Escolar Documentos
Profissional Documentos
Cultura Documentos
Material: Substance or commodity that is bought or sold or consumed for production is called material.
Material Master: It is central source for data on material. It contain information on all the materials that
a company produces or procures, store or sells. Every area of responsibility can have a material master
view, so each department has its own view. Eg MRP, Sales, Purchasing, Costing.
Material type : materials having same basic attributes are grouped together and assigned to a material
type. This allow us to manage different material in uniform manner according to company requirement.
Eg Raw material, packing material, semi finished, finished.
Plant Level:
Entry Aids for Material Master :
1:
2.
3.
Exexute
6:
For period specific go to intervals and shift. Eg for march we want to work more.
Click on Insert intervals
Changed to 9 hours for march month:
For Pooled capacity: CR11
Save it.
Timing changed to 9 hours from 8 hours.
Work center reporting:
CR05
Routing: CA01
Click on Operations:
SAVE it.
To see operation data.
Define Profile with Default values.
Go back and save it.
Go to
Click MatAssignment and add our new FG.
Save it, it will get extended to our FG. Only Components Allocation wont get copied.
Group Routing:
Scroll down.
Select any custom field as desired. If we remove the value from the Field Key,custom field will also go
CA10:
CA80