Union Hydropower Limited

Union Hydropower Limited was established in 2064 B.S. (2007 A.D.) as a private limited company by a highly
esteemed team of Professionals. It went on being public Limited Company in 2072 (2015) with an aim to foster
potential hydropower sector of Nepal. Our central office located in Lalitpur -3, Dhobighat easily accessible and open
during office hours 6 days a week. The authorized capital of our Company is NRs.1000 million & issued capital is
NRs. 750 million.

This company has developed its first project in Lamjung district. Midim Khola (Karapu) 3MW project is on the verse
of operation is financed by Sanima Bank and Sunrise Bank Ltd. Hydro Consult Engineering Pvt. Ltd. (HCE) is the
Design Consultant. High Himalaya Hydro construction, Cream Hydel Pvt. Ltd, Qiankang Allonward Hydro-
Equipment CO. Pvt. Ltd are the Civil, Hydro-Mechanical and Electro-Mechanical contractor respectively.
Potential Investors are Welcomed for Equity and Debt investment in New Projects
Features/Projects Midim Khola HEP Mewa Khola HEP Hongu Khola HEP Upper Tamor A HEP
Q35=17.26,Q40=14.36
Design Discharge(m3/s) Q40=7.3 Q40=3.16 Q40=11.41
, Q45=11.49
Gross Head/Net Head (m) 51.48/49.04 875/879 330/309 800/760
Q35=108,@Q40=90,
Installed Capacity(MW) 3 23 29.6
@Q45=72
Q35=592,@Q40=525,
Energy(GWh) 16.8 135.6 172.5
@Q45=459
Project Cost (NRs, Million) 800 ~ 4894 ~ 6789 ~ 14113
Location (District) Lamjung Taplejung Solukhumbu Taplejung
Feasibility Study Feasibility Study Feasibility Study
Present Status Completed
going on going on going on
Hydro Consult MS Tech Pvt.
Union Hydropower
Consultant Engineering Pvt. Feedback Nepal Limited
Ltd.
Ltd. (HCE)

Union Hydropower Limited. Email: unionhppl@gmail.com


Lalitpur-3,Dhobighat, Nepal.Post Box No. 12637, Kathmandu
Tel: +9771 5525406 Web site: http://www.unionhydropower.com.np