Escolar Documentos
Profissional Documentos
Cultura Documentos
TALKING TECHNICALLY
ROCK REINFORCEMENT 11
Pages 11-12 23/6/03 12:12 pm Page 12
TALKING TECHNICALLY
Time
In the time it
Time savings by using MAI SDA System.
takes you to
from rather limited soil investigations. allow an immediate intervention, read this
Furthermore, todays need to satisfy reducing time wastage and increasing
the design requirements for infrastruc- productivity.
advert,
ture projects mostly doesnt allow a The design of the Atlas Copco MAI you could
route selection that follows only good SDA also favours productivity in
rock conditions. This increasingly terms of storage and handling. Anchor have installed
demands flexibility by the contractor,
who may be forced to adjust at short
bars with a continuous left hand thread
are delivered to site in standard
these...
notice to unpredicted changes in geo- lengths of 2 m, 3 m, 4 m and 6 m, and
logical conditions. can be assembled, or cut to the length
Construction sites today have the required, without loss of material.
option to cater for every eventuality, Transport to site, and onward to the
and to maintain tools at site for every working area, is simplified, due to the
type of ground condition. Prior plan- short lengths of the anchor elements
ning by the site management to main- and their accessories.
tain sufficient quantities of Atlas
Copco MAI SDA available for use can by Mark Bernthaler
Delivery lengths of Atlas Copco MAI SDA.
Enough said?
www.swellex.com
12 ROCK REINFORCEMENT