Você está na página 1de 2

======== ======== ======== ======== ======== ======== ======== ========

======== ======== ======== ======== ======== ======== ======== ========


  Reinforced Concrete Design (Working Stress)
Footing [On Pile]      Footing Code: F1

Designer: TumCivil     Date: 24/9/44


Project : Brother 6th stories Apartment
======== ======== ======== ======== ======== ======== ======== ========
Design Column Load       P   = 118500  kg.
Moment      M   = 0       kg­m.
Dimension Of Footi ng   B     = 0.80       m.
     L   = 1.60       m.
Face Of Column           b   = 0.40       m.
     t   = 0.40       m.
Thickness Of Footin ng   h   = 0.60       m.
Covering      d'   = 0.08       m.
Concrete     fc'   = 280.00       ksc.
Steel     fy   = 4000.00       ksc.
  Capacity Of Pile   = 72000       kg.
Number Of Row Of Pile (B)   = 1 
Number Of Row Of Pile (L)   = 2 
=====<< Number Of Pile Is O.K.>>=====
   n    = 8.015     j    = 0.888 
   k    = 0.336     R    = 18.774       ksc.
******<< Consider  L  Direction >>**************************************
        Distance From Center Of Column To Each Row Of Pile (m.)
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
   1 st Row    | 0.45 
   2 nd Row    | 0.00 
   3 rd Row    | 0.00 
   4 th Row    | 0.00 
   5 th Row    | 0.00 
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­

         =====<< Load On Pile Is O.K.>>=====
Maximum Moment   = 15043       kg­m.
******<< CHECKING SHEAR FOR BEAM SHEAR & PUNCHING SHEAR >>***************
        Distance , No.Of Pile And Force From Critical Section 
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
Beam Shear         | Punching Shear
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­| ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
    Dist.    No.Pile   Force         |     Dist.    No.Pile   Force
    (m.)     (kg.)         |     (m.)     (kg.)
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­| ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
­0.130  1  4011          | 0.070  2  88252 
0.000  0  0          | 0.000  0  0 
0.000  0  0          | 0.000  0  0 
0.000  0  0          | 0.000  0  0 
Total Shear Force= 4011     kg.  | Total Shear Force= 88252     kg.
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­| ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
v       = 0.96  ksc.    | v       = 4.61  ksc.
v­all.  = 4.85  ksc.    | v­all.  = 8.87  ksc.
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
=====<< THICKNESS IS O.K. >>=====
|::
******<< REINFORCEMENT >>***********************************************
Diameter (mm.) Number Of Steel
16  9 
20  6 
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
********<< CHECKING BOND STRESS >>**************************************
Diameter( mm)   No. U     Uall.(DB)     Uall.(RB)
20  8  25.92  ksc. 27.02  ksc. 11.00  ksc.
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
  O.K. FOR DB    No.K. FOR RB 
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
******<< Consider  B  Direction >>**************************************
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
        Distance From Center Of Column To Each Row Of Pile (m.)
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
   1 st R ow          | 0.00 
   2 nd R ow          | 0.00 
   3 rd R ow          | 0.00 
   4 th R ow          | 0.00 
   5 th R ow          | 0.00 
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
         =====<< Load On Pile Is O.K.>>=====
Maximum Moment   = 0       kg­m.
******<< CHECKING SHEAR FOR BEAM SHEAR & PUNCHING SHEAR >>**************
        Distance , No.Of Pile And Force From Critical Section 
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
Beam Shear         | Punching Shear
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
    Dist.    No.Pile   Force         |     Dist.    No.Pile   Force
    (m.)     (kg.)         |     (m.)     (kg.)
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
0.150  0  0          | 0.070  2  88252 
0.000  0  0          | 0.000  0  0 
0.000  0  0          | 0.000  0  0 
0.000  0  0          | 0.000  0  0 
Total Shear Force= 0     kg.  | Total Shear Force= 88252     kg.
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
v       = 0.00  ksc.    | v       = 4.61  ksc.
v­all.  = 4.85  ksc.    | v­all.  = 8.87  ksc.
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
=====<< THICKNESS IS O.K. >>=====
******<< REINFORCEMENT >>***********************************************
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
Diameter (mm.) |    Number Of Steel
      |       B1 (middle)       B2 per side
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
16        | 7  2 
20        | 5  2 
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
********<< CHECKING BOND STRESS >>**************************************
     D (m m)    No. U     Uall.(DB)     Uall.(RB)
16  9  0.00  ksc. 33.78  ksc. 11.00  ksc.
­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­ ­­­­­­­­
  O.K. FOR DB    O.K. FOR RB 
======== ======== ======== ======== ======== ======== ======== ========