Escolar Documentos
Profissional Documentos
Cultura Documentos
THESIS
MASTER OF SCIENCE
By
Abuja, Nigeria
November, 2010
ABSTRACT
Maximum production from an oil well can be achieved through proper selection of tubing size. The
selection of optimum tubing size must be evaluated when completing a well in any type of reservoir
especially solution gas drive reservoir since there is likelihood of producing more gas as the reservoir
pressure declines. The most widely used methods such as Tarner, Muskat and Tracy methods for
predicting the performance of a solution gas drive reservoir were discussed and used to estimate the
behaviour of producing GOR. A comparison was made between the results from each method. System
analysis approach was adopted for this study. The future IPR curves were determined by a
combination of Vogel and Fetkovich correlation. Beggs and Brill multiphase spreadsheet was used to
produce the TPR curves by estimating flowing bottomhole pressure for several tubing size using the
predicted GOR produced and a range of flowrates. The effect of water production was also considered
in this study. The results showed that for IPR5 as GOR increased from 1052 to 1453 scf/stb, oil
production rate for 2 7/8-in increased by 17.6% and 3.3% for a further increase in GOR at 2610
scf/stb. At a GOR of 2610 scf/stb oil production decreased by 3.17% at water-cut of 5% and 9.5% at
water-cut of 25%. All things being equal, the percentage reduction in production reduces as GOR
increases from 2610 to 5635 scf/stb for all the tubing sizes used.
i
ACKNOWLEDGEMENT
I thank the Almighty God for giving me the strength and ability to complete my master programme
successfully. I would also like to thank the members of my graduate committee for their earnest
contribution, support and time.
I would like to acknowledge the advice, supervision, guidance and financial support of Professor Dulu
Appah throughout my entire work.
I thank the African University of Science and Technology for providing and making available the
necessary facilities which facilitated my research with much less stress.
Finally, I would like to thank my parents, Mr and Mrs Parker and my siblings, Adelaide, Benjamin and
Nancy for their unceasing prayers and encouragement.
ii
TABLE OF CONTENTS
Content Page
ABSTRACT .......................................................................................................................................... i
ACKNOWLEDGEMENT ................................................................................................................... ii
CHAPTER 1......................................................................................................................................... 1
INTRODUCTION ................................................................................................................................ 1
CHAPTER 2....................................................................................................................................... 12
iii
2.3 Optimization Approach ............................................................................................................... 15
CHAPTER 3....................................................................................................................................... 16
METHODOLOGY ............................................................................................................................. 16
3.2 Future inflow performance relationship (IPR) for an oil well .................................................... 21
CHAPTER 4....................................................................................................................................... 24
CHAPTER 5....................................................................................................................................... 47
APPENDIX A .................................................................................................................................... 48
APPENDIX B .................................................................................................................................... 49
NOMENCLATURE ........................................................................................................................... 52
REFERENCES ................................................................................................................................... 54
iv
LIST OF FIGURES
Page
v
LIST OF TABLES
Page
Table 4.2a Available PVT Data for predicting oil reservoir performance ........................................... 28
Table 4.2b Data generated from PVT data in table 4.2a ....................................................................... 29
Table 4.2c Continuation of Data generated from PVT data in table 4.2b ............................................ 30
Table 4.3a Operating point for various tubing diameters at a GOR of 840 scf/stb .............................. 33
Table 4.3b Operating point for various tubing diameters at a GOR of 1052 scf/stb ............................ 34
Table 4.3c Operating point for various tubing diameters at a GOR of 1453 scf/stb ............................ 35
Table 4.3d Operating point for various tubing diameters at a GOR of 2610 scf/stb ............................ 36
Table 4.3f Operating point for various tubing diameters at a GOR of 5635 scf/stb ............................. 38
Table 4.4a Variation in production rate and pressure with GOR range of 840-1052 scf/stb ............... 39
Table 4.4b Variation in production rate and Pressure with GOR range of 1052-1453 scf/stb ............. 39
Table 4.4c Variation in production rate and Pressure with GOR range of 1453-2610 scf/stb ............. 39
Table 4.4d Variation in production rate and pressure with GOR range of 2610-3444 scf/stb ............. 39
Table B.1 Data generated from PVT data in table 4.2a using Tarner method ...................................... 49
Table B.3a Data generated from PVT data in table 4.2a using Muskat method................................... 50
Table B.3b Continuation of data generated from PVT data in table B.3a ............................................ 50
vi
CHAPTER 1
INTRODUCTION
Production optimization identifies the opportunities to increase production and reduce operating
costs. The overall goal is to achieve the optimum profitability from the well. To achieve and
maintain this, it is essential to evaluate and monitor different sections of the production system
including, the wellbore sandface, reservoir, produced fluids, production equipment on surface
and downhole. Several methods are being used for production optimization. The most common
and widely used method is the system analysis approach commonly known as nodal analysis.
Optimization of the wellbore is considered mainly during well completion stages. Tubing joints
vary in length from 18 to 35 feet although the average tubing joint is approximately 30 feet.
Tubing is available in a range of outer diameter sizes. The most common sizes are 2 3/8-in, 2
7/8-in, 3 1/2-in and 4 1/2-in. The API defines tubing as pipe from 1-in to 4 1/2-in OD. Larger
diameter tubulars (4 1/2-in to 20-in) are being termed casing. (Schlumberger, 2001)
The flow rate per well is the key parameter. It governs the number of wells that need to be drilled
to achieve the optimum economic output of the field. The first parameter that needs to be
considered in the tubing string selection is the nominal tubing diameter. The grades of steel and
nominal weight are chosen based on the stress the tubing will have to withstand during
production. Thirdly, depending on the how corrosive the existing and future effluents, the type of
connection and the metallurgy are selected. In fact the different stages mentioned above overlap
and sometimes make the choice of tubing a difficult job. In the determination of the nominal pipe
diameter, the nominal diameter through the weight governs the inside through diameter of the
pipe. The flows that can pass through it depend on the acceptable pressure losses but are also
limited by two parameters: the maximum flow rate corresponding to the erosion velocity and the
minimum flow rate necessary to achieve lifting of water or condensate. Tubings with diameter
less than 2 7/8-in are mostly reserved for operations on well using concentric pipe and are termed
macronic string. Note also that the space required by couplings of the tubing limits the nominal
tubing diameter that can be run into the production casing. (Perrin, et al., 1999)
1
1.1 Vertical Lift Problems relating to tubing
In lieu of the usefulness of tubing strings in oil and gas production, it can have some limitations.
Tubing wear occurs most often in pumping wells. It depends little upon whether the hole is
vertical or slanting, but it is much worse in dog-legged holes regardless of the deviation. It may
either be external or internal. If external, it is usually the couplings which are affected and the
cause is the rubbing against the inside of the casing in phase with the reversing strokes of the
sucker rods. If the wear is internal, it is caused by the sucker rods. There can be leakage from the
inside to the outside or vice versa. This can be attributed to the API thread shape used (the V-
shaped or round thread shape.) The tubing string can be flattened from wall to wall by either
having a higher hydrostatic pressure or as a result of diastrophic shifting of formation caused by
an earthquake. Since some 90 percent of all oil-well tubing is upset design, practically all failures
are in the body of the pipe. However, any tension failures are rare because tubing is almost
always run inside of casing and except for occasional trouble of unseating packers; it seldom
becomes stuck and therefore needs not be pulled on. As with upset casing, upset tubing will
stretch before failing. The tubing will burst when the pressure inside the tubing string is higher
than the pressure in that annulus. This tubing trouble is commonly seen in high pressure wells
and can be exceeding serious. (Hexter, 1955)
2
1.2 Pressure Drop across Production System
Gas
Pwh 4 Sales Line
Psep
STOCK TANK
3 2
ΔPT
Pwf 2 Pwfs 1
f
3
Integrating the production system component helps to design a well completion or predict the
production ratio properly. Since the tubing section in Figure 1.1 contributes to about 80% of the
total pressure drop in the production system, much research should be carried out in that area in
order to reduce the pressure drop. The pressure drops in the tubing section are mainly frictional
pressure drop and hydrostatic pressure drop. The last pressure drop which is due to acceleration
is usually neglected because it is negligible.
(1.1)
(1.2)
Many correlations have been developed in the last 30 and 40 years for predicting two-phase
flowing pressure gradient in producing wells. Due to the limitations and the availability of some
for these correlations, Beggs and Brill was used for prediction in this study. (Beggs, 2003)
The optimization process requires the knowledge of inflow performance relationship, the tubing
performance relationship and the behaviour of the produced gas-oil-ratio.
The inflow performance relationship of a well is a relationship between its producing bottomhole
pressure and it corresponding production rates under a given reservoir condition. The
preparations of inflow performance relationship curves for oil and gas wells are extremely
important in production system analysis. Unless some idea of the productive capacity of a well
can be established the design and optimization of the piping system of the well becomes difficult.
4
1.3.1 Single Phase Inflow Performance
In a single phase liquid flow, the pressure is above the bubble point pressure. The inflow
performance relationship is usually depicted by a straight line. The IPR equation for this phase is
given as: (Clegg, 2007)
(1.3)
Solution gas escapes from the oil and becomes free gas when the reservoir pressure falls below
the bubble point pressure. During this state of pressure decline, oil and gas (two phase flow)
exists in the whole reservoir. The presence of free gas leads to reduced relative permeability and
increased oil viscosity. The synergies of these two effects result in lower oil production rates.
This makes the IPR curve deviate from linear trend below the bubble point pressure. The two
main widely used empirical correlations for modeling IPR of two phase reservoir are;
(1.4)
The can be theoretically estimated based on the reservoir pressure and productivity index
above the bubble point pressure. (BOYUN, et al., 2007)
(1.5)
(1.6)
5
Where n is an empirical constant related to
Due the unavailability of reservoir parameters for the determining productivity index in the IPR
model, test points are frequently used for constructing IPR curves. Constructing IPR curves
using test points involves back calculation of the constant in the IPR model for single phase
(under-saturated oil) reservoir. The model constant can be determined by using equation (1.3)
For a partial two-phase reservoir, the model constant in the generalized Vogel equation
(equation 1.4) must be determined on the range of tested flowing bottomhole pressure. If the
range of tested flowing bottomhole pressure is greater than bubble point pressure, the model
constant should be determined by equation (1.3). (Boyun, 2007)
If the tested flowing bottomhole pressure is less than bubble point pressure, the model constant
J* should be determined using
(1.7)
6
1.3.4 Future inflow performance relationship for an oil well
For saturated conditions many approximate methods to simulate the effects of depletion on
productivity index for saturated conditions. Usually those methods provide an equation relating
changes in the productivity index J* as a function of reservoir average pressure.
In essence the methods for future reservoir prediction express changes in J* as a function of
changes in average reservoir pressure. In this study a combination of Fetkovich and Vogel
equations were used to predict the future IPRs. (Prado, 2009)
Fetkovich expressed changes in productivity index as a function of changes in average reservoir
pressure as;
(1.8)
Fetkovich also expressed Absolute Open Flow (AOF) as a function of the average reservoir
pressure.
(1.9)
For under-saturated conditions, when the bottom hole flowing pressure is higher than the bubble
point pressure, the flow of fluids in the reservoir is single phase and the linear IPR is valid.
(Prado, 2009)
When the bottom hole flowing pressure is below the bubble point pressure, a modified parabolic
equation is used for the IPR.
(1.10)
(1.11)
7
(1.12)
Productivity index for the saturated part of the IPR is defined as:
(1.13)
(1.14)
(1.15)
A tubing performance may be defined as the behaviour of a well in giving up the reservoir fluids
to the surface. The performance is commonly showed as a plot of flowrate versus bottomhole
flowing pressure. This plot is called the tubing performance relationship (TPR). For a specified
wellhead pressure, the TPR curves vary with diameter of the tubing. Also, for a given tubing
size, the curves vary with wellhead pressure. For single-phase liquid flow, pressure loss in tubing
can be determined using a simple fluid flow equation for vertical pipe, or using some graphical
pressure loss correlations where available with GLR = 0. Tubing performance curves are used to
determine the producing capacity of a well. By plotting IPR and TPR on the same graph paper, a
stabilized maximum production rate of the well can be estimated. (Lyon, 2010)
Increasing GOR lightens the mixture density and thereby reduces the pressure loss due to
hydrostatic forces. Larger gas quantities usually result in larger pressure losses due to friction.
8
The GOR is considered critical when the producing GOR is equal to or greater than three times
the solution GOR (Rsi), that is (GOR ≥ 3Rsi) for producing oil well that is not on gas lift. (Slider,
1983)
(1.16)
The produced GOR is constant above the saturation pressure. However, once the gas saturation
has reached a point that the free gas in the reservoir begins to flow, the behaviour of the gas-oil -
ratio becomes more complicated. The produced gas-oil-ratio, R at any particular time is the ratio
of the standard cubic feet of gas being produced at any time to stock-tank barrels of oil being
produced at that same instant. (Slider, 1983)
(1.17)
The term can be expanded using the radial flow equation as:
(1.18)
Writing and in terms of the above equation applied at the wellbore with the rates
corrected from reservoir volumes to scf and stb, respectively, yields an expression for reservoir
flowing GOR and the produced GOR:
(1.19)
9
(1.20)
(1.21)
The ratio of the effective permeabilities in the above equation is the same as the ratio of the
relative permeabilities which is a function of the liquid saturation. In order to determine the
relative permeability ratio and the produced gas oil ratio, it is necessary to evaluate the oil
saturation corresponding to any cumulative oil production. (Slider, 1983)
The oil saturation is the remaining reservoir barrels of oil in the reservoir, , divided
by the reservoir pore volume in barrels. The pore volume can be determined from the initial oil
saturation, and the original reservoir barrels of oil in the reservoir, . Thus the
material balance expression for the oil saturation is written as:
(1.22)
The proper selection, design, and installation of tubing string are critical parts of any well
completion. Tubing strings must be sized correctly to enable the fluids to flow efficiently or to
permit installation of effective artificial lift equipment. The optimum tubing size is selected to
obtain the desired production rates at the lowest capital and operating costs. This usually means
at the maximum initial flow rate and maintaining it as long as possible. Whatever the case, the
selection process inevitably involves analysis of the gross fluid deliverability and flow stability
under changing reservoir conditions to confirm that the production forecast can be met.
A tubing string that is too small causes large friction losses and limits production. It also may
severely restrict the type and size of artificial lift equipment. A tubing string that is too large may
10
cause heading and unstable flow, which results in loading up of the well and can complicate
workover operations. As previously mentioned, the changing conditions over the life of the well
must be considered when selecting tubing size. These changes are normally declining reservoir
pressure, increasing water cut and Gas Oil Ratio which will reduce flow rates. Water production
is rarely observed in the early and mid-stages of production. However GOR production is likely
to occur during the early stage as well as throughout the life of the well. High Gas Oil Ratio
(HGOR) is a situation where the produced GOR is equal to or three times higher than the initial
GOR. When this occurs it will lead to unstable flow and thus hinder production forecast. This
trend is downwards towards cessation of flow and, obviously the tubing selected for the start of
production will not be the optimum size after some period of time.
1.7 Objectives
1.8 Methodology
11
CHAPTER 2
LITERATURE REVIEW
Systems analysis, which has been applied to many types of systems of interacting components,
consists of selecting a point or node within the producing system (well and surface facilities).
Equations for the relationship between flow rate and pressure drop are then developed for the
well components both upstream of the node (inflow) and downstream (outflow). The flow rate
and pressure at the node can be calculated since flow into the node equals flow out of the node
and only one pressure can exist at the node. Furthermore, at any time, the pressures at the end
points of the system (separator and reservoir pressure) are both fixed. Thus:
12
Typical results of such an analysis are shown in Figure 2.1 where the pressure-rate relationship
has been plotted for both the inflow (Equation 2.1) and outflow (Equation 2.2) at the node. The
intersection of these two lines is the (normally unique) operating point. This defines the pressure
and rate at the node. This approach forms the basis of all hand and computerized flow calculation
procedures. It is frequently referred to as Nodal analysis.
The use of systems analysis to design a hydrocarbon production system was first suggested by
Gilbert (1954). Gilbert performed a sensitivity analysis to determine an approximate solution for
natural flow and gas-lift problems for 1.9-in, 2 3/8-in, 2.785-in and 3 1/2-in API tubing sizes and
crude oils with API gravity ranging from 25 to 40 API. He also explains the hydraulics of natural
flow as well as summarizing the methods for estimating individual well capabilities using the
same set of API tubing sizes. The author has prepared a very useful tool for the solution of
problems relative to flow of oil, gas, and water in a tubing string.
Brown and Lea run a production optimization using a computerized well model. This
computerized well model has contributed to improving completion techniques, for better
efficiency and higher production with many wells. The optimization was carried out for gravel
packed well as well as perforated wells.
Tubings were evaluated for a well to gravel packed. The IPR curve was prepared using Darcy’s
law including the additional turbulence pressure drops. The Gulf Coast well was considered for
this experiment. Tubing sizes of 2 7/8-in 3 1/2-in and 4 1/2-in are evaluated at the wellhead
pressure of 1200 psi needed to flow gas into the sales lines. From the analysis 4 ½-in tubing is
selected.
For the perforated well a sample oil well with low GOR, a low bubblepoint pressure, and
assumed single-phase liquid flow across the completion was analyzed. The reason for this
selection is that current technology has offered solutions only for single-phase flow across such
completions. When two-phase flow occurs across a gravel-packed or a standard perforated well,
relative permeability effects must be considered. The IPR curve was prepared with Darcy’s law,
13
assuming no pressure drop across the completion. Tubing performance curve was plotted for 2
3/8-in, 2 7/8-in and 3 1/2-in- -in tubing. Assuming 3 1/2-in-in tubing is selected, transfer it
pressure drop curve. Using the appropriated equations from Mcleod and as discussed by Brown
et al., the pressure drops across the available completions were determined. A final plot is
constructed to show the importance of perforating underbalanced.
Rafiqul Awal et al develop a new nodal analysis technique which helps improve well completion
of matured oil field. They proposed the use of a simple, tapered tubing string completion (using
larger internal diameter ID tubing pipes in the upper sections) that can be customized for specific
reservoirs. They employed nodal analysis technique to develop an equivalent tubing diameter
(ETD) concept. The ETD allow for comparing the well performance for single – ID tubing. The
procedure also seeks an optimum length for the larger tubing ID in the upper section. This
method had limitations as it was suitable for wells with moderate to high open flow potential. It
is suited for low GOR wells with high future water-cut. The technique was to reduce or eliminate
the high capital cost of investing into waterflooding or any other Enhanced oil recovery method.
The experiment was carried out by firstly using a mono tubing completion using five tubing ID
sizes: 1.995-in, 2.441-in, 2.992-in, 3.476-in and 3.958-in. The well performance graphs produced
showed that for water-cut ranging from 50% to 60%, the stabilized gross liquid rate increase with
tubing size until 3.476-in. The reserve at 3.958-in indicating the optimum tubing diameter lies
between the 3.476-in and 3.958-in
Next, we show the nodal analysis results for the Duplex Tapered Internal Diameter Tubing
Completion TIDC realizations. The TIDC realizations shown were very simple, i.e., the depth
intervals for various tubing sizes in a TIDC completion are equal. The result showed that the
Duplex TIDC gives significantly higher gross liquid rates at all three water-cut values. The
optimization process was carried out by choosing several values for length of the upper tubing
section, and comparing the stabilized flow rates. It reveals the optimum length of the upper
section (larger ID, 3.958-in.) to be 3,600-ft, which much shorter than the smaller ID (3.476-in.),
lower section: (9,990 – 3,600) ft = 6,390-ft.
In the foregoing duplex TIDC optimized solution, the economic gains are significant, given the
high oil price. The duplex TIDC gives increased gross fluid rates as follows:
14
• 10 to 15% compared to the 3.476-in. mono tubing completion, and
• 10 to 30% compared to the 3.958-in. mono tubing completion, over the water-cut range of
50 to 70%
This work looks closely at the application of nodal analysis to oil wells with high GOR. Analysis
of the behaviour of GOR produced on production rate is coupled with variation of water-cut at
HGOR conditions.
15
CHAPTER 3
METHODOLOGY
Planning the development of a reservoir with respect to sizing equipment and planning for
artificial lift as well as evaluating the project form an economics point of view, requires the
ability to predict reservoir performance in the future. The reservoir PVT data must be available
in order to predict the primary recovery performance of a depletion-drive reservoir in terms of
Np and Gp. These data are: initial oil-in-place, hydrocarbon PVT, initial fluid saturation, and
relative permeability. All the methods used to predict the future performance of a reservoir are
based on combining the appropriate material balance equation (MBE), with instantaneous GOR
using a proper saturation equation. However the prediction is narrowed only to the instantaneous
GOR. The calculations are repeated at a series of assumed reservoir pressure drops. There are
several techniques that were specifically developed to predict the performance of the solution gas
drive reservoir. These methods include Tarner’s method, Tracy’s method and Muskat method,
Tarner (1944) pointed out that the Np1 and Gp1 are set equal to zero at the initial reservoir
pressure that is at bubble point pressure. He computed based on the assumed using
equation (3.1)
– – (3.1)
For each of Npn assumed, a corresponding So was determined using equation (2.7). From the So
determined, calculate Sg using equation (3.2) and using the field data Sgversus kg/koin appendix
A determine kg/ko
(3.2)
16
Calculate the instantaneous Gas Oil ration (Rn) using equation (2.6)
Checking the validity of the assumed Np necessitates the need to calculate the Gp again using
equation. (3.3). if the new calculated Gp agrees with the previous Gp then the assumed Np is
correct. This sequence is repeated for the subsequent pressures.
(3.3)
If there are difficulties in the guessing of the cumulative oil production equation (3.4) can be
used.
(3.4)
Tracy (1955) suggests that the general material balance equation can be rearranged and
expressed in terms of two functions of PVT variables for depletion drive reservoir without water
influx. Following equation is based on an initial oil in place of 1 STB
(3.5)
Where
(3.6)
(3.7)
17
4. Calculate the average instantaneous GOR using equation (3.8)
(3.8)
(3.9)
(3.10)
7. Calculate the oil and gas saturation at selected average reservoir pressure
8. Obtain relative permeability ratio Krg/kroat Sg
9. Calculate the Instantaneous GOR from equation (2.6)
10. Compare the estimated GOR in step (3) with the calculated GOR in step (10). If the
values are within acceptable tolerance proceed to next step. If not within the tolerance set
the estimated GOR equal to the calculated GOR and repeat the calculation from step (2).
11. Calculate the cumulative gas production
(3.11)
12. Since results of the calculations are based on 1 STB of oil initially in place, a final check
on the accuracy of the prediction should be made on the MBE and repeat the calculation
from step 1
= 1±Tolerance (3.12)
18
3.1.3 Muskat Method
Muskat (1946) expressed the material balance equation for a depletion-drive reservoir in
following differential form:
(3.13)
Craft, Hawkins, and Terry (1991) suggested the calculations can be greatly facilitated by
computing and preparing in advance in graphical form the following pressure dependent groups:
(3.14)
(3.15)
(3.16)
Introducing the above pressure dependent terms into Equation (3.14) gives
(3.17)
19
Craft et al, 1991 proposed the following procedure for solving Muskat’s equation for a given
pressure drop.
The following procedure was adopted
1. Prepare a plot of krg/kro versus gas saturation
2. Plot Rs, Bg and (1/Bg) versus pressure and determine the slope of each plot at selected
pressures , that is dBo/dp, dRs/dp and d(1/Bg)/dp
3. Calculate the pressure dependent terms X(p), Y(p) and Z(p) that correspond to the
selected pressures in step 2.
4. Plot the pressure dependent terms as a function of pressure.
5. Graphically determine the values of X(p), Y(p) and Z(p) that corresponds to the pressure
p.
6. Solve equation (3.17) for (dSo/dp) by using the oil saturation So* at the beginning of the
pressure drop interval p*
7. Determine the oil saturations So at the average reservoir pressure using equation (3.18)
(3.18)
8. Using the So from Step 7 and the pressure p, recalculate (dSo/dp) from equation 3.17
9. Calculate the average value for (dSo/dp) from the two values obtained in step 6 and 8 or;
(3.19)
(3.20)
20
11. Calculate gas saturation Sg by
(3.21)
12. From equation (2.7) , solve for the cumulative oil production
(3.22)
13. Calculate the cumulative gas production Gp using equation (3.22) and repeat steps 5
through 13 for all pressure drops.
(3.23)
These prediction methods were compared and series of graphs were constructed to select the best
method. A plot of GLR versus GOR was constructed using various water cut ratios (15%, 20 %
and 25%).
Several correlations have been developed for predicting future inflow performance relationships
curves (IPRs). In this study a combination of Fetkovich and Vogel Equation was used to predict
the future IPRs.
1. Using Beggs and Brill (1978 ), estimate the bubble point pressure, Pb for the current GLR
21
2. Calculate and it corresponding using the equations (3.24) and (3.25) respectively
at the average reservoir pressure.
(3.24)
(3.25)
The qb below the bubble point pressure and at the bubble point pressure is zero. Above the
bubble point pressure, is determined by using equation (3.24). Below the bubble point
pressure the is based on previous and pressure and determined by using equation
(3.25)
(3.26)
4. Calculate for the productivity index J* and for the bubble point pressure Pb
(3.27)
5. Generate a pressure profile below the bubble point pressure and calculate the
corresponding and J* using Fetkovich correlations.
6. Plug in the first average reservoir pressure and it corresponding in the IPR
program.xls to generate the IPR.
7. Repeat steps 6 and 7 for all the generated in 5 to generate their IPR’s.
22
3.3 Construction of TPR curves
Using the Beggs and brill spreadsheet, the generated flowrates and it corresponding pressures
were used to construct the outflow performance relationship (OPR) or TPR curve. To achieve
that, a range of tubing sizes (2 3/8-in, 2 7/8-in, 3 1/2-in and 4 -in) were selected. The tubing
diameter, estimated GOR, depth of the well, wellhead pressure, reservoir pressure and fluid
properties were kept constant while changing the oil flowrate. The watercut was assumed to be
zero in the first instance and later varied with equal interval. For each flowrate used a pressure is
recorded at the node. This method was used to construct TPR curves for all the tubing string
sizes considered in this study.
23
CHAPTER 4
In this chapter the nodal analysis described in chapter two is applied for various instantaneous
GORs and water cuts. The results obtained from the sensitivity analysis are presented in this
chapter.
4.1 Results
Tables 4.4a to 4.4e show the variation in oil production rate as well as pressure for a particular
range of GOR. The red coloured numbers in Tables 4.3a to 4.3f signify an increase in either the
production rate or bottomhole flowing pressure. The blue coloured numbers in Tables 4.3a to
4.3f signify a decrease in either the production rate or bottomhole flowing pressure. Tables 4.3a
to 4.3f show the operating points of the various tubing sizes at specific reservoir pressure and
GOR.
24
A comparison of GOR estimated by the three predictive methods as described in chapter 3 is
presented in Figure 4.1.
7000
6000
5000
GOR (SCF/STB
4000
Tracey
3000
Tarner
2000 Muskat
1000
0
3000 2500 2000 1500 1000 500 0
Pressure, Psi
Figure 4.1 Variation of GOR with Pressure using Tracy, Tarner and Muskat Methods.
25
6000
Tracy wc (15%)
5000 wc (20%)
4000 wc (25%)
GLR (SCF/STB)
3000
2000
Tracy 15%
1000 20%
25
0
0 1000 2000 3000 4000 5000 6000
GOR (SCF/STB)
Figure 4.2 GLR vrs GOR at varying water cut ratios. (Tracy’s method)
Tarner
6000
wc (15%)
5000 wc (20%)
wc (25%)
4000
GLR (SCF/STB)
1000
0
0 1000 2000 3000 4000 5000 6000
GOR (SCF/STB)
Figure 4.3 GLR vrs GOR at varying water cut ratios. (Tarner’s Method)
26
Muskat
7000
wc (15%)
6000
wc (20%)
5000 wc (25%)
GLR (SCF/STB)
4000
Muskat 15%
3000
20%
2000 25%
1000
0
0 1000 2000 3000 4000 5000 6000 7000
GOR (SCF/STB)
Figure 4.4 GLR vrs GOR at varying water cut ratios. (Muskat’s Method)
Table 4.1 Estimated GLR at varying water cut with all the prediction methods
From Table 4.1 all the prediction methods yielded approximately the same GLR at a specific
GOR and water cut. The results presuppose that either of the methods can be used to predict the
instantaneous gas oil ratio for the oil well with much accuracy. Tracy method was selected due to
the fact, the error margin between the estimated and calculated GOR was very small and a zero
27
tolerance was observed for each pressure drop. The only exception is that Muskat method
predicted a much higher GOR of 6304 scf/stb as opposed to the 5800 and 5635 scf/stb of Tarner
and Tracy methods respectively.
Following Tracy’s steps in Chapter three for prediction of produced GOR, the GOR was
estimated. Table 4.2b shows the generated data based on input PVT data in Table 4.2a. A plot of
the produced or instantaneous GOR versus pressure is also showed in Figure 4.3
Table 4.2a Available PVT Data for predicting oil reservoir performance
P Bo Bg Rs Uo/Ug
psi bbl/STB bbl/scf scf/bbl
2500 1.2 0.00069 840
2300 1.195 0.00071 820 28.7
2100 1.19 0.00074 770 32.4
1900 1.185 0.00078 730 36.7
1700 1.18 0.00081 680 42.6
1500 1.175 0.00085 640 47.1
1300 1.17 0.00089 600 53.5
1100 1.165 0.00093 560 60.8
900 1.16 0.00098 520 69.2
700 1.155 0.00102 480 78.6
28
Table 4.2b Data generated from PVT data in table 4.2a
P
Psi Фo Фg Rav ΔNp Np ΔGp
2500 840
29
Table 4.2c Continuation of Data generated from PVT data in table 4.2b
GOR
Gp So Sg kro krg krg/kro (Scf/stb) Tolerance
840
30
The produced GOR using Tracy’s method in Table 4.2c is plotted against it respective
bottomhole pressure pressure in Figure 4.5
6000
5000
4000
GOR SCF/STB
3000
2000
1000
0
3000 2500 2000 1500 1000 500
Pressure Psi
The data generated for Muskat and Tarner methods using the same data in Table 4.1a are
presented in appendix B. Plots of GOR versus pressure for both methods are also presented in
appendix B.
31
The Inflow performance relationship curves in Figure 4.4 were produced by following the
procedure in section 3.2.
3500
3000
IPR 1
2500 IPR 2
IPR 3
Preesure, psi
2000 IPR 4
IPR 5
1500 IPR 6
IPR 7
1000 IPR 8
IPR 9
500 IPR 10
IPR 11
0
0 500 1000 1500 2000 2500 3000
Production rate, stb/day
32
Figure 4.7 to 4.12 shows plots of IPR and TPR for various tubing sizes at specific GOR at a
water cut of zero.
Figure 4.7 Effect of tubing size on production rate at a constant GOR (840 scf/stb)
Table 4.3a Operating point for various tubing diameters at a GOR of 840 scf/stb
33
GOR at 1052 scf/stb
3500
IPR 1
Bottomhole Flowing Pressure,psi
2000
2.875" IPR 4
3.5" IPR 5
1500
4" IPR 6
1000 IPR 7
500 IPR 8
IPR 9
0
0 500 1000 1500 2000 2500 3000 IPR 10
IPR 11
Flowrate,stb/day
Figure 4.8 Effect of tubing size on production rate at a constant GOR (1052 scf/stb)
Table 4.3b Operating point for various tubing diameters at a GOR of 1052 scf/stb
34
GOR at 1453 scf/stb
3500
IPR 2
2500
IPR 3
2.875" IPR 4
2000
3.5" IPR 5
1500
IPR 6
1000 4" IPR 7
IPR 8
500
IPR 9
0 IPR 10
0 500 1000 1500 2000 2500 3000 IPR 11
Flowrate,stb/day
Figure 4.9 Effect of tubing size on production rate at a constant GOR (1453 scf/stb)
Table 4.3c Operating point for various tubing diameters at a GOR of 1453 scf/stb
35
GOR at 2610 scf/stb
3500
IPR 1
Bottomhole Flowing Pressure,psi
3000 2.375"
IPR 2
2.875"
2500 IPR 3
2000 IPR 4
3.5"
IPR 5
1500
4" IPR 6
1000
IPR 7
500 IPR 8
0 IPR 9
0 500 1000 1500 2000 2500 3000 IPR 10
Flowrate, stb/day IPR 11
Figure 4.10 Effect of tubing size on production rate at a constant GOR (2610 scf/stb)
Table 4.3d Operating point for various tubing diameters at a GOR of 2610 scf/stb
36
GOR at 3444 scf/stb
3500
IPR 1
Bottomhole Flowing Pressure,psi
3000 2.375"
IPR 2
2500 IPR 3
2.875"
2000 IPR 4
3.5"
IPR 5
1500
4" IPR 6
1000 IPR 7
500 IPR 8
IPR 9
0
IPR 10
0 500 1000 1500 2000 2500 3000
IPR 11
Flowrate, stb/day
Figure 4.11 Effect of tubing size on production rate at a constant GOR (3444 scf/stb)
Table 4.3e Operating point for various tubing diameters at a GOR of 3444 scf/stb
37
GOR at 2610 scf/stb
3500
IPR 1
Bottomhole Flowing Pressure,psi
3000 2.375"
IPR 2
2.875"
2500 IPR 3
2000 IPR 4
3.5"
IPR 5
1500
4" IPR 6
1000
IPR 7
500 IPR 8
0 IPR 9
0 500 1000 1500 2000 2500 3000 IPR 10
Flowrate, stb/day IPR 11
Figure 4.12 Effect of tubing size on production rate at a constant GOR (5653 scf/stb)
Table 4.3f Operating point for various tubing diameters at a GOR of 5635 scf/stb
38
Table 4.4a Variation in production rate and pressure with GOR range of 840-1052 scf/stb
Table 4.4b Variation in production rate and Pressure with GOR range of 1052-1453 scf/stb
Table 4.4c Variation in production rate and Pressure with GOR range of 1453-2610 scf/stb
Table 4.4d Variation in production rate and pressure with GOR range of 2610-3444 scf/stb
39
Table 4.4e Variation in production rate and Pressure with GOR range of 3444-5635 scf/stb
1200
1000
Flowrate, stb/day
800
IPR1
600
IPR2
400
IPR5
200
0
600 1600 2600 3600 4600 5600 6600
GOR, scf/stb
40
2 7/8" TUBING SIZE
1800
1600
1400
Flowrate, stb/day
1200
1000
800 IPR1
600 IPR2
400 IPR5
200
0
600 1600 2600 3600 4600 5600 6600
GOR, scf/stb
2000
Flowrate, stb/day
1500
IPR2
1000
IPR5
500 IPR1
0
600 1600 2600 3600 4600 5600 6600
GOR, scf/stb
41
4" TUBING SIZE
2500
2000
Flowrate, stb/day
1500
IPR1
1000 IPR2
IPR5
500 IPR6
0
600 1600 2600 3600 4600 5600 6600
GOR, scf/stb
700
650
Flowrate stb/day
600 wc = 0
550 wc = 20%
500 wc = 5%
450 wc = 25%
400
2 2.5 3 3.5 4 4.5
Tubing diameter , in
42
3444 scf/stb and IPR5
750
700
650
Flowrate, stb/day
600
wc = 0
550 wc = 5%
500 wc = 20%
wc = 25%
450
400
2 2.5 3 3.5 4 4.5
Tubing diameter, in
650
wc = 0
600
wc = 5%
550
wc = 20%
500
wc = 25%
450
400
2 2.5 3 3.5 4 4.5
Tubing diameter, in
43
4.2 Discussion
The two major components of production optimization (cost and reduction in pressure losses)
can be positively influenced by acting on the analysis and recommendation of this study. In the
analysis of the behaviour of the produced GOR on tubing performance, equal numbers of Low
and High GOR values were selected.
From Figure 4.5, tubing performance curves for (2 3/8-in, 2 7/8-in, and 3 1/2-in) tubing sizes
intersect IPR1 and IPR4 curves making tubing selection feasible. The 4-in tubing performance
curve intersect IPR1 to IPR3 curves. Moving closer to IPR5, the TPR curves for (2 3/8-in, 2 7/8-
in, and 3.1/2-in) tubing sizes converge. The bigger tubing size (4-in) cannot be used to produce
the well at lower IPR curves (IPR4 and IPR5). Considering the IPR1 curve, the 4-in tubing size
can produce as high as 2100 stb/day at a bottomhole pressure of 1375 psi whereas the 2 3/8-in
produces 1310 stb/day at a much higher bottomhole pressure of 2090psi. The bottomhole
pressure tends to decrease with increasing tubing diameter.
As GOR increases from 840 scf/stb to 1052 scf/stb in Figure 4.6, a shift in the tubing curves to
the right is observed associated with an increase in oil production. From table 4.4a it can be seen
that for all the tubing sizes used the more bottomhole pressure reduces the greater the percent
increase in oil production rate. Considering the IPR1 curve, 2 7/8-in tubing size experienced the
highest pressure drop associated with the highest percent increment in production.
The same trend was observed when the GOR increased from 1052 to 1453 scf/stb. The only
exception was 1.5% reduction in production rate at for 2.3/8-in tubing size when it intersect the
IPR1 curve. Considering IPR2 and for the same range of GOR, 4-in has the highest production
rate increase followed by 3 1/2-in with a corresponding pressure drop of 80psi and 130psi
respectively. There was no pressure drop using 2 7/8-in yet there was a potential gain in
production.
44
From table 4.4a to 4.4b, it was observed that as GOR increases, bottomhole pressure decreases
associated with an increase in oil production rate. This phenomenon is mainly valid for low GOR
cases.
From Figure 4.8, a slight shift of the tubing curves to the left side is observed. This is associated
with decrease oil production. At a GOR of 2610 scf/stb, production can be feasible and extended
to the IPR5 curve.
Moving from the region of LGOR to HGOR a decrease in production rate is observed due to the
increase in bottomhole pressure. For a GOR range of 1453 to 2610 scf/stb and IPR5 curve, there
is a percent decrease in production using 2 3/8-in, 2 7/8-in and 3 1/2-in tubing sizes. As the GOR
increases further, the more the rise in bottomhole pressure causing much more decrease in
production. For a GOR ranges of 2610 to 3444 scf/stb and 3444 to 5635 scf/stb, the 4-in tubing
size can be still be used to produce a substantial quantity of the oil at lower reservoir pressures.
From table 4.4d to 4.4e, it is observed that as GOR increases, bottomhole pressure increases with
an associated decrease in oil production rate. This phenomenon is mainly valid for HGOR cases.
The analysis of the two cases of GOR condition shows that there is a point for each tubing size
where production rate begins to decline. Considering IPR1 and IPR 2 in Figure 4.13 there is a
sharp gradual increase in production rate. The production rate tends to decrease when the GOR
increases beyond 1500 scf/stb. The production rate beyond the critical point for IPR5 seems to be
fairly constant. From Figure 4.14, the same trend in Figure 4.13 was observed for 2 7/8” tubing
size. From Figures 4.15 and 4.16 the critical point for 3 1/2” and 4” tubing sizes varies for
different IPR curves and the critical point is also not distinct. Production using 4” tubing size
with the Lower IPR curves (IPR5 and IPR6) will be only possible beyond a GOR of 2600 scf/stb.
45
4.2.4 Effect of water cut in HGOR condition
The onset of water production can affect the production rate. The extend to which it affect
production rates depends on the operation GOR, and the water cut as well as the tubing size
used. From Figure 4.17 to 4.19, production rate tends to decrease with increasing water cut
ratios. The 2 3/8-in tubing size can no longer produce the well at a water cut of 25% and a GOR
of 2610 scf/stb. Production with 2 3/8-in tubing size is hindered as GOR increases from 2610
scf/stb to 5635 scf/stb. On the other hand, the tubing sizes ranging from 2 7/8-in to 4-in can
comfortably produce the well in these conditions.
46
CHAPTER 5
5.1 CONCLUSION
The results for the oil production trends indicate that GOR production adds some value to
production. It is obvious that the GOR produced as the reservoir pressure declines cannot be
controlled and as such it is imperative to run a sensitivity analysis for all the available tubing
sizes ascertain which tubing sizes gives an appreciable potential gain in production. Tracy’s
method was selected as the best among the three produced GOR prediction methods. The result
from this study will also serve as a guide in choosing the optimum tubing size during completion
stages or at a point in the life of the well and in the gas lift planning.
In HGOR case, potential gain in oil production is hindered and as such the necessary measures
can be adopted to remedy or mitigate the situation.
The results from this sensitivity analysis showed that there is always a critical point beyond
which there is a net decrease in the oil production rate for all the tubing sizes. The critical point
is a function of the tubing size used as well as the current well condition (GOR).
Finally the production of water at any stage of the well irrespective of the percentage also
contributes adversely to reducing the oil production rate. All things being equal, the percentage
reduction in production reduces as GOR increases from 2610 to 5635 scf/stb for all the tubing
size used.
5.2 RECOMMENDATION
Due to the limitations of Beggs and Brill, new nodal analysis software such as PROSPER,
Wellflo and Snap can be used to carry out this sensitivity analysis with higher level of accuracy.
47
APPENDIX A
Kro kro
Expon. (kro)
y = 0.500035e-11.157176x
R² = 1.000000
0.1
0 0.02 0.04 0.06 0.08 0.1 0.12
Sg
0.1
R² = 1
0.01 y = 0.730678x1.892000
Krg
Krg 0.001 Power (Krg)
0.0001
0.00001
0 0.02 0.04 0.06 0.08 0.1 0.12
Sg
48
APPENDIX B
Table B.1 Data generated from PVT data in table 4.2a using Tarner method
Gp
P Np (MMSCF) So Sg kro krg krg/kro R obs R cal
2500 840 840
2300 117502 143.768 0.626558 0.023442 0.038496 0.000602 0.015643 1576 1576
2100 103061 286.469 0.626474 0.023526 0.03846 0.000606 0.015765 1600 1591
1900 88457 397.463 0.626397 0.023603 0.038427 0.00061 0.015876 1600 1616
1700 99916 564.210 0.621758 0.028242 0.036488 0.000857 0.023479 2100 2139
1500 95734 686.960 0.619849 0.030151 0.035719 0.00097 0.027144 2400 2409
1300 96146 814.354 0.61714 0.03286 0.034656 0.001141 0.032922 2912 2914
1100 98207 943.993 0.614148 0.035852 0.033518 0.001345 0.040141 3600 3615
900 101382 1076.776 0.610968 0.039032 0.03235 0.00158 0.048844 4500 4518
700 104113 1208.654 0.607869 0.042131 0.03125 0.001826 0.058427 5800 5682
5800
4800
GOR, SCF/STB
3800
2800
1800
800
3000 2500 2000 1500 1000 500
Pressure psi
49
Table B.3a Data generated from PVT data in table 4.2a using Muskat method
Table B.3b Continuation of data generated from PVT data in table B.3a
50
Figure B.4 Variation of pressure and instantaneous GOR calculated by Muskat method.
7000
6000
5000
GOR, SCF/STB
4000
3000
2000
1000
0
3000 2500 2000 1500 1000 500
Pressure, psi
51
NOMENCLATURE
d = pipe diameter, L, in
Permeability of gas, md
Permeability of Oil, md
Effective Permeability
52
is the average reservoir pressure, psi
Gas Saturation
Oil Saturation
gas viscosity, cp
Viscosity of Oil, cp
53
REFERENCES
Beggs, D.H., Production Optimization using Nodal Analysis, Second Edition, OGCI and
Petroskills Publications Tulsa, Oklahoma, pp.92 – 95, 2003.
Brown K.E. et al., Production Optimization of Oil and Gas Wells by Nodal Systems Analysis,
Technology of Artificial Lifts methods, Pennwell Publishing Co, Tulsa, 1984.
Brown K.E. and Lea J.F., Nodal Analysis of Oil and Gas Wells, 1985.
Lea J.F. and Brown K.E., Production Optimization using a computerized well model, 1986.
Mcleod, H. O., The Effect of Perforating conditions on well Performance. J. Pet. Tech.,
January, 1983.
Perrin, D., Caron, M. and Gaillot, G., Well completion and servicing: oil and gas field
development techniques, 1999.
Prado M., IPR Two Phase Flow, the University of Tulsa, 2009.
54
Slider, H, Worldwide Practical Petroleum Reservoir Engineering Method, pp. 457-458,
1983.
55