GUWAHATI/KAMAKHYA
North-east Frontier Railway
ORGANIZATIONAL STRUCTURE
The concept of Coaching Depot was adopted immediately after conversion of Guwahati Complex in
BG in 1984 with regards to maintenance of coaches by Mechanical and Electrical department under
DRM/Lumding
Page 1 of 22
Highlight/Achievements
1. The staffs of M&P section/GHY has made one wheel chair ramp for
passenger to board train at GHY platform. The design and fabrication done
in-house of Coach Maintenance Depot/GHY.
2. As part of Swachhta Pakhwada, an “ART OF LIVING” workshop for
supervisors(Mechanical & Electrical & other Deptt was held from 21st to 25th
August at Conference hall of Coach Maintenance Depot/GHY.
3. One knowledge centre for staffs training is opened at Coach maintenance
Depot,KYQ .
Page 2 of 22
1. SPECIAL ACHIVEMENT
All the machines and equipments of Kamakhya Laundry are being maintained in-house by Coaching
Depot/ GHY.
Upgraded the rake of 12067/68 GHY-JTTN Express & the rake of 12518/17 GHY-Garib Rath
Express by providing passenger amenity items in the train respectively. In Passenger amenities, all
gravity cocks, Door latches, Tower Bolt, Mirror, and Soap Container have been provided in the
train. Coach Boards inside all the coaches at both ends & Laminated Time-table display Boards
fitted in all the Jan-Shatabdi Coaches.
A complete automation of On Board Housekeeping Grievance Redressal Arrangement through
SMS under www.cleanmycoach.com has been introduced w.e.f 25.01.2016 in all the 27 OBHS
nominated train of Guwahati Coaching Depot.
Proper stocking of used linen and first in first out system ensured.
Auto dozer of the OEM of chemicals is being used for proper use of chemicals.
Proper sorting of soiled linens to give special treatment of stain linens.
Page 3 of 22
Salient Features:
3. Major Parameters:
1 1263
Coach Holding(Nos) (Including 17 NNGE based military
coaches)
2 Number of Primary Maintaince Train 38
3 Number of Secondary Maintaince Train 2*
4 Number of Dry cleaning trains (Return from platform) 17
5 Number of Through Passing Trains 21
6 Number of Primary Rakes 53
7 Total Staff 941
4. Staff Strength:
Supervisor 85 81 04 -
Ministerial 13 10 03 -
Fitting 491 428 63 -
Ancillary 137 111 26 -
Group ‘D’ 282 311 - 29
Total 1008 941 96
Page 4 of 22
5. Distribution of responsibilities of Supervisors at Coach Maintenance Depot, Guwahati.
A. Core Sections :-
Page 5 of 22
B. Support Sections :-
Page 6 of 22
6. NUMBER OF BATCHES & MEN’S DEPLOYED (STAFF & SUPERVISORS)
KYQ GHY NGC
No. of man
No. of No. of man No. of No. of man No. of
SECTION Deployed
Batches Deployed Batches Deployed Batches
101 nos
PIT-LINES 05 146 nos. 06 131nos. 06
.
PIT LINE (OFFICE) - 13 nos.
PIT-LINES/STORE - 19 nos.
JANASHATABDI - 01 09 nos.
BEDROLL - 06 nos.
LAUNDRY - 23 nos.
DATACELL - 06 nos.
RA&AC 52 nos.
SPARMV 11nos.
101 nos.
TOTAL 331 nos. 509 nos.
G.TOTAL 940 nos.
Page 7 of 22
Page 8 of 22
7. Composition of Rakes GHY
Nos of rakes
SLRD / SRD
LWACCW
LWACCN
LWRRM
ACCNH
LWFAC
TOTAL
ACCW
Pit On
ACCN
FCAC
Train Name(Deprt.)
WCB
NAC
DAC
SLR
ACJ
SRJ
CZJ
CN
GS
CZ
S.N Train
/(Arrv.)
Page 9 of 22
8. Composition of Rakes KYQ
Nos of rakes
SLRD / SRD
LWACCW
LWACCN
LWWCB
LWRRM
LWSCN
ACCNH
LWFAC
WCB +
TOTAL
ACCW
Pit On
ACCN
FCAC
Train Name
NAC
DAC
SLR
LS3
CN
GS
CZ
S.N Train
(Deprt /Arrvl.)
