Procedure
This tutorial identifies the soil
structure interaction by analyzing
construction stage of 3D tunnel
excavation and comparing differential
settlement of adjacent building.
3D Terrain Generation
Import Topographic DXF file and combine with bore hole strata information 3
Export DXF from AUTOCAD GTS NX
1. Set coordinates
to origin (0,0,0)
2. All Polylines
3. Save as DXF
4
Import Terrain DXF GTS NX
1. Set model to 3D
2. Import DXF 3D
3. Select Boring
DXF file
5
Import Strata Data GTS NX
6
Import Topography GTS NX
7
Create 3D Terrain Geometry GTS NX
8
Export 3D Terrain to AUTOCAD GTS NX
Training
Course
9
Training Course Part 2 GTS NX
1. Geometry Translate
2. Move tunnel 30 m down
3. Preview. Apply
Create 2D face GTS NX
1. Import Property
from part 2 file
2. Inspect Materials
Tunnel Concrete Max
Yield Stress
7500kN/m^2
18
Mesh structures GTS NX
19
Mesh soil layers GTS NX
1. Mesh Top Soil Layer
Size: 10m Property: Top Soil
2. Mesh 2nd Soil Layer
Size: 10m Property: Mid Soil
3. Mesh 3rd Soil Layer
Size: 10m Property: Bot Soil
4. Mesh 4th Soil Layer
Size: 10m Property: Soft Rock
20
Apply boundary GTS NX
21
Import building loads from excel GTS NX
22
Create Analysis Case GTS NX
23
Inspect results GTS NX
1. Results >
Displacement >
Total Translation
Use Clipping Plane
2. Deactivate all sets
except tunnels
24
Inspect results GTS NX
25
Training Course Part 3 GTS NX
27
Import terrain geometry GTS NX
28
Import materials GTS NX
1. Import Property
from GTS NX Steel
Structure with soil
and tunnel final
2. Inspect Materials
29
Mesh structures GTS NX
31
Extract tunnel walls GTS NX
32
Mesh piles GTS NX
33
Apply boundary conditions GTS NX
34
Create Construction Stages GTS NX
1. Static / Slope
Analysis >
Construction Stage >
Stage Set
2. Stress > Add >
Define CS
3. Stage 1: Initial
Activate only Soil Layers,
gravity and BC
- Clear Displacements
Save > New
35
Create Construction Stages GTS NX
1. Stage 2: Foundation
Activate foundation and
building sets and BC
Save > New
36
Create Construction Stages GTS NX
1. Stage 3: Exca 1
Deactivate Tunnel
Excavation 1
Save > New
2. Stage 4: Exca 2
Activate Tunnel Wall 1
Deactivate Tunnel
Excavation 2
Save > New
37
Create Construction Stages GTS NX
1. Stage 5: Exca 3
Activate Tunnel Wall 2
Deactivate Tunnel
Excavation 3
Save > New
2. Stage 6: Exca 4
Activate Tunnel Wall 3
Deactivate Tunnel
Excavation 4
Save > New
38
Create Construction Stages GTS NX
1. Stage 7: Exca 5
Activate Tunnel Wall 4
Deactivate Tunnel
Excavation 5
Save > New
2. Stage 8: Exca 6
Activate Tunnel Wall 5&6
Deactivate Tunnel
Excavation 6
Save > Close
39
Create Construction Stages GTS NX
2. Go to stage 2,
modify case by
removing piles
40
Create Analysis Cases GTS NX
41
Run Analysis GTS NX
1. Perform Analysis on
both cases.
42
Inspect Results GTS NX
1. Check Total
Translation for case
with No Piles
2. Compare to Case
with Piles
43
Inspect Results GTS NX
44
Inspect Results GTS NX
2. Check Moments Y
45
Export Results GTS NX
46
GTS NX
END
47