WEEK 4

Training Day 1 Accomplishment Summary


Date July 3, 2017
Discussed and explained
Training Location / Site Brgy. Highway Hills, Mayflower the general notes on
Description of Daily Training
St. Mandaluyong City masonry and concrete
Activity
blocks
Observed the site

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Supervisor Engr. Jo Anne F. Ferrancullo

Duration 7:30am-11:30am Number of Hours 4 hours

In my first day, I arrived 7:11 a.m. on construction site. Our project manager called as a Junior Civil Engineer.
I attended the toolbox together with my co OJTs on the site. Toolbox are conducted every morning to
addressed all the concerns of the project manager, safety officers, staffs, and construction workers are
addressed and they have morning exercises so that they have energy to do their work.

After the toolbox, my supervisor Engr. Jo Anne Ferrancullo oriented us what Quality Control Department tasks
Details of Training Activity on the site. She discussed and explained to us the general notes on masonry and concrete blocks. The notes
contents are the tables for wall reinforcement and the placement of the lintel beams. She elaborated to us
where we can apply the contents of the notes on the site.

After she finished the discussion, I asked her if what is my assigned task for that day, she just told me to
observe the site first and be familiarize with the units of each floor.
Pictures of Evidences

Detailed general notes on masonry and concrete blocks Observing the site of Tower 1
Training Day 2 Accomplishment Summary
Date July 4, 2017
Punch list for beams and
Training Location / Site Brgy. Highway Hills, Mayflower columns of Tower 1 10th
St. Mandaluyong City Description of Daily Training floor
Activity Took pictures for the
punch list of Tower 1 10th
floor

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Supervisor Engr. Jo Anne F. Ferrancullo

Duration 7:30am-4:30pm Number of Hours 8 hours

In my second day on construction site, my supervisor Engr. Jo Anne Ferrancullo assigned me to punch list
Tower 1 10th floor. She gave me the floor plan of 10th floor and told me to punch list the beams and columns
if it is unrectified, wavy corner, or there is crack. I have punch list from unit 1 up to unit 40.

After I identified and noted all the problems from all the units that needs to be fix or complete I gave the all the
data to my supervisor and observed the workers on how they place the concrete hollow blocks and the
Details of Training Activity reinforcing bars.

After break time, my supervisor told me to take pictures of the punch list I noted on the key plan. I took pictures
of the punch list of the beams and columns and emailed all the pictures to my supervisor as arrived home.
Pictures of Evidences

Photo for punch list of the column Noting the punch list for beams and columns
Training Day 3 Accomplishment Summary
Date July 5, 2017
Monitored and checked
Training Location / Site Brgy. Highway Hills, Mayflower Description of Daily Training
the zocalo and CHB
St. Mandaluyong City Activity

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Supervisor Engr. Jo Anne F. Ferrancullo

Duration 7:30am-3:30pm Number of Hours 7 hours

In my third day on construction site, my supervisor Engr. Jo Anne Ferrancullo assigned me to monitored and
checked the zocalo and concrete hollow block (CHB) of Tower 1 11th floor to 19th floor. I asked my supervisor
what zocalo is, and she told me that it is a concrete without hollow blocks and can founded in the toilet and
bathroom and its height from the floor is 0.3m.

I highlighted the units with finish CHB and zocalo for every unit and those on going. I have monitored the
Details of Training Activity correct spacing of the reinforcing bars on the CHB. After I am done doing it, I have submitted it to my
supervisor.
Pictures of Evidences

Monitoring and Checking the zocalo and CHB of Toilet Picture of zocalo of Toilet and Bathroom
and Bathroom
Training Day 4 Accomplishment Summary
Date July 7, 2017
Compiled and sort the
Training Location / Site Brgy. Highway Hills, Mayflower punch list for Tower 1 8th
St. Mandaluyong City floor unit 24-40
Description of Daily Training
Compiled and sort the
Activity
punch list for Tower 2 8th
floor unit 1-40

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Supervisor Engr. Jo Anne F. Ferrancullo

Duration 7:30am-3:30pm Number of Hours 7 hours

In my fourth day on construction site, I was assigned to compiled and sort all the punch list of 8th floor of tower
1 and 2. I sorted and compiled the punch list for masonry, skynet (water line, sewage), and harmonics
(electrical line and outlets). I started compiling the harmonics, which has a lot of punch list both tower 1 and 2
and last is the skynet, which has a less punch list compared to harmonics.

I have identified the rough finished, unrectified wall, and exposed pipes. After I compiled and sort I have printed
Details of Training Activity and submitted it to my supervisor.
Pictures of Evidences

Sorting and compiling the punch list for harmonics Sorting and compiling the punch list for skynet
WEEK 5
Training Day 5 Accomplishment Summary
Date July 10, 2017
Monitored, checked, and
updated the
Training Location / Site Brgy. Highway Hills, Mayflower Description of Daily Training accomplishments for
St. Mandaluyong City Activity concrete hollow blocks,
skim coat and plastered
wall of 10th, 11th, 15th, and
16th of Tower 1

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Supervisor Engr. Jo Anne F. Ferrancullo

Duration 7:30am-11:30am Number of Hours 4 hours

In my fifth day on the site, my supervisor taught me on how to make an accomplishment report for concrete
hollow blocks, skim coat and plaster in all unit. She assigned me to monitor, check, and update the
accomplishments in all units of Tower 10th, 11th, 15th, and 16th. She explained and showed to me the difference
between a skim coat and a plaster. Plaster is a soft mixture of lime with sand or cement and water for
spreading on walls, ceilings, or other structures to form a smooth hard surface when dried, while skim coat is
a thin coat of joint compound that you can use to repair or smooth damaged walls and it applied after the
Details of Training Activity plaster.

