Escolar Documentos
Profissional Documentos
Cultura Documentos
=====<< Load On Pile Is O.K.>>=====
Maximum Moment = 15043 kgm.
******<< CHECKING SHEAR FOR BEAM SHEAR & PUNCHING SHEAR >>***************
Distance , No.Of Pile And Force From Critical Section
Beam Shear | Punching Shear
|
Dist. No.Pile Force | Dist. No.Pile Force
(m.) (kg.) | (m.) (kg.)
|
0.130 1 4011 | 0.070 2 88252
0.000 0 0 | 0.000 0 0
0.000 0 0 | 0.000 0 0
0.000 0 0 | 0.000 0 0
Total Shear Force= 4011 kg. | Total Shear Force= 88252 kg.
|
v = 0.96 ksc. | v = 4.61 ksc.
vall. = 4.85 ksc. | vall. = 8.87 ksc.
=====<< THICKNESS IS O.K. >>=====
|::
******<< REINFORCEMENT >>***********************************************
Diameter (mm.) Number Of Steel
16 9
20 6
********<< CHECKING BOND STRESS >>**************************************
Diameter( mm) No. U Uall.(DB) Uall.(RB)
20 8 25.92 ksc. 27.02 ksc. 11.00 ksc.
O.K. FOR DB No.K. FOR RB
******<< Consider B Direction >>**************************************
Distance From Center Of Column To Each Row Of Pile (m.)
1 st R ow | 0.00
2 nd R ow | 0.00
3 rd R ow | 0.00
4 th R ow | 0.00
5 th R ow | 0.00
=====<< Load On Pile Is O.K.>>=====
Maximum Moment = 0 kgm.
******<< CHECKING SHEAR FOR BEAM SHEAR & PUNCHING SHEAR >>**************
Distance , No.Of Pile And Force From Critical Section
Beam Shear | Punching Shear
Dist. No.Pile Force | Dist. No.Pile Force
(m.) (kg.) | (m.) (kg.)
0.150 0 0 | 0.070 2 88252
0.000 0 0 | 0.000 0 0
0.000 0 0 | 0.000 0 0
0.000 0 0 | 0.000 0 0
Total Shear Force= 0 kg. | Total Shear Force= 88252 kg.
v = 0.00 ksc. | v = 4.61 ksc.
vall. = 4.85 ksc. | vall. = 8.87 ksc.
=====<< THICKNESS IS O.K. >>=====
******<< REINFORCEMENT >>***********************************************
Diameter (mm.) | Number Of Steel
| B1 (middle) B2 per side
16 | 7 2
20 | 5 2
********<< CHECKING BOND STRESS >>**************************************
D (m m) No. U Uall.(DB) Uall.(RB)
16 9 0.00 ksc. 33.78 ksc. 11.00 ksc.
O.K. FOR DB O.K. FOR RB
======== ======== ======== ======== ======== ======== ======== ========