KYQ-BNC
1 12504 Humsafar Exp 1 M 0 0 0 0 0 0 0 0 0 1 0 0 2 16 0 0 0 0 19
(T)/(T)
KYQ LTT AC EXP
2 12520 1 W 0 0 0 0 0 0 0 0 0 1 0 0 2 11 4 1 0 0 19
(Th) /(Tu)
KYQ-YPR EXP
3 12552 1 Sa 0 0 0 0 0 0 0 0 0 1 0 0 2 11 4 1 0 0 19
(W) /(M)
KYQ-KATRA EXP
4 15655 1 SA 0 0 0 0 0 0 0 0 0 0 0 0 2 2 1 0 6 6 17
(SUN)
KYQ GYA WKLY EX
5 15620 Su
(M) /(W)
1 1 1 6 6 0 1 0 0 0 0 0 0 0 0 0 0 0 0 15
KYQ ANVT EXP
6 15621 W
(Th) /(Su)
KYQ-BGKT EXP
7 15623 1 FRI 0 0 0 0 0 0 0 0 0 0 0 0 2 3 2 0 6 6 19
(F)/(Th)
15644 KYQ PURI EXP/
8 / KYQ PUNE 1 Th 1 1 4 8 0 2 1 0 0 0 0 0 0 0 0 0 0 0 17
82506 (Th) /(M)
KYQ RNC EXP
9 15662 1 M, F 1 1 4 6 0 2 1 0 0 0 0 0 0 0 0 0 0 0 15
(Tu,Sa)/(Th,M)
KYQ GIMB EXP
10 15668 1 Tu 1 1 7 12 0 1 1 0 0 0 0 0 0 0 0 0 0 0 23
(W) /(Tu)
KARMABHUMI
11 22512 EXP 1 Sa 1 1 6 8 0 3 2 0 0 0 0 0 0 0 0 0 0 0 21
(Sa) /(F)
KYQ LMG PASS
12 55601
(Daily)
B G EXPRESS
13 15665
(Daily)
4 Daily 4 4 16 16 4 4 4 0 0 0 0 0 0 0 0 0 0 0 52
INTER CITY EXP
14 15603
(Daily)
NAGALAND EXP
15 15669
(Daily)
JTTN INTERCITY
16 15605 2 Daily 4 0 2 6 0 4 0 0 0 0 0 0 0 0 0 0 0 0 16
(Daily)
KYQ-MZS EXP Su,M,
17 15613 2 4 0 0 16 0 2 2 0 0 0 0 0 0 0 0 0 0 0 24
(Daily). Th,F
Bare at KYQ 19 17 9 45 78 4 19 11 0 0 3 0 0 10 43 11 2 12 12 276
Page 10 of 22
9. List of Trains undergoing primary maintenance:-
A. GHY:-
S.No Train No. No. of Load Link Km. Type Of Days of Operation Remarks
Rakes M’nce At
other End
1
12501/02 2 21/42 1913 km S/M 03 Days A Week
2
12505/06 4 24/48 1870 km S/M Daily
3
12507/08 22/44 3322 km S/M 01 Day/Week
4
12515/16 4 22/44 3542 km S/M 01 Day/Week
5
15636/35 22/44 3296 km S/M 01 Day/Week
6 02 VPU
12510/09 3 22/44 2972 km S/M 03 Days A Week
7
12514/13 1 22/44 2542 km S/M 01 Day/Week
8
15630/29 1 20/40 2801 km S/M 01 DAY/WEEK
9
15632/31 2 22/44 2440/2244 km S/M 02 Days /Week
10
15640/39 1 15/30 1532 km TE 01 Days/Week
11 01 VPU
15645/46 2 22/44 2558 km S/M 02 Days/Week
12
15648/47 1 21/42 2772 km S/M 01 Days/Week
13
15651/52 1 24/48 2350 km S/M 01 Days/Week
14
15653/54 1 24/48 2428 km S/M 01 Days/Week
15 02 VPU
15658/57 3 17/34 983 km TE Daily
16
12518/17 1 12/24 996 km TE 02 Days /Week
17
12067/68 1 19/38 376 km PT 06 Days/Week
18
55603/04 1 11/22 161 Km PT 02 Days/Week
19
55607/08 1 12/24 172 Km PT 02 Days/Week
2
20
15617/18 12/24 333KM PT Daily
Page 11 of 22
B. KYQ:-
Type Of
No. of Link
S.N Train Name Train No. Load M”nce At Days of Operation Remarks
Rakes Km.
other End
1 14/28
Thursday
4 KYQ-PURI 15644 DN/43 UP 1 16/32 PF return
KYQ-
6 LTT(AC SPL 12520 DN/19 UP 1 19/38 Second. Thursday
EXP)
KYQ-YPR
7 12552dn/51up 1 19/38 Second. Saturday
AC Exp.