Before skim coat is applied, the wall and the ceiling should be smooth and does not have a balance of work.
Based on my monitoring of the four floors in Tower 1, 10th floor has the most accomplished unit compared to
other floor that we have monitored.
Pictures of Evidences

Monitoring, checking, and updating the accomplishments Picture of skim coat of wall
for CHB, zocalo, plastered wall, and skim coat

Picture of plastered wall


Training Day 6 Accomplishment Summary
Date July 11, 2017
Installed the reinforcing
bars on toilet and
Training Location / Site Brgy. Highway Hills, Mayflower Description of Daily Training bathroom
St. Mandaluyong City Activity Compiled and sorted the
punch list of 12th floor
Tower 1 for harmonics

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Supervisor Engr. Jo Anne F. Ferrancullo

Duration 7:30am-6:30pm Number of Hours 10 hours

In my sixth day on the site, my supervisor and I went to 11th floor of Tower 1 where the installation of steel
bars reinforcing bars started after completing the installation in 10th floor. She told me that the hole should be
10 cm deep and 40 cm distance from other reinforcing bars horizontally. The reinforcing bars placed on the
corners and on the intersections should be 16 mm diameter while 10 mm diameter reinforcing bars used after
the 16 mm diameter. Before they drilled a hole by using an auger, they are required to clean the area so that
the epoxy they are going to place at the end part of the reinforcing bars will stick at the hole.
Details of Training Activity
After lunch break, my supervisor told me that I have a new task for that day since I will be staying 8 hours on
the site. She told me to compile and sort the punch list for 12th floor of tower 1 for harmonics. I only punch list
the harmonics since it has a lot of balance of work especially the outlets, and I categorized the balance of their
work as unrectified wall. We categorized it as unrectified wall since they did not fix the plastering of their
electrical pipes and outlets.
Pictures of Evidences

Proper spacing of reinforcing bars on toilet and bathroom Putting epoxy on the end part of the reinforcing bars

Sample picture of punch list for harmonics


Training Day 7 Accomplishment Summary
Date July 12, 2017
Updated the monitoring of
the accomplishments of
Training Location / Site Brgy. Highway Hills, Mayflower Description of Daily Training works for zocalo, concrete
St. Mandaluyong City Activity hollow blocks, and plaster
of 8th, 11th, 12th, 14th, and
15th floor of Tower 1

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Supervisor Engr. Jo Anne F. Ferrancullo

Duration 7:30am-3:00pm Number of Hours 6.5 hours

In my seventh day, my supervisor assigned me to update the monitoring of the accomplishments of Tower 1
8th, 11th, 14th, and 15th floor. We have highlighted the units with accomplishments for zocalo, concrete hollow
blocks, and plaster in the key plan for every unit of that floor level. After we have monitored the unit 1- 40 we
repeated checking it just to make sure that we make it right. These balances are been computed for the billing
with the other contractors of the fame residences project.

Details of Training Activity After lunch break, I assigned to compile and sort the punch list for 12th floor of Tower 1 unit 1-40 for masonry.
In this floor, I have observed that it has a lot of punch list compared to 8 th floor especially on the masonry.
After I compiled it, I saved it to my supervisors flash drive and told her to double check the caption that I put
on below the picture of every unit.
Pictures of Evidences

Highlighting the accomplished zocalo for toilet and bathroom Updating the key plan of accomplished works
Training Day 8 Accomplishment Summary
Date July 13, 2017
Compiled and sorted the
Training Location / Site Brgy. Highway Hills, Mayflower Description of Daily Training punch list of Tower 1 unit
St. Mandaluyong City Activity 1-40 in 14th floor for
harmonics

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Supervisor

Duration 7:30am-3:00pm Number of Hours 6.5 hours

In my eight day on the site, my supervisor assigned me to punch list of Tower 1 for harmonics. While sorting
the pictures for punch list, I have noticed that 14 th floor has a lot of punch list on electrical works so I told my
supervisor about this. I have marked the area where there are a balanced of work. I have a remarked for each
unit and arranged it in chronological order.

After I have compiled and sorted the punch list for harmonics, Ive noted which units has a lot of punch list in
Details of Training Activity 14th floor. I have printed it and gave it to my supervisor and wrote my accomplishment report for that day
because we are required to make it before leaving the site and it should be sign by the project manager and
my supervisor.
Pictures of Evidences

Sample of punch list for harmonics Sample of expose pipes of electrical works
Training Day 9 Accomplishment Summary
Date July 14, 2017
Measured and computed
the area of
Training Location / Site Brgy. Highway Hills, Mayflower Description of Daily Training accomplishments for
St. Mandaluyong City Activity zocalo, concrete hollow
blocks, plastered wall, and
skim coat of Tower 1
7th -14th floor in all units

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-3:00pm Number of Hours 6.5 hours

In my ninth day on the site, my supervisor doesnt have any task for me on that day. When the engineering
department heard about it they asked permission to my supervisor if I can help them to compute for the area
of the accomplishments. She did not hesitate and I was very happy because I will have a task on that day that
I can write on my accomplishment report. First, we went to 14 th floor which is the higher floor that we need to
measure those accomplishments.

