Project : Design & Build of Light Industrial and Logistics Units at Um Alhoul Special Economic Zone
Contract No. : Contract EZ03-CW03-CON-16
Purpose : HSE Coordination Meeting #2
Venue : QBEC Meeting Room
Date : 26 November 2017 Time: 11:30 AM - 12:15 PM
Distribution : MANATEQ/EGIS/QBEC
Reference : EZ03-CW03-MOM-QBEC-HSE-000002
Attendees:
Company Name Job title Attendance
QBEC Engr. Samer Housni PM Present
QBEC O. Balakrishnan HSEM Present
QBEC Ibrahim Hussein CM Present
QBEC Aravindgosh DHSEM Present
QBEC Amal Sarath HSEE Present
QBEC Vernie Candelaria Environmental Engineer Present
QBEC Kareem Site Engineer Present
QBEC Shahul Hameed Electrical Engineer Present
QBEC Tanweerul Haque HSEO Present
QBEC Saju Xavier HSEO Present
QBEC Nagesh Bhore Male Nurse Present
QBEC Hossam Hassan Surveyor Present
QBEC Hassan Surveyor Present
QBEC Sijo Joseph Saffolding Supervisor Present
QBEC Raja Asif Electrical Foreman Present
QBEC Rajkumar Sharma Carpentry Foreman Present
Minutes of meeting: Please revert to author with any comments within 48 hours from the date of issue.
After this period, the meeting minutes shall be considered as accepted and regarded as the true/accurate
record of matters discussed.
Ref Action
Topic & Description Planned date Status
No by
HSE Managers Welcome Note -
QBEC HSE Manager welcomes all attendees to the second
1 Info --
HSE co ordination meeting.
Driptrays
Driptrays are to be provided for all towerlights and for all the
3.2 chemicals containers used in the site. QBEC has to provide QBEC
adequate number of driptrays to meet the requirements
Towerlight maintenance
Many towerlights in the site was observed with damaged
3.3 QBEC
junction box, control panels, improper connections. It is required
to arrange proper maintenance of towerlights.
Electrical Inspection
There electrical powertools used in the site needs to inspected
3.4 quarterly , and a competent inspector is required for this job. QBEC
Electrical Engineer Shahul Hameed shall follow up and conduct
the quarterly inspection .
PPE
Workers are found to be working with no proper PPEs in the
3.5 site. There was availability issues regarding the PPEs before, QBEC
but now the PPEs are available and QBEC needs to take strict
action against workers who are reluctant to comply.
Fuel tank without cover
Fuel tank of the towerlight kept open without cover. This could
lead to serious fire in the site. Therefore its necessary to provide
3.6 QBEC
cap for fuel tank , QBEC has to take action inorder to replace
the cover and to ensure that the cover is always with the
towerlight
Poor housekeeping
Housekeeping has to be ensured in sites at all times . Its
3.7 advised by Senior PM that there should be one hour allotted to QBEC
housekeeping each day.
Rebar caps
Rebars without caps has been observed widely in the site. The
3.8 survey team needs to take special care to provide rebar caps QBEC
while they erect rebars for level.
Rebar caps are now available in the store.
Toilet doors
QBEC
Damaged handles of toilets in the site was observed. This has
3.9 caused the personnel on site to use toilet without locking the
door. It is required rectify the door lock as soon as possible.
Sleeping on ground
Workers found Sleeping on the ground during lunch break at
QBEC site office, there is no adequate rest area at site office
3.10 and site as the number of workers are increasing day by day. QBEC
The rest area is being arranged in QBEC office area under the
supervision of Foreman Sharma.
Smoking Area
Designated smoking area separate for staff and workers is
required in QBEC office to avoid personnel smoking inside office
or in undesignated area.
3.13 QBEC
It is required that the personnels in the higher management
shows example to others by smoking only in the designated
smoking area.
Ground Condition
QBEC office area requires to be laid with milling materials to
tackle the clay type ground conditions during rain and control
3.15
the dust in office area.
The purchase of milling material is on process.
Inspection Report
4
Concrete Pump
Proper barrication needs to be ensured around the concrete
4.1
pump area to avoid unauthorized personnels and vehicles
moving into area nearby concrete pump.
Waste Management
Proper and timely removal of wastes from sites needs to be
ensured. Waste accumulating in the site is completely
4.2 unacceptable.
As per the procedure , the wastes from waste bin is removed
along with black plastic cover and these covers are collected by
boom truck. Timely Removal of waste must be ensured.
4.3 Banksman
The equipment operation shall be done along with banksman.
Minutes by: Amal Sarath. HSEE, QBEC Reviewed by: O. Balakrishnan , HSEM