KONTROL STABILITAS DINDING PENAHAN TANAH

Berat Dinding Penahan Tanah dan Beton


di atasnya
pas batu kali / beton = 25 kN/m3

Bidang -1 (lebar 1m)


W1=0,5.a.t.
W1=0,5.1.3.25
W1= 37.5 kN/m

Bidang -2 (lebar 1m)


W2=p.l.
W2=0,5*3*25
W2= 37.5 kN/m

Bidang -3 (lebar 1m)


W3=p.l.
W3=2,3.1.25
W3= 57.5 kN/m

Bidang -4 (lebar 1m)


W4=p.l.
W4=1,0.0,4.20
W4= 8 kN/m

Bidang -5 (lebar 1m)


W5=p.l.(1-w)
W5=2,0.0,4.(20-10)
W5= 8 kN/m

Beban akibat beban merata


W=q.L
W=10.0,4
W= 4 kN/m3
Hasil perhitungan momen akibat gaya vertikal
No Berat Jarak Momen
1 37.5 1.067 40
2 37.5 1.650 61.875
3 57.5 1.150 66.125
4 8 2.100 16.8
5 8 2.100 16.8
6 4 2.100 8.4
152.500 210

Koefisien Tekanan Tanah Pasif ( Kp )

Koefisien Tekanan Aktif ( Ka )

Tekanan Tanah Aktif ( Pa )


Pa1 = Ka.q.H = (1/3).10.(3,6) = 12 kN
Pa2 = 0,5.Ka.y1.H12
= 0,5.(1/3).20.12 = 3 kN
Pa3 = Ka.y1.H1.(H2+H3)
= (1/3).20.1.(2,6) = 17 kN
Pa4 = 0,5.Ka.y'.(H2+H3)2
= 0,5.(1/3).(20-10).(2,6)2 = 11 kN
Pa5 = 0,5.yw.(H2+H3)2
= 0,5.(10).(2,6)2 = 34 kN

Tekanan Tanah Pasif ( Pp )


Pp = (1/2).Kp.y.h = (1/2)*3*20*(0,6)2 = 11 kN

Hasil perhitungan momen akibat gaya horisontal (Aktif)


No Tek Aktif (Pa) Jarak Momen
1 12 2.000 24
2 3 3.333 11.11111
3 17 1.500 26
4 11 0.867 9.764444
5 34 0.867 29.29333
77.733 100.1689

Hasil perhitungan momen akibat gaya horisontal (Pasif)


No Tek Pasif (Pp) Jarak Momen
1 11 0.333 3.6

Jumlah gaya horisontal


Ph = Pa-Pp = 77.733-11 = 66.933 kN
Momen yg mengakibatkan guling
Mg = Ma-Mp = 100.169-3.6 = 96.569 kN

Stabilitas thd penggeseran


Tahanan geser pada dinding sepanjang B = 2,30 m, dihitung dengan menganggap dasar dinding sangat kasar.
Sehingga sudut geser b = 2 dan adhesi cd = c2.
Untuk tanah c ( > 0 , dan c > 0 )

Rh = cd . B + W tan b

Rh = tahanan dinding penahan tanah terhadap penggeseran


cd = adhesi antara tanah dan dasar dinding

B = lebar pondasi ( m )
W = berat total dinding penahan dan tanah diatas plat pondasi
b = sudut geser antara tanah dan dasar pondasi

Rh = cd . B + W tan b
= 10 kN/m x 2,30 m + 152,5 kN/m x tan 30
= 111 kN/m

Fgs=Rh/Ph1,5

Fgs=111/66,9331,5
1.659053 1,5 Aman

Stabilitas thd penggulingan


Tekanan tanah lateral yang diakibatkan oleh tanah dibelakang dinding penahan, cenderung menggulingkan
dinding penahan tanah, dengan pusat rotasi terletak pada ujung kaki depan