Details of Training Activity We have measured first the accomplished zocalo, followed by the concrete hollow blocks, plastered wall, and
last is the skim coat. Most of the units has the same area of concrete hollow blocks and plastered wall. After
we measured all the units of the floors we have recorded all the measurements of height and width of the
accomplishments in every unit and went back to the office. After we have computed for the area we gave it to
Engr. Mitch to recheck our computations.
Pictures of Evidences

Computing the area of accomplished works Measuring the accomplished work of zocalo
WEEK 6
Training Day 10 Accomplishment Summary
Date July 17, 2017

Description of Daily Training Took pictures, compiled,


Training Location / Site Brgy. Highway Hills, Mayflower Activity and sorted for the punch
St. Mandaluyong City list of tower 1 15th floor

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-11:30am Number of Hours 4 hours

In my tenth day on construction site, I was assigned to took pictures, compiled and sorted all the punch list of
15th floor of tower 1. I have taken pictures of the balance in plastering of the electrical works like the outlet,
the main circuit and its pipes. I also took the punch list for unrectified wall, rough finish, and wavy corner in
every unit. As I took picture, I am listing how many pictures in every unit I took.

After I took pictures for the punch list, I rename the picture I have taken in every unit on the desktop and
Details of Training Activity proceeded to the compiling, and sorting of pictures for each unit. I leaved a space below after each picture so
that there is a space to write down the problem on that picture. After that, I save it on a flash drive and gave it
to my supervisor.
Pictures of Evidences

Noting how many pictures take per unit Taking pictures for the punch list tower 1 15th floor
Training Day 11 Accomplishment Summary
Date July 18, 2017
Monitored, checked, and
updated the
Training Location / Site Brgy. Highway Hills, Mayflower accomplishments of the
St. Mandaluyong City Description of Daily Training skim coat on ceiling and
Activity on wall from 7th 20th floor
of tower 1
Punch list for beams,
columns, and ceiling of
tower 1 11th 14th floor

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Engr. Jo Anne F. Ferrancullo


Name and Signature of
Supervisor
Duration 7:30am-6:30pm Number of Hours 10 hours

On my eleventh day on the site, my supervisor told me to monitor, check, and update the accomplishments
of the skim coat on ceiling and wall. I highlighted the unit with un update with a green highlighter so that she
can easily recognize which unit has an update on the skim coat of wall and ceiling. I started updating on 20th
floor, I went to that floor level by riding a improvise elevator which they called it alimak, because it is easy to
go down compared from going up. Most of the floors I have monitored, checked, and updated have many
accomplishments on skim coat.
Details of Training Activity
In the afternoon, I have submitted the key plan with an updates and after it she told me to punch list 11th floor
to 14th floor of tower 1. She also told me that I only needed to punch list the beam, column, and ceiling. I
have noticed that most of the units are rough finish and unrectified. I also noticed that the column and ceiling
needed to be rectify and smoothened. After it, I gave my key plan with a punch list of 11th to 14th floor to my
supervisor.
Pictures of Evidences

Punch list for beams, columns, and ceiling of tower 1 11th 14th floor Monitoring, checking, and updating the accomplishments of the skim
coat on ceiling and on wall from 7th 20th floor of tower 1
Training Day 12 Accomplishment Summary
Date July 20, 2017
Updated, monitored,
checked and measured
the accomplishments of
Training Location / Site Brgy. Highway Hills, Mayflower the concrete hollow
Description of Daily Training
St. Mandaluyong City blocks, plastered wall,
Activity
skim coat, rebar installed,
and stiffener column in
14th floor and 15th floor of
tower 1

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-3:00pm Number of Hours 6.5 hours

On the twelfth day on the site, my supervisor told me update, monitor, check and measure the
accomplishments of the concrete hollow blocks, plastered wall, skim coat, rebar installed, and stiffener column
in 14th floor and 15th floor of tower 1. We only measured the accomplished part of the wall. We have listed
all the measurements on the table given by our supervisor.

I have learned what is the use of a stiffener column, because I asked my supervisor why they are putting an
Details of Training Activity stiffener column on partitioned walls. She told me that stiffener column are used as a means of providing
additional support to columns at beam connection locations. They are added when the strength of the column
is exceeded but full moment strength of the beam section is desired. She also showed me what a stiffener
column looks like. After we finished measuring the accomplishments, we went to the office to rewrite it on a
clean sheet of paper with a table drawn.
Pictures of Evidences

Measured the accomplishments of the concrete hollow blocks, Updating, monitoring, checking the accomplishments of the concrete
plastered wall, skim coat, rebar installed, and stiffener column hollow blocks, plastered wall, skim coat, rebar installed, and stiffener
WEEK 7
Training Day 13 Accomplishment Summary
Date July 24, 2017

Description of Daily Training Measured the stairs with


Training Location / Site Brgy. Highway Hills, Mayflower Activity and without nosing on fire
St. Mandaluyong City exits of tower 1

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-6:30pm Number of Hours 10 hours

In my thirteenth day on construction site, our supervisor told us to measure the nosing of the stairs. She told
us that the nosing of the stairs measures 1350 mm length. We have started measuring the nosing on the
ground floor up to 27th floor of tower 1. We have listed all the measurements in a clean sheet of bond paper.
We have noticed that some of the nosing had a big difference in measurement compared to the exact
measurement that is on the plan. We have started measuring the stair 1 near EDSA and then the stair 2,
which is near the elevator area.
Details of Training Activity
Due to President Rodrigo Dutertes state of the nation address, classes are suspended in Quezon City. We
took this opportunity to maximize our free time on the site. After lunch, we have continued measuring the
nosing. We also noticed that in the stair 1 they only finished placing nosing from ground floor up to 7 th floor,
while in the stair 2 they finished placing nosing from ground floor up to 5 th floor. After we have measured all
the nosing and the stairs we have rewrote all the measurement for our supervisor to be able to read it easily.
Pictures of Evidences

Measuring the nosing of the stairs Measurements of the with and without nosing of the stairs
Training Day 14 Accomplishment Summary
Date July 25, 2017

Checked the units that are


Description of Daily Training
Training Location / Site Brgy. Highway Hills, Mayflower ready for handover
Activity
St. Mandaluyong City Measured the stairs of
tower 2

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-5:30pm Number of Hours 9 hours

In my fourteenth day on construction site, our supervisor told us to check the units that are available for
handovers from 8th floor up to 15th floor of tower 1 and 2. We have noted the rectification of JJTAN, rectification
of MEPFS, minor balance and cleaning. We have listed the units which have a balance of work that can be
fixed and finished on one day of working.

