APPENDIX 1
Department of Education
2016
APPENDIX 1
Table
of
Contents
Introduction
APPENDIX 1
The
DepEd
Computerization
Program
(DCP)
aims
to
provide
public
schools
with
appropriate
technologies
that
would
enhance
the
teaching-‐learning
process
and
meet
the
challenges
of
the
21st
century.
The
following
are
the
objectives
of
the
DCP:
• Provide
ICT
packages
to
public
schools
that
is
responsive
to
the
needs
of
the
K-‐12
curriculum;
• Integrate
ICT
in
the
teaching
and
learning
process;
• Raise
the
ICT
literacy
of
learners,
pupils,
students,
teachers
and
school
heads;
• Improve
computer-‐to-‐student
ratio
in
the
public
schools,
and
• Improve
the
replacement
cycle
of
ICT
packages.
A. DCP
PROCESS
FLOW
A.1. Identification
as
to
what
type
of
ICT
Package
would
support
the
curriculum
being
offered
in
our
schools.
A.2. Preparation
&
Finalization
of
Technical
Specifications
of
the
ICT
Package
including
costs.
A.3. Provision
of
recipient
list
as
to
how
many
schools
will
be
able
to
benefit
from
the
current
allotted
budget.
A.4. Proceed
with
Procurement
Process
in
accordance
with
Republic
Act
9184
otherwise
known
as
the
“Government
Procurement
Reform
Act”
and
its
Implementing
Rules
and
Regulations.
B.1.
Pre-‐Deployment
Preparation
B.1.1.
Policies
1. School
readiness
shall
be
assessed
based
on
the
completion
and
readiness
of
the
following
counterpart
requirements:
1.1. Multi-‐media
Classroom
with
the
following:
• Sufficient
number
of
computer
tables
and
chairs
for
the
DCP
Package/s.
4. Division
IT
Officer
4.1. Assesses
the
filled-‐up
School
Readiness
Checklists
by
DCP
recipient
schools
based
on
the
list
from
the
DepEd
Memorandum;
4.2. Submits
consolidated
school
readiness
reports
to
the
SDS;
4.3. Recommends
replacement
school/s
to
the
SDS
in
case
of
non-‐readiness
of
the
original
recipient
school/s.
4.4. Forwards
final
list
of
schools
(with
accomplished
school
readiness
checklist)
approved
by
the
SDS
to
the
Regional
ITO
copy
furnished
DCP/ICTS
the
accomplished
checklist;
4.5. Provides
technical
assistance
to
all
recipient
schools
to
ensure
readiness
of
the
schools’
facilities
by
the
time
deployment
of
the
DCP
Packages
starts.
4.6. Provides
copy
of
IAR
and
Contract
to
recipient
schools
prior
to
delivery
of
the
DCP
Package.
4.7. Participates
in
the
Orientation/Training
for
the
DCP
Ticketing
System.
4.8. Recommends
to
the
SDS
to
request
the
recipient
schools
to
provide
at
least
three
(3)
school
personnel
who
will
be
authorized
to
update
the
DepEd
Ticketing
System
which
will
be
used
during
the
Deployment
and
Post
Deployment
stages
of
the
DCP
project.
5. Principal/School
Head
5.1. Prepares
counterpart
requirements
as
indicated
in
the
School
Readiness
Checklist
prepared
by
DCP/ICTS
and
disseminated
by
the
Division
ITO.
5.2. For
security
mechanisms:
• If
able,
hires
Security
Guards;
or
• Coordinates
with
the
Barangay
Council
and/or
Police
Station
and
requests
to
detail
Brgy.
Tanods
and/or
Police
Officers
to
do
random
inspection/
rounds
24
hours
a
day
and
7
days
a
week
to
secure
the
whole
area
of
the
school
and
all
its
assets.
• The
computer
laboratory
doors
should
be
(double
or
triple
locked)
using
heavy
duty
padlocks
or
other
6. Supplier
6.1. Informs/meets
UNDP
and
DCP/ICTS
on
the
issuance
of
Notice
of
Award
(NOA)
and
discuss
implementation
plan
and
strategies.
6.2. Submits
to
DCP/ICTS
the
official
list
of
the
Supplier’s
B.1.3
Responsibilities
1. DCP/ICTS
1.1. Ensures
that
all
Regional,
Division
ITOs
and
schools
are
informed
of
the
DCP
implementation
program
every
year.
1.2. Provide
list
and
other
related
information
of
recipient
schools
to
Supplier/s.