Fgs=Mw/Mg1,5

Fgs=210/96,591,5
2.174613 1,5 Aman
PERHITUNGAN PLAT BAWAH DINDING PENAHAN

Perhitungan moment untuk pondasi

Pembebanan

Pas Batu Kali= 2,75.(0,4+0,8).2200.0,5 = 3630 kg/m'


q 3630 kg/m'
Statika L= 3 m
M.maks = 1/8 x 3630 x 3^2 = 4083.75 kgm
Kontrol Kekuatan Pondasi dengan Daya dukung tanah
- Diasumsikan pondasi 1 x 1 m, kedalaman -2,5 m(dr tanah asli), diambill tegangan tanah rata-rata
adalah sebagai berikut 8.5 kg/cm2 (Asumsi Tanah Lunak)
Mtot = 4083.75 kgm fc' (beton) k-300 18.675 Mpa
fy' (baja) 240 Mpa
L (Panjang) = 3 m ds 55 mm
B (Lebar) = 0.8 m tpond 300 mm
kolom 300 / 300 mm s tanah 8.5 kg/cm2

bc = 300 = 1
300
Vu = 0.00 kN
Mu = 40.84 kNm
s tanah = 8.5 x 100 = 850 kPa
d = 300 - 55 = 245 mm b+d = 545 mm 0.545 m
bo = 4 x (245 + 300) = 2180 mm h+d = 545 mm 0.545 m

q = Berat Fondasi + Berat Tanah


= ht x c + ha x t
= 0.30 x 22 + 1.00 x 17.50
= 24.1 KN/m2

KONTROL TEGANGAN TANAH

maks = 0.00 + 40.84 +


24.1
0.8 x 3 1/6 x 0.8 x 3^2
= 0.00 + 34.03 + 24.1
= 58.13 kN/m2 < 850 kN/m2 maks < t, aman

mins = 0.00 - 40.84 -


24.1
0.8 x 3 1/6 x 0.8 x 3^2
= 0.00 - 34.03 + 24.1
= -9.93 < 850 kN/m2 min < t, aman

KONTROL GESER 2 ARAH

Gaya geser yang ditahan oleh beton

Vc

f Vcmin = 0.75 x 1/3 x sqrt(18.675) x 2180 x 245


= 577.0 kN

gaya tekan ke atas (geser pons)

Vu

= {(3x0.8)-(0.545x0.545)} x {(58.1312+-9.9312)/2}
= 50.7 kN

Kontrol :
Karena .Vc > Vu, Aman
KONTROL GESER 1 ARAH

a = B/2 - b/2 - d
= (0.8/2)x1000 - (300/2) - 245
= 1500 - 150 - 245
= 1105 mm

a = min + (B-a) x (maks-min)


B
= -9.93125 + (0.8-1105) x (58.13125--9.93125)
0.8
= -35.88 kN/m2

Vu = a x B x ((mak+a)/2)

= (1105x0.8) x (58.13125+-35.8800)x0,5

= 9.84 kN/m2

Vc =

= ((18.675^0,5)/6)x(0.8x1000) x (245)

= 847.0057851042 kN/m2

.Vc = (0.75x847.0057851)
= 635.254 kN/m2 > 9.84

Kontrol :
Karena .Vc > Vu, Aman

PENULANGAN
B h
x = -
2 2
= 800 - 300
2 2
= 250 mm

x = min + B - x x maks - min B


= -9.93 + 800 - 250 x 58.13 - -9.93 800
= 32.6078125 kN/m2

maks - x
Mu = 0.5 x x 2 + 3 x 2

= 0.5 32.6078 0.25 2 + 58.13 - 32.60781 0.25 2


3
= 1.551 kNm

Mu
K =
x b x d 2

= 1550732.421875
0.8 x 1000 x 245 2

= 0.0322934698 Mpa

382.5 x 0.85 x 600 + fy - 225 x 1 fc'


Kmaks =
600 + fy 2

= 382.5 x 0.85 x 600 + 240 - 225 x 0.85 18.675

600 + 240 2
= 5.5825134028 Mpa

2 x K
a' = 1 - 1 - d
0.85 x fc'

2 x 0.03229347
a' = 1 - 1 - 245
0.85 x 18.675

= 0.4989 mm

0.85 x fc' x a' x b


As(1) =
fy
0.85 x 18.675 x 0.4989 x 1000
As(1) =
240
= 33.00 mm2

As(2) = 0,0025*b*d mm2 (Gideon; pelat dgn Mutu Baja=250 Mpa)


= 0,0025*800*245 490
Pilih Jarak Tulangan
0.25 x (22/7) x D 2 x S
s =
As

0.25 x (22/7) x 12 2 x 1000


=
490
= 230.9037900875 mm Jadi dipasang tulangan 12 - 175 mm (Atas & Bawah)
Karena Struktur dinding penahan yang cukup panjang, sekitar 160 m , maka di butuhkan ikatan antar dinding penahan agar bersifat rigid.
Maka dipasang Kolom 30x30 cm dan Balok Ring 20x40 cm agar bisa menyatu dengan Plat Pondasi dan Dinding Batu Kali.