After lunch, we have a new tasked. Our supervisor told us to measure the nosing of the 2 nd, 3rd, and 5th floor
Details of Training Activity of tower 2. We have listed all the measurements we have gathered and after that, we went back to the office
to write all the measurements in a clean sheet of paper. We have noticed that the measurements of the stairs
on tower 2 are close to the original measurement of the length of the stairs compared to the measurement in
tower 1.
Pictures of Evidences

Listing the balance of work for each unit Checking the units that are ready for handover
Training Day 15 Accomplishment Summary
Date July 26, 2017

Counted the number of


Training Location / Site Brgy. Highway Hills, Mayflower steps of the stairs before
St. Mandaluyong City Description of Daily Training the landing area of a 4 fire
Activity exits
Measured the landing
area of the stairs on 16th-
18th floor

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-3:00pm Number of Hours 6.5 hours

In my fifteenth day on construction site, our supervisor told us to count the number of steps before the landing
area. We have wrote it in a clean sheet of paper, which have printed measurements of the nosing of the stairs.
We also noticed that the number of steps of the stairs before landing are the same from 8 th floor to 27th floor.
The stairs from ground floor to second floor had 34 steps, which is many compared to the other floors of that
building.

Details of Training Activity After we have finished counting the steps, we measured the landing area of the stairs. It is the area between
the stairs going up and going down. After we measured it, we gave the measurements to our supervisor.
Pictures of Evidences

Listed the number of steps before the landing area A plan for stairs with measurements
Training Day 16 Accomplishment Summary
Date July 28, 2017

Measured and computed


Description of Daily Training
Training Location / Site Brgy. Highway Hills, Mayflower the area of the balance of
Activity
St. Mandaluyong City work for concrete hollow
blocks and plaster

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-4:30pm Number of Hours 8 hours

In my sixteenth day on construction site, our supervisor told us to measure the balance of work for concrete
hollow blocks and plaster for all units of tower 1 11 th floor. We have also measured the balance of work on
lintel beam. We have noted the unit with no accomplishments on toilet and bathroom. After we got those
measurements for balance of work, we went to the office to compute for the area.

All of the measurements for example the length and height of the balance of the work are being wrote in a
Details of Training Activity table form format. After it, we compute for the area by just multiplying the length to the width. After we
computed for the area, we add all the balance of work for concrete hollow blocks and separate computation
for the total balance of work for plaster.
Pictures of Evidences

Measuring the balance of work for plastering of toilet and bath Measuring the area for balance of work
WEEK 8
Training Day 17 Accomplishment Summary
Date July 31, 2017

Measured the nosing of


Description of Daily Training
Training Location / Site Brgy. Highway Hills, Mayflower the kitchen for tower 1 8th-
Activity
St. Mandaluyong City 10th floor

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-11:30pm Number of Hours 4 hours

In my seventeenth day on construction site, our supervisor told us to measure the nosing of the kitchen. The
right measurement of the nosing is 1800mm for partition wall without column and 1650 for partition wall with
column based on the plan approved. We have measured the nosing for every unit of each floor we are required
to measure and noted the units with a big difference in measurement based on the plan. We have listed all
the data and after it, we gave it to our supervisor.

Details of Training Activity


Pictures of Evidences

Measured the nosing of the kitchen Listed the nosing of the kitchen of all units per floor level
Training Day 18 Accomplishment Summary
Date August 1, 2017

Measured and computed


Training Location / Site Brgy. Highway Hills, Mayflower Description of Daily Training the area of balanced of
St. Mandaluyong City Activity work for tower 1 15th floor
in unit 32-33

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-11:30pm Number of Hours 4 hours

In my eighteenth day on construction site, our supervisor told me to measure the area of balance of work in
unit 32-33 of 15th floor tower 1. The area of balance of work of these units are been computed for the billing
of the units. These units are been assigned to LAVSCOR a subcontractor of JJTAN on the 15th floor of tower
1. After I have measured all the balanced of work for plaster, concrete hollow blocks, and lintel beam, I went
to the office to computed for the area.

Details of Training Activity


Pictures of Evidences

Highlighted the units which are required to computed for the Computed the balanced of work of the two units
balanced of work
Training Day 19 Accomplishment Summary
Date August 2, 2017

Monitored and updated


the units with reinforcing
Training Location / Site Brgy. Highway Hills, Mayflower steel bars, zocalo,
Description of Daily Training
St. Mandaluyong City concrete hollow blocks,
Activity
and plaster in tower 2 16th-
19th floor
Supervised the laborers
and mason in tower 1 19th
floor

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-4:00pm Number of Hours 7.5 hours

In my nineteenth day on construction site, our supervisor told me to monitor and update the accomplishments
in tower 2 16th-19th floor. I have monitored and updated all the units, which have an accomplished work for
that day. I have highlighted the units that have an accomplished for reinforcing steel bars, zocalo, concrete
hollow blocks, and plaster.