2. Regional
IT
Officer
2.1. In-‐charge
of
disseminating
instructions
to
Division
ITOs
in
conducting
School
Readiness
Assessment
for
the
DCP.
2.2. Responsible
for
reviewing
reports
of
assessed
schools
from
the
Division
ITOs
and
forwarding
final
list
to
DCP/ICTS.
2.3. Ensure
that
all
Divisions
are
ready
to
receive
the
DCP
Package.
2.4. Ensure
participation
in
the
orientation/training
for
the
DCP
Ticketing
System.
4. Division
IT
Officer
4.1. Responsible
for
assessing
readiness
of
schools
and
recommending
replacement
schools
to
the
SDS
when
necessary;
4.2. Conducts
actual
School
Readiness
Assessment.
4.3. In-‐charge
of
forwarding
final
list
of
recipient
schools
to
the
Regional
ITO
copy
furnished
DCP/ICTS.
4.4. Ensure
participation
in
the
orientation/training
for
the
DCP
Ticketing
System.
B.2.
Pre-‐Deployment
Inspection
B.2.1. Policies
1. DepEd-‐BAC
Procured:
a. For
inspection
of
deliveries
of
equipment,
supplies
and
materials,
and
infrastructure
projects
(DepEd-‐BAC
Procured),
the
inspection
shall
be
handled
by
the
Central
Office
Inspectorate
Team
composed
of
the
following:
Office
Designation
DCP/ICTS Team Leader
b. For
any
given
inspection,
the
team
should
be
composed
of
at
least
three
(3)
members.
2. DCP/ICTS
2.1. Confirms
with
the
Supplier
the
final
date
of
the
Pre-‐
Deployment
Inspection
process.
2.2. Prepares
and
transmits
an
Office
Memorandum
to
the
Asset
Management
Division
and
Accounting
Division
of
the
DepEd
Central
Office
requesting
for
representatives
who
will
form
part
of
the
DepEd
Inspectorate
Team.
2.3. Designates
representative
of
DCP/ICTS
to
form
part
of
the
DepEd
Inspectorate
Team
for
DCP
project.
2.4. Communicates
and
discuss
matters
with
regard
to
the
forthcoming
Pre-‐Deployment
Inspection
with
other
representatives
designated
to
be
members
of
B.2.3.
Responsibilities
2. DCP/ICTS
2.1. Finalize
the
date
of
the
inspection
with
the
Supplier.
2.2. In
charge
of
the
creation
of
the
DepEd
Inspectorate
Team.
2.3. Responsible
for
issuing
the
certification
of
compliance
during
the
Pre-‐Deployment
Inspection
to
the
Supplier.
C. DCP
DEPLOYMENT
PROCESS
C.1.
Delivery
of
the
DCP
Packages
to
Recipient
Schools
C.1.1.
Policies
1. Delivery
of
DCP
packages
shall
be
done
only
for
those
schools
who
have
fulfilled
the
Level
1
counterpart
requirements
as
indicated
in
page
4,
Item
No.
2,
letter
A
of
the
Pre-‐Deployment
Preparation
phase
of
this
DCP
Orientation
Handbook
as
prescribed
by
the
DepEd
Central
Office.
2. Supplier
shall
coordinate
with
the
Region/Division
IT
Officers
and
recipient
schools
on
details
with
regard
to
delivery.
3. Acceptance
of
deliveries
shall
only
be
done
during
school
days
from
8
AM
to
5
PM
(holidays
not
included).
4. Deliveries
shall
be
made
to
the
address
of
the
recipient
school
specified
in
the
listing
provided
by
DCP/ICTS,
unless
otherwise
indicated
in
the
contract.
5. At
the
recipient
school,
the
DCP
Package
can
only
be
unloaded
when
authorized
School
Personnel
and/or
the
School
Property
Custodian
is/are
present.
Opening
of
individual
boxes
will
only
be
done
and
facilitated
by
the
Supplier’s
Authorized
Service
Partners
(ASPs).
6. The
School
Property
Custodian
(or
authorized
representative)
shall
perform
an
initial
inspection
of
the
delivered
DCP
Package
as
to
physical
conditions,
quantity
and
in
accordance
to
the
items
specified
in
the
contract
between
DepEd
and
the
Supplier
for
the
DCP
project.
2. Forwarder/UNDP
2.1. Coordinates
the
schedule
of
deliveries
to
the
Region
and
Division
ITOs
and
recipient
schools.
2.2. Confirms
address
of
the
recipient
school.
2.3. Requests
the
presence
of
School
Personnel
and/or
School
Property
Custodian
prior
to
unloading
and/or
opening
of
the
DCP
Package
upon
arrival
at
the
recipient
school.
