The document describes the Tujuh Bukit copper and gold mining project. It includes a table listing 17 pits across 5 areas (A, BW, BE, C, E) with details on surface area, volume, design parameters and filenames/versions for each phase of mining. It also includes tables with details on dumps, sediments, haul roads and provides summary volume information comparing planned and actual volumes for each pit area and in total.
The document describes the Tujuh Bukit copper and gold mining project. It includes a table listing 17 pits across 5 areas (A, BW, BE, C, E) with details on surface area, volume, design parameters and filenames/versions for each phase of mining. It also includes tables with details on dumps, sediments, haul roads and provides summary volume information comparing planned and actual volumes for each pit area and in total.
The document describes the Tujuh Bukit copper and gold mining project. It includes a table listing 17 pits across 5 areas (A, BW, BE, C, E) with details on surface area, volume, design parameters and filenames/versions for each phase of mining. It also includes tables with details on dumps, sediments, haul roads and provides summary volume information comparing planned and actual volumes for each pit area and in total.
1 A A1 pit_a1_pd_v1_20170823_cut 1 2 A A2 pit_a2_pd_v1_20170823_cut 1 3 A A3 pit_a3_pd_v3_20170818_cut 3 4 BW BW1 pit_bw1_pd_v1_20170827_cut 1 5 BW BW2 pit_bw2_pd_v2_20170827_cut 2 6 BW BW3 pit_bw3_pd_v1_20170824_cut 1 7 BW BW4 pit_bw4_pd_v1_20170822_cut 1 8 BE BE1 pit_be1_pd_v1_20170822_cut 1 9 BE BE2 pit_be1_pd_v1_20170821_cut 1 10 C C1 pit_c1_pd_v1_20170809_cut 1 11 C C2 pit_c2_pd_v1_20170811_cut 1 12 C C3 pit_c3_pd_v1_20170815_cut 1 13 C C4 pit_c4_pd_v1_20170817_cut 1 14 C C5 pit_c5_pd_v1_20170818_cut 1 15 C C6 pit_c6_pd_v2_20170808_cut 2 16 E E1 pit_e1_pd_v1_20170824_cut 1 17 E E2 pit_e2_pd_v1_20170823_cut 1
Dmp Phase Filename Version
18 BE 19 BW 20 C 21 CWD DmpCWD 22 CAN DmpCAN
Sed Phase Filename Version
23 CSS 24 BESS 25 PASS 26 PCSS
HR Phase Filename Version
27 PAHR 28 29 30 31 Design Parameter* Surface Area Volume Batter Bench Berm 314,780 4,926,884 75 15 8 80,959 4,771,778 75 15 8 262,555 6,515,449 75 15 8 3,333,861 75 and 65 for bearing 40 to 125 15 8 622,792 75 and 65 for bearing 40 to 125 15 8 1,087,733 75 and 65 for bearing 40 to 125 15 8 2,670,074 75 and 65 for bearing 40 to 125 15 8 1,723,368 65 15 8 1,778,048 65 15 8 322,937 75 and 65 for bearing 90 to 125 15 8 350,035 75 and 65 for bearing 90 to 125 15 8 3,727,655 75 and 65 for bearing 90 to 125 15 8 2,602,698 75 and 65 for bearing 90 to 125 15 8 4,230,392 75 and 65 for bearing 90 to 125 15 8 206,689 75 and 65 for bearing 90 to 125 15 8 802,844 65 15 8 344,581 65 15 8