After it, I supervised the laborers and mason done their masonry works. Some of them are been placed
Details of Training Activity concrete hollow blocks in the partition wall and in the toilet and bath, some of them plastered the wall, and
others are mixed the cement, and sand for plastering purposes.
Pictures of Evidences

Monitored and updated the accomplishments in 16th-19th floor of Supervised the mason and laborers in 19th floor of tower 1
Tower 2
Training Day 20 Accomplishment Summary
Date August 3, 2017

Listed the names of the


Training Location / Site Brgy. Highway Hills, Mayflower mason who worked in
St. Mandaluyong City each unit in 8th, 11th, and
Description of Daily Training 12th floor of tower 1
Activity Supervised the laborers
and mason in their
masonry works in 19th
floor of tower 1

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-2:00pm Number of Hours 5.5 hours

In my twentieth day on construction site, Engr. Abe Almalves the project manager of JJTAN told us to list the
names of the masons who worked in every unit of 8 th, 11th, and 12th floor of tower 1. We listed if they are
belong to the subcontractor group or in an admin group. We indicated on the list the date they have started to
work in the unit. We also wrote on the plastered wall the last name on the foreman they are belong with.

After lunch, my supervisor told me to supervise the laborers and mason in 19th floor of tower 1. I have checked
Details of Training Activity the reinforcing steel bars if they are been put the epoxy at the end part of it. I also watched the workers who
used the shotcrete machine to place concrete on the wall. Shotcrete is concrete (or sometimes mortar)
conveyed through a hose and pneumatically projected at high velocity onto a surface, as a construction
technique. In the 19th floor they did not used concrete hollow blacks, they purely used shotcrete to placed
concrete to make a partition walls, and even in the toilet and bath area.
Pictures of Evidences

Listed the names of the mason who worked on every unit Supervised the workers on 19th floor who used the shotcrete
machine
Training Day 21 Accomplishment Summary
Date August 4, 2017

Listed the number of


Training Location / Site Brgy. Highway Hills, Mayflower workers in 15th floor of
St. Mandaluyong City tower 1
Description of Daily Training
Updated and monitored
Activity
the accomplishments for
zocalo, concrete hollow
blocks, plaster in 7th-14th
floor of tower 1

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-3:00pm Number of Hours 6.5 hours

In my twenty-first day on construction site, the project manager told me to list all the names of the workers
who worked on 15th floor, and listed if they belong to subcontractor group or an admin group. We have totaled
the number of masons, and laborers on that floor level. We also listed how many mason and laborers working
in every unit in order to know if they need to transfer other workers in other unit that need to accomplish. Engr.
Abe told us that it every unit should have a maximum of 1 mason and 1 labor if they need to finished a few
balanced of work.
Details of Training Activity
After lunch, I updated and monitored the accomplishments for zocalo, concrete hollow blocks, and plaster in
tower 1 7th-14th floor. I noted the units with many accomplished works for every floor level of tower 1. After it,
I gave it to my supervisor.
Pictures of Evidences

Listed the number of workers in 15th floor of tower 1 Updated the accomplishments of concrete hollow blocks, plaster
and zocalo in 7th-14th floor of tower 1
WEEK 9
Training Day 22 Accomplishment Summary
Date August 7, 2017

Measured the elevation


Description of Daily Training
Training Location / Site Brgy. Highway Hills, Mayflower and nosing of the stairs of
Activity
St. Mandaluyong City stair 7 and 8

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-11:30am Number of Hours 4 hours

In my twenty-second day on construction site, my supervisor told us to measure the nosing and elevation of
the stairs. The elevation of the stairs should be 1000mm. Some of the elevation of the stairs we have measured
matched with the given measurement while other stairs measurement have a little difference with the given
measurement of an elevation. We have listed all the measurements for elevation and separated the
measurement for the nosing of the stairs.

Details of Training Activity When we measured the stair 7 and 8, it does not have a nosing yet. They started to install a nosing on stair
1, 2, 3, and 4, which are fire exits of tower 1 and 2. The stairs of 5th-7th floor are been topped, and leveled with
the height of the nosing.
Pictures of Evidences

Measured the elevation of the stairs Listed the measurements of the stair nosing of stair 7 and 8
and the elevation
Training Day 23 Accomplishment Summary
Date August 8, 2017

Highlighted the units with


Training Location / Site Brgy. Highway Hills, Mayflower bulkhead ceiling in tower 1
Description of Daily Training
St. Mandaluyong City 8th-10th floor
Activity
Measured and computed
the area of balanced of
work in tower 2 15th floor

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 8:30am-5:30pm Number of Hours 8 hours

In my twenty-third day on construction site, my supervisor told us to list all the units with bulkhead in tower 1.
We have listed all the units with bulkhead ceiling. Most of the units in 9th floor have an accomplished bulkhead
except for the unit 17, 18, 39, and 40. My supervisor told us that the purposed of the bulkhead is to conceal
the plumbing pipes, electrical wires, duct work or exhaust fans.

They have installed the bulkhead ceiling on the kitchen, bedroom, and in the hallway .We have noticed that
Details of Training Activity some of the units have a one bulkhead installed while others have two, maybe they are not yet done with that
unit. Two-bulkhead ceiling are required for each unit. We have highlighted the area in every unit with an
accomplished bulkhead ceiling.