KYQ-
8 KARAMBHU 22512DN/11UP 1 19/38 Second. Saturday
MI
LMG DMV
9 15665UP/66DN 18/36 PF return
BG EXP. Daily
LEDO 15603UP/04DN
10 Intercity 1/36 Second. Daily
Express
4
KYQ- 15669UP/70DN
11 Nagaland 18/36 PF return Daily
exp
KYQ- LMG 55601UP/02DN
12 18/36 PF return Daily
Pass
JTTN
13 Intercity 15605/15606 2 6/12 PF return Daily
Express
FRIDAY
15 KYQ-BGKT 15624/23 1 19/38
KYQ- SATURDAY
16 15656/15656 1 17/34
KATRA
MONDAY
17 KYQ-PUNE 82506/82508 1 16/32
KYQ-BNC TUESDAY
18 12504/12503 1 19/38
HUMSAFAR
Page 12 of 22
10. List of Platform Return trains:-
a. Guwahati:-
Saraighat Express
1 12345/12346
Capital Express
2 13248/13247
Silchar Pass.
3 55616/55615
Koplil expresss
4 55603/55604
Maraini express
5 55753/55754
Manash Rhino passengers
6 55801/55802
NBQ-GHY PASS .
7 55803/55804
NBQ-GHY CHILARAI PASS.
8 55805/55806
NBQ-GHY PASS .
9 55809/55810
GHY-HBN PASS
10 55815/55816
GHY MEDINIPATHAR EXPRESS
11 55820/55819
GHY-NBQ SPL PASS
12 05813/05814
b. KAMAKHYA
Page 13 of 22
11. LIST OF THROUGH PASS TRAINS:-
Page 14 of 22
12. Performance Parameters
Ineffective
% Ineffective
16-17 17-18 1.2 % Ineffective
April 0.99 0.6
May 0.97 0.62 1
June 0.87 0.65
0.8
July 0.68 0.97
Aug 1.07 0.6
Sept 1.09 % Ineffective 16-
Oct 0.92 0.4 17
Nov 0.52
0.2
Dec 0.7
Jan 0.97 0
Feb 1.13
Nov
April
July
June
Jan
Mar
May
Aug
Oct
Sept
Feb
Dec
Mar 0.86
13. Schedule Maintenance IOH done by GHY & KYQ Coaching Depot.
IOH
Month yearwise IOH
60
16-17 17-18
Apr 12 56 50
May 10 39
Jun 11 56 40
Jul 11 55
Aug 19 30
IOH yearwise 16-17
Sep 17
IOH yearwise 17-18
Oct 20 20
Nov 31
Dec 51 10
Jan 53
0
Feb 38
Nov
Jul
Oct
Jan
Mar
Apr
May
Aug
Jun
Sep
Feb
Dec
Mar 41
Up to December’15 36 nos IOH done.
Up to December’16 51 nos IOH done.
Page 15 of 22
14. Detachment within 100 days of POH
Detachment within
12
100 days of POH
Detachment within 100 days of POH
16-17 17-18
10
Apr 6 3
May 8 6
8
Jun 5 2
Jul 8 0
6 Detachment within
Aug 1 100 days of POH 16-
17
Sep 6
4 Detachment within
Oct 6 100 days of POH 17-
18
Nov 7
2
Dec 11
Jan 9
0
Feb 6
Mar
Apr
May
Aug
Sep
Feb
Jun
Dec
Nov
Jul
Jan
Oct
Mar 3
15. Infrastructure:-
C. Pit Line
Pit Lines Capacity (Coaches): Standard Pit Line Length = 24 coaches
GHY 1 21 coaches. (490 meters)
GHY 2 20 coaches (455 meters)
GHY 3 19 coaches. (435 meters)
NGC 26 coaches. (580 meters)
KYQ 1 26 coaches. (580 meters)
KYQ 2 26 coaches. (580 meters)
Page 16 of 22
D. Stabling Line
Mechanized Coach Cleaning and water topping of coaches of through passing trains during halt at Platforms
under “Clean Train Station” scheme for a period of 03 years is being done by M/S General Security &
information Services Private Ltd. 7/C Abinash Ch. Banerjee Lane, Kolkata-700010. Validity of contract from
08.03.2015 to 07.03.2018. Tendered cost is Rs. 5,08,49,950.00.
