SUBCONTRACT AGREEMENT
THIS AGREEMENT, made this 31st of December 2015, between M/S AL JASSMY CONTRACTING
CO. L.L.C whose registered office is at P.O. Box 98082, Dubai, U.A.E (herein after called the First
Party) as one party.
And
M/S. KHAT AL JAMAL PLASTER & TILES CONT whose registered License # (616763)
issued by the government of Sharjah, U.A.E (hereinafter called the Second Party) the other
party.
WHEREAS
The First Party desires that the Second Party shall execute the BLOCK WORK & PLASTERING
WORK (herein after called the Work), forming a part of the project in accordance with the main
contract documents.
The Second Party acknowledges that they are a specialist in the field of the said Works and desires to
carry on the Work and the remedying of any defects therein for the contract of the Work to the satisfaction
of the First Party in accordance with the main contract documents.
Second Party means M/s. Khat Al Jamal Plaster & Tiles Cont.
P.O. Box: 60168, Sharjah, U.A.E
Mobile: 971- 055-620-0611
Total, Two originals of this contract made and only these originals considered as proof
documents in further. It is concluding that the copy made by any source is not valid at any
circumstances. All data in this contract is printed and does not have any corrections.
The clear good copy of commercial license issued by U.A.E Government attached, and counted
as part of this agreement. All the pages and part pages of this contract shall be signed and
stamped by both parties, otherwise those considered as valid.
The scope of work of both parties will be as listed and it covers related execution only by second
party, as in the project documents. Second party should perform the entire job for Clients,
Consultants, Local Authoritys and First partys satisfaction.
This contract is only for above-mentioned project and only valid in U.A.E jurisdictions. In
addition to this, all the outstanding conditions of this contract agreement are binding to Laws and
regulations of U.A.E local authorities and then to FIDIC standards (Federation Internationale
Des Ingenieurs Conseils). All the controversy in this agreement (if any) shall conclude only by
U.A.E Court of Justice.
All the work shall perform as per consultant approved schedule. The delay in progress caused by
second party may lead first party to impose a progress delayed penalty as the maximum penalty
amount will be 10% of this sub-Contract Value.
All the bills rising by second party shall consist of sufficient attachments explaining quality,
progress, retentions, outstanding payments, and cash flow statistics. All these attachments shall
be accepted by the relevant representatives of Client, Consultant and First party before raising the
bill for payment.
2.2. Any work shall not perform until availing the relevant approvals in hand.
2.3. Coordinate and cooperate with other works performing around in the time of
execution.
2.4. Any rejected works by consultant or relevant authority shall be removed and re-
perform without any additional time from schedule. These will not be paid at any
circumstance by first party.
2.5. All kind of fees and penalties for the scope of work shall be paid by second party on
time.
2.6. Protect all work, which are included in the scope of the second party from weathers
destructive actions by self-expense.
2.7. Damages of any materials by second party will be deducted from the second partys
payment account.
2.8. Second party is sole responsible for all his working personals in the project site.
2.9. All personals related to this project should be under labor law of UAE.
2.10. Second party should pay the salary according to UAE labor law for his working
personals on time and he is sole responsible for the same.
2.11. Illegal working or working personals are not allowed in this project site.
2.12. Second party has the sole responsibility to take sufficient safety measures in the site for
his work. Moreover, all the safety measures recommended by the municipality and
UAE safety regulations should be followed strictly.
2.13. Second party is sole responsible for all accidents happening in the project site under
his scope of work during his complete contract duration.
2.14. If required the second party can provide sufficient security personals even for night
guard to protect his scope of work, on self-account. First party does not have any
liability or objection for the same.
2.15. All the defects of work noticed from second partys scope of work in execution period
shall be corrected by second party without any additional time, delay, and pay.
2.18. Provide one good copy of relevant project documents to second party.
3. General
3.1. No penalties or fees shall impose to second party for First partys scope of work.
3.2. 10% retention will be deducted from each payment and 90% Monthly according to the
monthly bill after 2 weeks submission of the bill (Current Dated Cheque will be
issued).
3.3. Each payment request and its document should counter signed by first partys site in
charge before submission.
3.4. The entire job should perform to clients satisfaction. All the works should be in
quality compliance with project documents.
3.5. The First party can terminate the contract any time but second party should have 30
days notice period before termination of contract.
3.6. The Second party has to guarantee that the time period to complete 1 floor shall be 15
days, otherwise, the 1st party reserves the right to impose 1,000.00 AED per day as
penalty.
4. IN WITNESS whereof the parties hereto have executed this Agreement by causing their
corporate seals to be fixed hereunto and duly attested, and these presents to signed by their
duly authorized representative on the date first above written.
_________________________ ________________________