After lunch we have wrote and highlighted the units with accomplished bulkhead ceiling. After that, our
supervisor told us to measure the balanced of work in tower 2 15th floor. We have measured the balanced for
plaster, concrete hollow blocks, and lintel beam.
Pictures of Evidences

Highlighted the units with bulkhead ceiling Computed the area of balanced of work in tower 2 15th floor
Training Day 24 Accomplishment Summary
Date August 9, 2017

Updated and monitored


Training Location / Site Brgy. Highway Hills, Mayflower Description of Daily Training the accomplishments for
St. Mandaluyong City Activity skim coat on the ceiling
and ceiling frame of tower
1 8th-20th floor

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-3:00pm Number of Hours 6.5 hours

In my twenty-fourth day on construction site, my supervisor told us to update and monitor the accomplishments
for skim coat and ceiling frame for every unit of 8 th-20th floor of tower 1. My supervisor told us that the skim
coat applied to repair or smooth damaged walls. It can repair a crack, fill a joint, or level an area with an
existing flat surface. They have spread a skim coat with a trowel or drywall knife over a ceiling to create a flat
surface for painting or wallpapering and they applied 2-4 coats before the surface is smoothened.

Details of Training Activity I have noted the units with skim coat of the ceiling and ceiling frame. We have noticed that most of the units
in 8th-10th floor have many accomplishments of skim coat on ceiling and ceiling frame compared to the other
floor level of tower 1. After we have updated, I went to the office to transfer the accomplishments on the 8 th-
20th floor on the ceiling and highlighted the updates with blue pen, or highlighter.
Pictures of Evidences

Updated the accomplishments for skim coat of ceiling of Monitored and updated the accomplishments for ceiling frame
tower 1 8th-20th floor for tower 1 8th-20th floor
Training Day 25 Accomplishment Summary
Date August 11, 2017

Supervised the laborers


Training Location / Site Brgy. Highway Hills, Mayflower and mason in 7th-19th floor
St. Mandaluyong City of tower 1
Description of Daily Training
Updated and monitored
Activity
the accomplishments for
skim coat on the ceiling
and ceiling frame of tower
2 8th-20th floor

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-3:00pm Number of Hours 6.5 hours

In my twenty-fifth day on construction site, my supervisor told us to supervise the workers on 17th-19th floor
with their masonry works. I have watched the workers mixing the water, cement, and gravel on the 19 th floor
and I asked my supervisor what are the concrete mixture ratio, and she told me it is1:2:4. Most of the workers
plastered the wall and others installed concrete hollow blocks.

After lunch, I have updated and monitored the accomplishments of the ceiling frame and ceiling skim coat of
Details of Training Activity tower 2 8th-20th floor. In tower 2, 8th-11th floor have an accomplishments of ceiling frame and the hallway have
a ceiling frame installed.
Pictures of Evidences

Supervised the workers in 19th floor Photo taken of a ceiling frame of a unit
WEEK 10
Training Day 26 Accomplishment Summary
Date August 14, 2017

Description of Daily Training Estimated the exterior


Training Location / Site Brgy. Highway Hills, Mayflower
Activity walls of 7th 23rd of tower
St. Mandaluyong City
3

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-11:30am Number of Hours 4 hours

In my 26th day on the site, I estimated the area of the exterior walls of 7th-23rd floor of tower 3. Tower 3 is a
41- storey building, so I assigned to estimate the 7th-23th floor, while my co on-the-job trainee assigned to
estimate the 24th-41st story building. We based our computation of area of the exterior walls in the
measurements in the plan approved by ASYA, the designer of SMDC.

We estimated the area of exterior walls of tower 3 for bidding, in order to know which contractor was going
Details of Training Activity assigned on the architectural works. We have computed the area for every floor, and separated the
computation for concrete hollow blocks, sand, and gravel. We have separated the computation for every
elevation (rear view, right side view, and left side view, and front view).
Pictures of Evidences

Detailed elevation plan of tower 3 Estimated the area of the exterior walls of tower 3
Training Day 27 Accomplishment Summary
Date August 15, 2017
Measured and computed
the balanced of work for
Training Location / Site Brgy. Highway Hills, Mayflower concrete hollow blocks
St. Mandaluyong City Description of Daily Training and plaster of tower 1 8th-
Activity 15th floor
Estimated the materials
needed for the balance of
work

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 8:00am-6:00pm Number of Hours 9 hours

In my 27th day on construction site, my supervisor told me to measure and compute for the balanced of work
for concrete hollow blocks and plaster. We highlighted on the key plan the area with a balanced of work. Most
of the balanced of work in every unit have a measurement on the approved plan, so we have based some of
the measurements in the plan that we use for the computation of the area. After we measured the area of the
balanced of work, we went to the office to compute for the area. We computed for the total area of balanced
of work for every floor to determine the needed materials on every floor level.
Details of Training Activity
After lunch, we estimated the needed materials for every floor. We used the book cost and estimate by Max
Fajardo as a guide on how to determine the number of materials needed. We used the total area that we have
computed earlier. We estimated the needed pieces of 4 inches or 6 inches concrete hollow blocks, pails of
vibro / white sand, and bags of cement.
Pictures of Evidences

Estimated the materials needed for the balance of work Computed for the total area of balanced of work
Training Day 28 Accomplishment Summary
Date August 16, 2017

Sorted and separated the


Training Location / Site Brgy. Highway Hills, Mayflower billing papers of the
Description of Daily Training
St. Mandaluyong City subcontractors
Activity
Highlighted the
accomplishments of each
subcontractor

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:45am-3:15pm Number of Hours 6.5 hours

In my 28th day on the construction site, we sorted and separated the billing papers of the subcontractors. We
have arranged it from the recent on the top to the old billing papers and separated the billing papers according
to the subcontractor group. We have sorted and separated the papers of LAVSCOR, BAUWERK, DENMART,
TECSON, and PAMPAG, etc. We fastened all the papers of a subcontractor in a separated folder from other
subcontractor to find their billing papers easily in case they need it.

