Você está na página 1de 7

600-FKM (FYP1-LB /Rev.

0)

FAKULTI KEJURUTERAAN MEKANIKAL


UNIVERSITI TEKNOLOGI MARA

mee

LOG BOOK
(Record all

FINAL YEAR PROJECT PROGRESS REPORT

PROJECT TITLE

THERMAL ENERGY RECOVERY FROM A GRID CONNECTED


PHOTOVOLTAIC-THERMAL (PVT) SYSTEM
USING AIR AS WORKING FLUID

AMIRUL FAIZ BIN AHMAD YANI


IC NO: 940827-09-5019
STUDENT ID: 2015861454

SEMESTER 01 SESSION 2017-2018


600-FKM (FYP1-LB /Rev.0)

FINAL YEAR PROJECT


BACHELOR ENGINEERING (HONS) MECHANICAL

STUDENT INFORMATION

Semester/Session: 7/2017-2018

Student Name: AMIRUL FAIZ BIN AHMAD YANI

UiTM ID. : 2015831454 IC No. : 940827-09-5019

Email : afaiz.yani@gmail.com No Tel/HP : 014-6449573

Letter Address : 830 Jalan Sungai Kedah, Belat Batu 02600 Arau,
Perlis.

Project Title:

THERMAL ENERGY RECOVERY FROM A GRID CONNECTED


PHOTOVOLTAIC-THERMAL (PVT) SYSTEM
USING AIR AS WORKING FLUID

Supervisor(s):

DR. ALHASSAN SALAMI TIJANI


017-3499193

Prepared by: Haji Razali Hassan, Coordinator FYP1


600-FKM (FYP1-LB /Rev.0)

MEETING DATE BETWEEN STUDENT AND SUPERVISOR

Freq Week Meeting Summary of Discussion Supervisor


. Date Signature

Prepared by: Haji Razali Hassan, Coordinator FYP1


Prepared by: Haji Razali Hassan, Coordinator FYP1
FINAL YEAR PROJECT
SCHEDULE16151413121110987654321ACTIVITY1.2.3.4.5.6.7.8.9.10.11.12.13.14.15.
10.11.12.
600-FKM (FYP1-LB /Rev.0)
600-FKM (FYP1-LB /Rev.0)

WEEKLY ACTIVITIES RECORD DATE: ___/___/2017

Prepared by: Haji Razali Hassan, Coordinator FYP1


600-FKM (FYP1-LB /Rev.0)

Progresss Report No. : 1 / 2 / 3 / 4 / 5 / 6 Week No: ___________ Date : ___/____/ 2017

PLANNING: STATUS: ACTION PLAN:


Describe the activities that you have been (Describe the latest status of your (Describe the steps you should take
planned for this week project progress) to achieve your goals)

Prepared by: Date Received:


Signature of Student: Signature of Supervisor:

______________________ _____________________
Student’s Name: AMIRUL FAIZ Name:

Prepared by: Haji Razali Hassan, Coordinator FYP1


600-FKM (FYP1-LB /Rev.0)

Appendix 1.0

THE POSSIBLE RECORD IN LOG BOOK

 Sketches/doodling  Research findings


 Customer needs/requirements  Sources of ideas
 Class notes  Evaluation of data/results
 Project objectives  Design reviews
 Meeting notes  Decision criteria
 Action Items  Design process
 Half-baked Ideas  Rationale for decisions
 Math calculations  Project reflections
 Work-in-progress  Professional development
 Design alternatives
 Vendor notes

The possible question you can ask and answer after several project activities such as

Meeting
• What were the main outcomes of the meeting?
• Was the meeting productive, and why?
• What are your personal action items before the next meeting?
• Is the team heading in the right direction?

Brainstorming
• Which ideas seem more feasible, and why?
• Are there enough good ideas?
• How could better ideas be developed based on this session?

Engineering Analysis
• What were the governing equations?
• What were the most important findings?
• What do the results mean and how should they be applied?

Visualization
• What are the major features/discoveries and why are these significant?
• What was learned about the problem or solution possibilities?
• What problems were resolved and what still needs to be addressed?
• How does this piece integrate with the whole?

Searching
• What key information did I find? How does it help achieve the project objectives?
• Are there other sources that should be pursued?
• What new questions were generated?

Refer to www.engr.mun.ca/~sbruneau/teaching/.../logbookinstructions.pdf

Prepared by: Haji Razali Hassan, Coordinator FYP1

Você também pode gostar