Borehole Log

Borehole
BoreholeNumber
Number01
1 Method Rotary drilling
Sheet 1 of 1

Boring
Dia. 100 mm
Started on 4/4/2013
Project : Proposed Building site at Mankave ,Calicut Ended on 4/4/2013
(a)
Client : Mr.Abid Depth of bore hole (m) 19.40
Ground water depth (m)(c) 1.30m
Thicknes

Sample
SPT Blow Count Rock Core
Depth

Depth
Layer

s (m)
(a)

(b)
Description Remarks
(m)

(m)
15 30 45 N (d) CR RQD
Ground Surface
0.0 0.00

1.0
1.50 SS 3 4 5 9
2.0

3.0 3.00 SS 1 2 2 4
7.20 Clayey sand (Gray)
4.0
4.50 SS 5 7 7 14
5.0

6.0 6.00 SS 5 8 8 16

7.0
7.20
7.50 SS 8 9 13 22
8.0

9.0 2.90 Clayey sand witg shell dust (gary) 9.00 SS 7 8 10 18

10.0
10.10
10.50 SS 2 3 2 5
11.0
1.40 lateritic clay (R/Gray)
11.50
12.0 12.00 SS 5 7 6 13

13.0
13.50 SS 3 6 9 15
14.0 4.10 Stiff lateritic clay (Y/Gray)

15.0 15.00 SS 4 7 10 17
15.60
16.0

17.0 2.30 Stiff lateritic clay (B/Gray) 17.00 SS 8 14 18 32


17.90
18.0 17.90 SS SPT Rebounded W/O Sample
18.40 0.50 Soft Rock
19.0 Hard rock boring done by D/Bit using from 18.40M to 19.40 depth
1.00 Hard Rock
19.40
20.0
End of the borehole at 19.40m.depth

(a) (b)
Depth shown is below existing Ground Level Depth shown is at the start of test / sampling below existing GL
(c) (d)
Ground water depth may fluctuate depending on season N values shown are uncorrected NM : Not Met
R : Refusal SS : Split-spoon Sample UDS : Undisturbed Sample CR : Core Recovery RQD : Rock Quality Designation