Details of Training Activity After lunch, we, on-the-job trainees selected the subcontractor we want to update the accomplishments for
every floor level the subcontractor assigned to work. We have highlighted the accomplished works of every
subcontractor. The subcontractor I choose has many accomplishments on 12th floor of tower 1. After we have
highlighted their accomplishments in plaster, zocalo, and concrete hollow blocks, we gave it to our supervisor.
Pictures of Evidences

Sorted and separated the papers of the subcontractor Highlighted the accomplishments of each subcontractor
Training Day 29 Accomplishment Summary
Date August 17, 2017

Tagged the unit number


Training Location / Site Brgy. Highway Hills, Mayflower for each unit of 14th-15th
St. Mandaluyong City floor of tower 1
Description of Daily Training
Measured the nosing of
Activity
the kitchen and the nosing
in the door opening of
each unit of 10th-12th floor
of tower 1

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:45am-3:15pm Number of Hours 6.5 hours

In my 29th day on construction site, my supervisor told me to tag the unit number for each unit of 14 th-15th
floor of tower 1. She have printed the unit number with floor level, and we have tagged it in the plastered wall
on the hallway of each unit. The unit number are tagged, so that when we updated the accomplishment of
works we can identify easily which units we monitor and we no longer need to count the units from the end
unit.

Details of Training Activity After lunch, we have measured the nosing of the kitchen and nosing in the door opening of each unit in 10th-
12th floor of tower 1. We measured the nosing in order to check if the workers followed the measurements
based on the plan approved by ASYA. We wrote the measurements on the key plan of each floor level and
rewrote all the measurements on a clean copy of the key plan.
Pictures of Evidences

Tagged the unit number for each unit Measured the nosing of the kitchen
Training Day 30 Accomplishment Summary
Date August 18, 2017

Updated and monitored


the accomplishments for
wall and toilet and
bathroom of 8th-15th floor
Description of Daily Training
Training Location / Site Brgy. Highway Hills, Mayflower of tower 1
Activity
St. Mandaluyong City Updated and monitored
the accomplishments for
concrete hollow blocks
and plaster of 8th-20th floor
of tower 2

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-3:15pm Number of Hours 6.75 hours

In my 30th day on the construction site, my supervisor told me to update and monitor the accomplishments for
wall, and toilet and bathroom of 8th-15th floor of tower 1. She gave me the previous key plan with an updated
accomplishment of work last week. I highlighted the area with an update on the accomplishments of work as
Details of Training Activity of Friday for that week. Most of the toilet and bathroom are finished in masonry works in 8 th-10th floor but
some of it still need to be rectified.

After lunch, we have updated and monitored the accomplishments for concrete hollow blocks and plaster of
8th-20th floor of tower. Most of the units in 10th- 20th floor has a balanced of work. As we monitored the
accomplishments, we have noticed that some of the units in 11 th and 12th floor of tower 2 did not follow the
general notes in masonry. The steel man installed wrong diameter of reinforcing bars in the corners,
intersection and in the opening of the door. They already installed 10mm diameter of reinforcing bars and
poured concrete mix for zocalo so they need to proceed to the installation of the concrete hollow blocks. I
talked to the foreman of the mason on 11 th and 12th floor and told him that they should use 16mm for every
intersection, opening, and corners, and he told me that he will follow this to the other units which is not yet
started.

Some of the partitioned wall was marked by the vice president of JJTAN, this are the walls that are not aligned
and did not follow the layout of the surveyor. This are partitioned walls that cannot be correct by thickening
the plaster. That are the walls that are needed to be destroy after it they need to install a new concrete hollow
blocks and follow the lay out.
Pictures of Evidences

Updated the accomplishments of works for wall and toilet Updated the accomplishments for concrete hollow blocks and plaster
and bathroom of 8th-15th of tower 1 of 8th-20th floor of tower 2
Training Day 31 Accomplishment Summary
Date August 19, 2017

Updated and monitored


Training Location / Site Brgy. Highway Hills, Mayflower the accomplishments for
St. Mandaluyong City concrete hollow blocks
and plaster of 7th-20th floor
Description of Daily Training of tower 2
Activity Measured and computed
the area of the
accomplishments for
concrete hollow blocks
and plaster of 7th-20th floor
of tower 2

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-5:30pm Number of Hours 9 hours

In my 31st day on the construction site, my supervisor told me to update the accomplishments for concrete
hollow blocks and plaster of 7th-20th floor of tower. She want to make the key plan of 7 th-20th floor of tower 2
Details of Training Activity updated as of Saturday because the project manager asked them the units that can be hand-over for that day,
and on Saturday they give the payment for the subcontractors who make some of the units. The 9 th floor has
many accomplishments compared to the other floor, they started to paint and installed tiles most of the units
in this floor level.

