Escolar Documentos
Profissional Documentos
Cultura Documentos
CONTROLLING
CONTROLLING
BUSINESS PROCESS PROCEDURE
XYZ LIMITED Title: Changing of standard hierarchy
Organisation/Area : Standard hierarchy.
File name: coumhi01.doc Solution/Release : R/3 4.6 B
Responsibility:
PROCEDURAL STEPS
1.2. On the “Change Cost center group: Structure“, we can make changes using the following fields .
Create Icon New group can be inserted at same level or lower level
other than the nodes under which cost centers are
attached. For this click on the “create” icon or click
the right buton of the mouse and select the required
function. (Create group-same level, lower level etc.)
Group name R In this field enter the name of the new node.
Other functions R Click the node and click right mouse button. Select the
Required function like Create group-same level,lower
level, Delete,Copy, Change sequence-Move top,
bottom, Move up & move down functions.
CONTROLLING
Hi Radhu,
Here we are all fine. I am visiting Calicut during weekends. Ganga and Umakutty are fine. Last saturday,
Koduvayoor Athai came to calicut along with me. She will be staying with Ganga for some time. So, Ganga's father
came back to Nurani to stay with Radhika.
Please ask Murali to send a mail to me. I have not contacted him after Ganga joined for M.phil since I don’t have his
correct e-mail id(Latest).
Please send me his e-mail id also. Please reply.
Bye,
Viswanathan