Mechanized Coach Cleaning and Water topping of Coaches maintained at Pit Lines, Guwahati Pit Line, New
Guwahati and Pit lines Kamakhya, Depot Premises cleaning along with garbage removal from GHY, NGC, &
KYQ under Coaching Depot Guwahati for a period of 02yeras is being done by the M/S Khagaul Loco Labours
Co-operative Society Ltd., Khagaul, Patna. Validity of Contract from 15/01/2015 to 14/01/2017. Tendered Cost
is Rs. 7, 53,94,750.00.
List of Trains:-
GHY:-
Page 17 of 22
KYQ:-
Contract for the ‘On Board House Keeping Services” (OBHS) for New Guwahati based 11 nos. of trains KYQ
based 10 nos. of trains and GHY based 06 nos. of trains are award to M/s GS & IS Pvt Ltd., M/s Rahul Trade
& Agencies and M/s Dynamic Services respectively and are running since Feb’2015.
Trains attend
KYQ 10 nos. 117 nos. M/s Rahul Trade & Rs.2,80,74,926.00
based Agencies
GHY 06 nos. 88 nos. M/s Dynamic Services Rs.5,13,93,273.00
based
NGC 11 nos. 164 nos. M/s GS & IS Pvt Ltd. Rs.4,84,48,206.00
based
TOTAL 27NOS 369
COACHES.
Page 18 of 22
ON BOARD HOUSE KEEPING SERVICES OF GUWAHATI BASED 06 NOS TRAINS FOR A PERIOD OF 03
YEARS by M/S Dynamic Services.
Start Date: 09.05.2015
Train Details
ON BOARD HOUSE KEEPING SERVICES OF KAMAKHYA BASED 10 NOS TRAINS FOR A PERIOD OF 03
YEARS by M/S Rahul Trade Agency
Start Date: 29.04.2015
ON BOARD HOUSE KEEPING SERVICES FOR NEW GUWAHATI BASED ELEVEN TRAINS OF COACHING
DEPOT GUWAHATI FOR A PERIOD OF 03 YEARS by M/S GS & IS PVT. LTD.
Start Date: 17.02.2015
Page 19 of 22
D. Pest & Rodent Control:-
Pest and Rodent control contract has been outsourced to M/s Chandi Pest Control & Co. Bandha
Chowk, Bidanasi, Cuttack-753014, Odisha. . All Guwahati & KYQ Based trains are attendant by M/S Chandi for
Pest & Rodent Control.
Mechanized Laundry was set up at Kamakhya in July, 2010 with a capacity of 1 ton and
further augmented to 3.5 ton. Comprehensive Linen handling in the laundry along with
transportation, loading/unloading of linens in trains at GHY and KYQ has been outsourced to
M/S Osho Garments Finishers & Laundry Pvt. Ltd, 8, Camac Street, Kolkata-70017. Linens
are being supplied in sealed packets.
Requirement of M & P:
a) Additional requirement of double roller flat ironer to increase the production. The process for inclusion
under M&P under GM’s power (Out of turns) has already been initiated from this end.
Page 20 of 22
c) Proposal for repairing of equipment for KYQ laundry at Cost of Rs.31.39 Lakh has been sent to
ADFM/GHY for account vetting on 12.12.2016.
d) Estimate against proposal for setting up tf BOOT laundry at GHY area at a cost of Rs. 148.35 crore has
been sent to ADFM/GHY on 15.12.2016 for account vetting.
Page 21 of 22
20. Assistance required
Fund allotments of following heads are insufficient. As such adequate fund may be provided as
follows:-
A. Extension of Sick-Line of KYQ Coaching Depot by 3coach length x 2lanes, i.e 06 coaches’ length with
additional 02 pits for additional LHB coach & Pantry car attention.
B. One canteen has been proposed and forward to Sr.DEN/MLG for KYQ Coaching Depot.