After lunch, we computed and measured the area of the accomplishments for concrete hollow blocks and
plaster of 7th-20th floor of tower 2. Most of the units in tower 2 have a balanced of work in the toilet and
bathroom in plaster. After we measured the length and height of the balanced of work, we proceed to the
computation of the balanced of work. Based on the computation of the total area, we determined the floor
level needed to be plaster and need to install concrete hollow blocks.
Pictures of Evidences

Computed for the accomplishments for concrete hollow blocks Updated and monitored the accomplishments of tower 2
and plaster of 7th-20th floor of tower 2
WEEK 11
Training Day 32 Accomplishment Summary
Date August 21, 2017

Listed the laborers and


Training Location / Site Brgy. Highway Hills, Mayflower mason worked in 7th-8th
St. Mandaluyong City Description of Daily Training floor of tower 1
Activity Listed the needed
materials for the masonry
works in 7th-18th floor of
tower 1 in a request form

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-4:15pm Number of Hours 7.75 hours


In my 32nd day on the construction site, I assigned to the operation. We supervised the workers in their
masonry works, and asked the foreman the needed materials. Because its holiday, there is no alimak so
they cannot carry the materials up a height or a floor level, where the foreman who requested for the materials
can be found. As we supervised, we have noticed that the plastered wall of some units exceeded to the layout
plan so we as a junior civil engineers told Engr. Jearf about that, and he asked some workers to fix it.

After lunch, we have listed all the materials needed for the next day. It includes the number of pails and what
Details of Training Activity type of sand, pieces and diameter of reinforcing bars, number of bags of cement, and pieces of concrete
hollow blocks. After it, we gave the request form of materials to the project manager for the approval of the
request and gave it to the warehouse where the materials can be located.
Training Day 33 Accomplishment Summary
Date August 22, 2017

Checked the lay-out of 8th-


Training Location / Site Brgy. Highway Hills, Mayflower 20th floor of tower 1 and 2
Description of Daily Training
St. Mandaluyong City Updated the
Activity
accomplishments for
ceiling frame of 11th and
12th floor of tower 2

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 8:30am-7:15pm Number of Hours 9.75 hours


Inmy 33rd day on the construction site, my supervisor told us to checked the lay-out of the partition walls, toilet
and bathroom, and in the hallway. We noted the units with lay- out for each floor level. Due to dust and water
in the area of the units, we cannot able to saw the lay- outs. Some of the workers saw us, and they told us to
use a brush to be able to saw the lay- out hidden in the dust. Some of the worker let us borrowed his brush
and we continued checked the lay- out up to 18th floor.

After lunch, we have updated the accomplishments on the ceiling frame of 11th-12th floor of tower 2. Most of
Details of Training Activity the units in 11th floor have a ceiling frame except for the units in the edge part of the floor level. We highlighted
the units with an update of accomplishments for ceiling frame.
.
Training Day 34 Accomplishment Summary
Date August 23, 2017

Updated the
Training Location / Site Brgy. Highway Hills, Mayflower accomplishments for
Description of Daily Training
St. Mandaluyong City concrete hollow blocks,
Activity
plaster, and zocalo of 7th-
16th floor of tower 1

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 8:00am-3:00pm Number of Hours 6 hours


In my 34 day on the construction site, my supervisor told us to update the accomplishments for concrete
th

hollow blocks, plaster, and zocalo. Most of the units in the 16 th floor have a accomplishments for zocalo and
concrete hollow blocks as of that day. We highlighted the area with accomplishments. We separated the key
plan for the accomplishments of zocalo, concrete hollow blocks, and plaster.

After lunch, we have rewrote all the accomplishments for zocalo, concrete hollow blocks, and plaster in a
clean copy of a key plan of tower 1. We made a legend of the color we use and indicated if it is accomplishment
Details of Training Activity for concrete hollow blocks, plaster, or for zocalo and after we finished, we gave it to our supervisor.
Pictures of Evidences

Listed the needed materials of the workers in Tower 1 Supervised the workers who stored the materials on 11th floor
of tower 1
Pictures of Evidences

Lay-out plan for kitchen and door opening Updated the accomplishments for ceiling frame of 11th-12th floor
of Tower 2
Pictures of Evidences

Finished plaster of wall of a unit of Tower 1 Updated accomplishments for plaster and concrete hollow
blocks of 7th-16th floor of tower 1
Training Day 35 Accomplishment Summary
Date August 28, 2017

Updated, monitored, and


Training Location / Site Brgy. Highway Hills, Mayflower checked the balanced of
St. Mandaluyong City work of the EE room in 7th-
20th floor of tower 2
Description of Daily Training Computed and measured
Activity the balanced of work of
the EE room
Listed the units with safety
net in 19th-20th floor of
tower 1

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 7:30am-4:00pm Number of Hours 7.75 hours


In my 35th day on the construction site, my supervisor told us to update, monitor and check the balanced of
work for concrete hollow blocks and plaster of the EE room in 7th-20th floor of tower 2. We have measured and
took photos of the balanced of work. After we measured, we computed the total area of balanced of work for
concrete hollow blocks and plaster. We separated the computation for plaster and concrete hollow blocks. We
made a documentation, which includes the photos of balanced of work and the total area of balanced of work.

After lunch, we listed the units with safety net in 19th-20th floor of tower 1. In that floor levels no concrete hollow
Details of Training Activity blocks are install, they only used shotcrete for all the walls.
Training Day 36 Accomplishment Summary
Date August 31, 2017

Made a powerpoint
Training Location / Site Brgy. Highway Hills, Mayflower presentation for safety
St. Mandaluyong City issues, personal
protective equipment, and
Description of Daily Training
safety officer duties
Activity
Updated the
accomplishments of the
door opening in 9th floor of
tower 1

Industry / Company Name / Architectural, Design, Engineering and Technical Services / Jessie James Tamayo Nuez, Inc. / Brgy.
Address Highway Hills, Mayflower St. Mandaluyong City

Name and Signature of


Engr. Jo Anne F. Ferrancullo
Supervisor

Duration 8:30am-2:00pm Number of Hours 5.5 hours


In my 36thday on the construction site, my supervisor told us

Details of Training Activity