Escolar Documentos
Profissional Documentos
Cultura Documentos
20 Schedule of installation methods of cables for determining current carrying - capacity Cont ...
1:;:::1
cable in conduit or in cable Method - D
ducting in the ground
~ll JI}
wooden joist above a plasterboard Method - 01
ceiling with a minimum U value
D
of 0.1 W/m 2 K and with thermal
insulation not exceeding 100 mm
in thickness
~~
and earth cable in a stud wall with
thermal insulation with a mini-
mum U value of 0.1 W/m 2 K with
the cable touching the inner wall
surface
Q JI} Method - 03
~[~
thermal insulation with a mini-
mum U value of 0.1 W/m 2 k with
the cable not touching the inner
wal I surface
0
II} Method-04