Kolom Balok Ring Plat Pondasi

Tampak Memanjang Struktur Dinding Penahan Tanah


KONTROL STABILITAS DINDING PENAHAN TANAH

Berat Dinding Penahan Tanah dan Beton Jarak Beban Terhadap Ujung Dinding
di atasnya Penahan ( di titik A )
pas batu kali / beton = 2400 Kg/m3
X1 = 0,5*70 = 0,35 m
Bidang -1 (lebar 1m) X2 = 0,5*0,4364+0,3636 = 0,5818 m
W1=P.L. X3 = (2/3)*0,3636 = 0,2424 m
W1=0,7*0,8*2400 = 1344 Kg X4 = 0,5*0,3+0,7 = 0,85 m
X5 = (1/3)*0,4*+0,3+0,7 = 1,33 m
Bidang -2 (lebar 1m) X6 = 0,5*0,4364+,3636 = 0,5818 m
W2=P.L.
W2=0,4364*1,8*2400 = 1885,25 Kg
Momen Terhadap Ujung Dinding Penahan
Bidang -3 (lebar 1m) ( Titik A )
W3=0,5.P.L.
W3=0,5*0,3636*1,8*2400 = 785,375 Kg M-1 = W1*X1 = 1344*0,35 = 470,4 Kgm
M-2 = W2*X2 = 1885,25*0,58 = 1093,45 kgm
Bidang -4 (lebar skur = 40 cm) M-3 = W3*X3 = 785,375*0,24 = 188,49 kgm
W4=0,4(P.L.) M-4 = W4*X4 = 792*0,85 = 673,2 kgm
W4=0,4*0,30*2,75*2400 = 792 Kg M-5 = W5*X5 = 528*1,33 = 702,24 kgm
M-6 = W6*X6 = 192*0,58 = 111,36 kgm
Bidang -5 (lebar skur = 40 cm)
W5=0,4(0,5.P.L.)
W5=0,4*0,5*0,40*2,75*2400 = 528 Kg

Bidang -6 (lebar 1m)


W6=P.L.
W6=0,4*0,2*2400 = 192 kg

Hasil perhitungan momen akibat gaya vertikal


No Berat Jarak Momen
1 1344 0.35 470.4
2 1885.25 0.5818 1096.838
3 785.375 0.2424 190.3749
4 792 0.85 673.2
5 528 1.33 702.24
6 192 0.5818 111.7056
5526.625 3244.759
W = 5526,62 kg M = 3244,76 kgm
Koefisien Tekanan Aktif ( Ka ) Koefisien Tekanan Tanah Pasif ( Kp )

Tekanan Tanah Aktif ( Pa )


Pa = Ka.q.h = (1/3)*1000*2,75 = 900

Tekanan Tanah Pasif ( Pp )


Pp = (1/2).Kp.y.h = (1/2)*3*1000*(0,7)2 = 735

Jarak I dengan thd titik A


L-1 = (1/2)*H = (1/2)*2,75 = 1,375 m

Momen Akibat Tekanan Aktif


Ma = Pa.(L-1) = 900*1,375 = 1240 kgm

Momen Akibat Tekanan Pasif


Mp = Pp.(L-1) = 735*1,0 = 735 kgm

Jumlah gaya Horisontal


Ph = Pa -Pp = 900-735 = 165 Kg

momen yg Mengakibatkan Penggulingan


Mgl = Ma -Mp = 1240-735 = 505 kg

Menghitung Stabilitas Terhadap Penggeseran

Rh = cd . B + W tan b

Rh = tahanan dinding penahan tanah terhadap penggeseran


cd = adhesi antara tanah dan dasar dinding
B = lebar pondasi ( m )
W = berat total dinding penahan dan tanah diatas plat pondasi
b = sudut geser antara tanah dan dasar pondasi

Rh = cd . B + W tan b
Rh = 1000 . 3 + 5526,62. tan 30
Rh = 30000+ 3190.796 = 6190.796 Kgm

Fgs = Rh / Ph = 6190,8/165 = 37,52


Fgs = 37,52 > 1,5 --------(Dimensi Aman)

Menghitung Stabilitas Terhadap Penggulingan

Fgs = Mw / Ma = (3244,76/1240)
Fgs = Mw / Ma = 2,625
Fgs > 1,5 --------(Dimensi Aman)