Você está na página 1de 2

16'-9" 10'-9" 16'-9"

412" 41 2" 41 2" 412"


1'-112" 1
1'-1 2" 1'-112" 1
1'-1 2"

412"
1'-112"

18'-9"
1'-112"
412" 41 2" 41 2" 412"
1'-112" 1
1'-1 2" 1'-112" 1
1'-1 2"

412"
2'-41 2"

5'-0"

10'-9"
41 2" 412"
1'-112" 1'-112"

412"
412"
1'-11 2"

1'-112"
1

8'-0"
4 2"
1'-112" 1'-11 2"
412"

11'-9"
412" 41 2" 41 2" 412"
1'-112" 1
1'-1 2" 1'-112" 1
1'-1 2"

412"
1'-112"

20'-9"
1'-112"

1'-112" 1'-11 2" 1'-112" 1'-11 2"


41 2"

412" 41 2" 412"


11'-9"

1'-112" 1'-11 2"


41 2"

1'-112"
1'-112"

8'-0"

412"
412"

1'-112" 1'-112"
412"

412"
10'-9"

2'-41 2"
5'-0"

1'-112" 1'-11 2" 1'-112"


41 2"

1'-112"
1'-112"

412" 41 2" 412"


18'-9"
1'-712"

1'-112"

1'-112" 1'-11 2" 1'-112" 1'-112"


41 2"

41 2"

412" 41 2" 412"


Assignment No. 5

1. Design Mat foundation for given drawings with following description:

Left edge distance /Right edge distance/top edge distance /bottom edge distance = 3ft

Dead Load for each column = (190+R) k, Live Load for each Column= (210+R) k (R= Student Reg. No.)

Assume footing thickness as 2ft and check against punching

Calculate Total Quantities i.e. Concrete + Steel

Calculate No. of Steel Bars (Use #6 for Bottom and #5 for Top Bars)