Indonesia Sulawesi Mining Investment Company 2x150MW unit

operasi tiket
Nomor:
Operation task: # furnace cold start
Operation start time: 年 月 日 时 分,Waktu akhir: 年 月 日 时 分

签发人(值长): 监护人: 操作人: 年 月 日 时 分

值长: 监护人: 操作人: 年 月 日 时 分


It has
been Operatin
order Operation content
execut g time
ed
1 锅炉启动前检查准备工作

1 The boiler is cold start.


Big, minor repairs after the end of the work, all the end of the work,
2
acceptance qualified.
3 Notify the post of professionals, do the preparatory work before starting
Check the boiler body and flue intact, no internal, no coke and debris, each
4 hole, inspection hole has been closed, the furnace around the health clean,
adequate lighting, walkway
The door baffle complete, flexible switch, transmission device intact. And
confirm the DCS work properly, CRT screen display and the actual state of
5
the device line, the valve switch instructions and the actual location of the
same place, and control the right, each turn with start conditions
Check the valve switch is flexible, the location is correct, no card astringent
6
phenomenon
Contact the thermal workers will be all thermal instrumentation, signal,
7 protection device power; do the equipment, system interlock and protection
test work, test qualified into normal and record
Notify the ESP staff to check the electrostatic precipitator, the boiler before
8
the ignition 24 hours into the ESP electric heating.
Check the auxiliary and cooling water, closed water system put into
9
operation normally.
Check the oil gun hand door, solenoid valve closed, test oil gun advance
10
and retreat flexible, normal fire
Nomor:
Operation task: # furnace cold start
Check the instrument and plant compressed air system put into operation
11
normally.

Contact the electrical measurement of the auxiliary motor insulation and

12 power transmission, and notify the heat to send the instrument power, and
put the instrument indicator signal

13 Check the pulverizer oil system and put it into operation normally.
Boiler water to the drum ignition level (-100mm), stop the water after the
14 start of the economizer recycling door. Drum up and down the wall
temperature difference <40 ℃
Start fuel pump operation, the establishment of fuel system, adjust the oil
15
pressure before the oil gun, oil gun atomization test
16 Put the boiler slag bucket water seal system, slagging system is normal.
17 Put the air preheater into the ash - assisted steam system
2 Boiler ignition temperature rise
1 Start fire detection cooling fan, wind pressure> 8KPa.
2 Into the furnace flame TV monitoring device.
3 Ignition two hours ago, put the electric dust removal device.
4 Start A air preheater, current ____A.
5 Start B air preheater, current ____A.
Start A suction fan, check the normal operation, current ____ A, adjust the
6
furnace negative pressure -125Pa
Start A blower, check the normal operation, current ____ A, adjust the
7
furnace negative pressure -125Pa.
Start B suction fan, check the normal operation, current ____ A, adjust the
8
furnace negative pressure -125Pa ..
Start B blower, check the normal operation, current ____ A. Adjust the total
9
air volume to 30% -40% of the rated air volume
10 Conduct a fuel leak test.
Check the furnace purge conditions to meet, the furnace began to purge,
11
the furnace purge is completed, MFT automatically reset.
12 Put the air preheater continuously soot (auxiliary steam).
13 Into the A, B side of the furnace smoke temperature infrared detector.
Nomor:
Operation task: # furnace cold start
Open the layers of fuel hand door, air purge hand door, put _____ layer
14
_____ oil gun ignition. According to the cold start curve temperature rise.
After the boiler is ignited, the boiler side should do the following:
1) confirm that the furnace temperature of the furnace can not exceed 538
15 ℃.
2) to maintain the normal water level drum, according to the quality of the
boiler, according to the requirements of the bottom of the boiler sewage.
Pressure rose to 0.1 ~ 0.3MPa, rinse the drum water level gauge,
16 proofreading water level, notify the hot flush instrument tube, close the air
door.
Pressure rose to 0.3 ~ 0.5MPa, the notice overhaul hot screw, the boiler for
regular sewage, so that the Department of heat evenly, as soon as possible
17
to establish water circulation; and contact the turbine attendants into high
and low bypass.
18 Check the expansion indicator and record it once
When the pressure rises to 0.5 ~ 1.0MPa, notify the chemical laboratory to
test the steam quality, according to the chemical requirements into the row,
19
off the roof of the superheater entrance to the mouth of the hydrophobic
door.
According to the main steam pressure and temperature gradually _____
20 layer _____ oil gun, observe the burning situation in the furnace, continue
to increase the temperature rise by the curve
When the drum pressure is 1.5MPa, keep the superheater outlet
21 hydrophobic in the open state, close the other side of the superheater
hydrophobic door, close all reheater hydrophobic door.
Open the opening of the pulverizer inlet pneumatic door, adjust the coal
22
mill inlet cold, hot air electric door.
Secondary hot air temperature reaches 180 ℃, start A, B a fan, the mill for
23
warm grinding
Start ____ sealed fan, current ____A, the mother tube pressure ____ Kpa,
24
_____ sealed fan linkage.
Adjust the seal of the wind tube and cold air valve pressure difference ≥
25
5kPa
Adjust the pressure of a wind tube _____Kpa, adjust the secondary air
26
baffle appropriate, start ____ milling system, current ____ A.
Nomor:
Operation task: # furnace cold start
According to the main steam and reheat steam pressure, the temperature
contact turbine attendant into the Ⅰ, Ⅱ class bypass system operation, in
27
strict accordance with the start temperature, pressure curve control unit
temperature rise and pressure rate.
Superheater outlet pressure up to MPa, the main steam temperature ℃,
reheater pressure control in the MPa, reheat steam temperature ℃, adjust
28
the steam parameters and stability, contact the water test steam quality
qualified to do after the preparation.
3 Turbine fires, grid and load
Hour, the steam turbine rushed, the parameters (when the main steam
1 pressure MPa, steam temperature ℃; turbine to carry out and 50 ℃
superheat.)
2 Hour, the steam engine speed to 3000 speed, with the # unit with the load
After the unit is connected to the grid, contact the steam turbine attendant
3 to gradually close the Ⅰ, Ⅱ class bypass, at the same time check off the
boiler superheater outlet hydrophobic door.
____ milling system to the amount of coal> 50%, put ____ milling system,
4
current ____ A.
Unit load 45MW, cut the main water supply bypass to the main road
5
running, the boiler continuous water, close the economizer recycling door.
According to the situation of steam temperature, put the superheater one
6
or two temperature water (automatic)
Furnace outlet smoke temperature> 538 ℃, check the smoke temperature
7
infrared detector exit operation.
Unit load rose to 60MW depending on the situation only one by one out of
the oil gun, check the various layers of coal flame flame stability. After all
8
the oil guns have stopped running, the ESP is put into operation. Stop the
air preheater for continuous soot.
According to the load conditions start _______ milling system, current ____
9
A.
10 When the load> 80%, combustion stability, the boiler full soot
Adjust the combustion, steam temperature, steam pressure, and gradually
11
increase the load load
Nomor:
Operation task: # furnace cold start
Check the boiler thoroughly and record whether the expansion instructions
12
are normal
4 Precautions
Drum wall temperature difference of not more than 50 ℃, steam superheat
1
to ensure that more than 50 ℃
Control the temperature rise and pressure speed, the initial furnace is
2
generally 1.5 ℃ / min and 0.2MPa / min.
Began to vote powder, pay attention to observe the furnace fire situation,
3
to prevent fire
Pay attention to the adjustment of the water level of the drum to prevent
4
false water level
5 To ensure that the heating surface wall is not overheated

Note: