Escolar Documentos
Profissional Documentos
Cultura Documentos
Matthias Groppe
CRANFIELD University
m.groppe@cranfield.ac.uk
Sponsored by
ENRI Tokyo, JAPAN
ENRI International Workshop5on
March 2009
ATM/ CNS Matthias Groppe 5 March 2009
EUROCONTROL & FRAPORT
Outline
Conclusion
One Process
Requirements
Principle
Foundation for CDM
Right info Right Time Right People
Requirement
One Common Information Platform is required
Develop procedures and actions for each milestone
Benefits
Brings partners together Promotes trust
Data INBOUND
coherency
check FIR Entry/ Taxi In
Local Radar Data (EXIT)
ALDT TURN-ROUND
ATOT
1 2 3 4 5 6 ARDT
11
Final Boarding ASRT
Approach
OUTBOUND
Take Off from
7/8 9 10 12 13 14 ASAT
Outstation ATC issues
AIBT
AGHT Taxi Out
-2hrs CFMU Slot Final update TSAT (EXOT)
allocation
TOBT
-3hrs Flight Plan 15 16
Submission (FPL) AOBT ATOT
ENRI International Workshop on ATM/ CNS Matthias Groppe 5 March 2009
Airport CDM Key Milestones – TOBT & TSAT
Data INBOUND
coherency
check FIR Entry/
Local Radar Data
ATOT TURN-ROUND
1 2 3 4 5 6 ARDT
11
Taxi In
Final Boarding ASRT
(EXIT)
Approach
ALDT
OUTBOUND
Take Off from
7/8 9 10 12 13 14 ASAT
Outstation
AIBT ATC issues
AGHT Taxi Out
-2hrs CFMU Slot Final update TSAT (EXOT)
allocation
TOBT
-3hrs Flight Plan 15 16
Submission (FPL) AOBT ATOT
ENRI International Workshop on ATM/ CNS Matthias Groppe 5 March 2009
Airport CDM Key Milestones – TOBT & TSAT
Red EOBT/TOBT
notifies AOs
of late flight
Alarms indicate
Airport slot
and type errors
CTOT discrepancies
are also highlighted
Over 21 ECAC
Airports
ENRI International Workshop on ATM/ CNS Implementing
Matthias Groppe 5 March 2009
The A-CDM Turn-Round: Critical Path
Demin. Water
Air Starter
De-icing
E Fueling T
I O
Position Open
B PAX PAX door
stairs
Unload
DAA
Dis-
embark
Dis-
embark
Cabin &
Cockpit
Final
Cleaning
Board CrewCrew CheckBoard PAX Close PAX Remove
Door PAX Stairs B
PAX Crew Catering
T T
Duty Free Stocks
In-flight Entertainment
Position Position Open Unload Unload Load Load Close Remove Remove
wheel Cargo Cargo Bags Cargo Cargo Bags cargo cargo weel
chocks ENRI International Workshop on ATM/ CNS Matthias Groppe door 5 March loader
2009 chocks
The A-CDM Turn-Round: Critical Path
Demin. Water
Air Starter
De-icing
Position Position Open Unload Unload Load Load Close Remove Remove
wheel Cargo Cargo Bags Cargo Cargo Bags cargo cargo weel
chocks door5
ENRI International Workshop on ATM/ CNS Matthias Groppe March loader
2009 chocks
Airport CDM Environment I
Strategic Planning
Strategic Meta
ATC, Aircraft Operator,
Cooperation
Airport, Ground Handler,
ATFCM, Supervisor
LANDSIDE
OPERATION
rm tion
n
io
Ac
at Cooperation
to
Pre-tactical in Planning
fo
e
APOCs
COMMON
nc
In
il
Interactions across
ta
Tactical AWARENESS?
AWARENESS
different layers
Cooperation
Ramp in Action
ATC Agent Pilots Dispatch ….
Ad hoc
actors
DISTRIBUTED SITUATIONAL
AIRSIDE AWARENESS
OPERATION
ENRI International Workshop on ATM/ CNS Matthias Groppe 5 March 2009
Source: Own Model analogous EUROCONTROL (2005) and Hoc (2003)
Airport CDM Environment III
INFORMATION SHARING
APOC:
APOC: Planning - Intermediaries
Level - Distributed Location
INFORMATION
SYNCHRONISATION
Distance to Planning/ Action
Synchronization of information
sharing for time critical decisions
Airport
Pilot/
Operation
Identify decisions necessary Center
Crew
during unanticipated situations
SBB
(4) Organizational & Cooperation Analysis
KBB Role definition
Cooperation: during critical situations
Predefined (3) Strategies Analysis
Information Requirements
IFM
(2) Control Task Analysis
Cognition
(1) Work Domain Analysis
Decision Model
Critical Available
WHAT
Constraints Situations information
HOW
through... for TOBT
WHO Technology
Adherence
Human
Traffic
limitations
Work Domain
Virtual Workspace
ANALYSIS DESIGN
CWA Information
Information//
Relationship
Relationship
Representation
Representation
Design
Design
Storyboard
Storyboard//
Prototype
Prototype
Requirements
Requirements Requirements
Requirements
Criteria
Abstract Criteria
ATTT Milestones
*ATTT
Function Turn-round compliance (STTT vs ATTT) CDM Procedure Group Meetings
*Turn-round compliance (STTT vs ATTT)
TOBT/TSAT Predictability Performance Assessments
*TOBT/TSAT Predictability
EIBT Predictability: EIBT vs time ACISP & A-CDM Partners
*EIBT Predictability: EIBT vs time
*Ready Reaction Time: AOBT - ARDT Ready Reaction Time: AOBT – ARDT User feedback & Performance Assessment
Milestones
Efficient information provision & cooperation between
Provision of reliable information for all CDM partners Functionalability/capability/limitations & status
Physical Collaborative operational decision making
operators & actors
Inform all partners
Distributed Situational Awareness at action level
Function Increasing Situational Awareness Efficient comand & control structure between pretactical &
ACISP & A-CDM Partners
A-CDM Information Sharing Platform (ACISP) Functionalability/capability/limitation
action level of operation
Establish Situational Awareness
Function
Punctuality Travel Passenger WHAT
(Reliability) Time Satisfaction
Compliant Effective
Generalised Safe & efficient
Operator Turn-Round HOW
Usage of available
Function Information
Behavior Procedures
Operators Milestones
Physical Capabilites & Functionability
Function Limitations & Limitations
ACISP &
Physical Airport
Form Infrastructure
YES NO PARTIALLY
Runway in Use x
Behavioral Recommendations x
Economic Cost of planned/ alternative Turn-Round x
Operational Information x
Performance & Status of all participating actors x
CDM Operating Procedures x
Aircraft Requirements & Status x
Information Sharing among participating actors x
Physical turn-round control task support x
Passenger Boarding Time x
Cognitive turn-round control task support x
Environmental Condition Information x
Crew Ramp
Security
Transport Transport
Load
Sheet
Boarding Catering
Parking
Position
APOC
WCH Fuel
CFMU
ATC
Repair
De-
Flight Ramp Boarding
Documents Agent Transportation
Aircraft Crew
Airline Cleaning
De-icing Push-
Back
Ground
Airport
Handler
Infrastructure
Passenger
Fresh Check- Transport
Loading
Water In
Crew Ramp
Security
Transport Transport
Load
Sheet
Boarding Catering
Parking
Position
APOC
WCH Fuel
CFMU
ATC
Repair
De-
Flight Ramp Boarding
Documents Agent Transportation
Aircraft Crew
Airline Cleaning
De-icing Push-
Back
Ground
Airport
Handler
Infrastructure
Passenger
Fresh Check- Transport
Loading
Water In
Crew Ramp
Security
Transport Transport
Load
Sheet
Boarding Catering
Parking
Position
APOC
WCH Fuel
CFMU
ATC
Repair
De-
De-
Flight Ramp Boarding
Documents Agent Transportation
Aircraft Crew
Airline Cleaning
De-
De-icing Push-
Push-
Back
Ground
Airport
Handler
Infrastructure
Passenger
Fresh Check-
Check- Transport
Loading
Water In
Procedure
ActOut
ALERT
Pilots Stations Legend:
States of Knowledge
AP-State
State AP-- Model
report or
request
AP- AP
resulting from data Execution
Execution
ProcessInfo
ProcessInfo
PItoPG processing
Activation PGtoPI
Coordinate
Manipulations
Technical Problem with
A/C Data-processing Activities
- OutAP1 AP-Process
AP- Process InAP1
ENRI International Workshop on ATM/ CNS Matthias Groppe 5 March 2009
(3) Strategy Analysis – Goal Complexity I
Domain 1 Domain 2
(e.g. Airline Cockpit) (e.g. Ground Handler)
Flight
Individual Punctual
Goals
Safety
Goal Ultimate Goals
Dispatch
Goal
C2
C1Routine Subgoals (TOBT) Service
Tasks
Checks Tasks
Delivery
B1 B2 B3
Aircraft Cooperative Planning
A1 A2
Resources
A3Systems
A4 A5 A6 A7 GHD
Resources
Structure/ Process
Group Roles
Tasks
Q & A?