6 AVERAGE FLOW
Pipe data: length=91.26m, diameter=150mm, C=100
Area,A =22/7*diameter2/4=0.0177m2
Hydraulic radius, R =Area/perimeter =0.038m
Flow, Q =Area*Velocity
=>Q/A =Velocity
Velocity,V =0.8492*C*R0.63S0.54(m/s)
=>Q/A =0.8492*C*R0.63S0.54
=>0.6249/0.02 =0.8492*100*0.0380.63S0.54/1000
=>S 0.54
=0.6249/0.02*1/(0.8492*100*0.0380.63)/1000
=>S =0.000025m/m
Head loss, HL =S*L =0.000025*91.26
=0.002311m
Total Head loss, HL total =0.002311
Pipe Calculation
Pipe ID=6 PEAK FLOW
Pipe data: length=91.26m, diameter=150mm, C=100
Area,A =22/7*diameter2/4=0.0177m2
Hydraulic radius, R =Area/perimeter =0.038m
Flow, Q =Area*Velocity
=>Q/A =Velocity
Velocity,V =0.8492*C*R0.63S0.54(m/s)
=>Q/A =0.8492*C*R0.63S0.54
=>1.3019/0.02 =0.8492*100*0.0380.63S0.54/1000
=>S0.54 =1.3019/0.02*1/(0.8492*100*0.0380.63)/1000
=>S =0.000000m/m
Head loss, HL =S*L =0.000000*91.26
=0.000000m
Total Head loss, HL total =0.000000