INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO
See See
1.2 Brazing Procedures See SATIP-S-060-08 Copper Piping
Remarks Remarks
RTR & Thermoplastic Installer See See
1.3 See-SATIP-S-070-03 Thermoplastic and RTR Piping
Qualifications Remarks Remarks
See See
2.3 Fire Water/Jockey Pump (If Applicable) See SATIP-G-005-01 Centrifugal Pump
Remarks Remarks
3.0 INSTALLATION
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO
See See
3.3 Cathodic Protection Refer to SATIP-X series as applicable
Remarks Remarks
Hangers and supports Installation SAIC SAIC Contractor & Saudi Aramco shall be notified on start of
3.5
Inspection S-4061 S-4061 W W W this activity for each Building / Area
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO
Location and Spacing Installation SAIC SAIC Contractor & Saudi Aramco shall be notified on start of
3.7
Inspection S-4024 S-4024 W W W this activity for each Building / Area
See See
3.12 Fire Detection and Alarm System See SATIP-B-014-01 Fire Detection / Alarm
Remarks Remarks
Motor Operated Valves and Control See See See SATIP-J-700-01 Motor Operated Valves and
3.13
Valves Remarks Remarks Control Valves
4.0 PRE-COMMISSIONING
INSPECTION RESPONSIBILITY
ITEM PROJECT PHASE QUALITY QUALITY ASSIGNMENTS
TASK / ACTIVITY REMARKS
NO. & ACTIVITY CODE PROCEDURE RECORD SAUDI
SUBCNTR CNTRCTR
ARAMCO
NFPA-13
Fig. 8-1 (a) Requirements for Hydrostatic Test of the system shall
4.1 Sprinkler System Acceptance Test NFPA-13 93
Fig. 8-1 (b) H H H be in accordance with SATIP-A-004-002
Forms
NFPA-14
Fig. 8-1 (a) Requirements for Hydrostatic Test of the system shall
4.2 Standpipe System Acceptance Test NFPA-14 96
Fig. 8-1 (b) H H H be in accordance with SATIP-A-004-002
Forms
SAIC SAIC
4.3 Final system Inspection
S-4026 S-4026 H H H
GENERAL NOTES
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may
1 adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
2 Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization
3 representative is not present.
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in
4 attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test RH Review and Approval of Documents
S Surveillance I 100% Subcontractor Inspection
8-Nov-15