2.4. Assesses
presence
of
Level
1
requirements
before
proceeding
with
unloading
of
DCP
package
from
the
delivery
vehicle.
2.5. Restricts
further
opening
of
the
boxes
of
the
items
if
noticed
that
some
are
found
to
be
missing
or
damaged.
2.6. Informs
Division
ITO
when
encountering
unsafe
conditions
and
recommends
temporarily
delivering
the
DCP
Package
to
a
nearby
Public
School
for
safekeeping.
2.7. Issues
a
Temporary
Forwarding
Bill
and/or
Delivery
Receipt
to
the
Public
School
receiving
the
DCP
Package
for
temporary
storage
upon
completion
of
transporting
the
said
package
to
a
secure
room.
2.8. Obtains
DCP
Package
from
Public
School
which
served
as
temporary
storage
and
delivers
to
the
legitimate
recipient
school
when
conditions
have
improved.
2.9. Updates
DepEd
Ticketing
System
with
regard
to
the
status
of
the
delivery
through
SMS.
2.10.Coordinates
bi-‐monthly
meeting
with
DCP/ICTS
for
implementation
updates
and
resolution
of
issues/
challenges.
3. Region/Division IT 3.1. Informs recipient schools on the schedule of delivery of
4. Principal/School
Head
4.1. Determines
that
all
counterpart
requirements
have
been
complied
with.
4.2. Advises
the
School
Property
Custodian
(or
authorized
representative)
on
the
schedule
of
delivery
and
what
steps
to
be
taken
to
address
delivery
concerns.
4.3. Informs
concerned
School
Personnel
to
be
present
when
the
delivery
of
the
DCP
Package
arrives.
4.4. Instructs
School
Personnel
to
prepare
a
secure
room
for
the
DCP
Package
which
will
serve
as
temporary
storage
prior
to
the
inspection
by
the
School
Inspectorate
Team.
4.5. Picks
out
School
Personnel
who
will
be
in-‐charge
of
moving
the
DCP
Package
to
the
secure
room
provided
by
the
school.
4.6. Instructs
authorized
School
Personnel
to
update
the
DepEd
Ticketing
System
with
regard
to
the
status
of
the
delivery
through
SMS.
5. School
Property
5.1. Secures
copy
of
IAR
and
Contract
of
DCP
Project
from
Custodian
or
Division
ITO.
Authorized
5.2. Take
photos/video
footages
of
the
packages
for
Representative
reference
upon
arrival.
5.3. Inspects
the
delivered
DCP
Package
as
to
physical
conditions
(i.e.
brand
new
or
used,
dents,
scratches,
etc.),
quantity
and
if
it
is
in
accordance
with
the
Contract
between
DepEd
and
the
Supplier
before
receiving.
5.4. Restricts
further
opening
of
the
boxes
of
the
items
if
some
are
found
to
be
missing
or
damaged
and
does
the
following:
6. Recommended
Public
6.1. Receives
the
DCP
Package
from
the
Supplier/Forwarder
School
for
Temporary
and
issues
a
letter
attesting
to
the
unsafe
conditions.
Storage
(in
case
of
6.2. Requests
for
a
Temporary
Forwarding
Bill
and/or
armed
conflict
or
Delivery
Receipt
from
the
Supplier/Forwarder
upon
calamities)
completion
of
transporting
the
said
package
to
a
secure
room.
C.1.3.
Responsibilities
1. DCP/ICTS
1.1. Responsible
for
updating
Region
and
Division
ITOs
with
regard
to
the
delivery
of
DCP
Packages.
1.2. Ensure
regular
updates
from
the
Supplier
and
come
up
with
solutions
for
challenges
encountered.
1.3. Monitor
DCP
Ticketing
System
updates.
2. Forwarder/UNDP
2.1. Ensure
that
Region
and
Division
ITOs
have
been
notified
of
the
delivery
schedules
and
other
requirements.
2.2. Ensure
that
delivery
procedures
will
be
followed.
2.3. Ensure
delivery
of
DCP
Packages
to
all
recipient
schools.
2.4. Responsible
for
reporting
and
assisting
in
the
resolution
of
delivery
issues.
3. Region/Division
IT
3.1. Ensure
that
recipient
schools
are
aware
of
delivery
Officers
schedules
and
procedures.
3.2. Ensure
to
assist
the
recipient
schools
on
delivery
concerns.
3.3. Update
and
monitor
DCP
Ticketing
System
on
implementation
updates.
4. Principal/School
Head
4.1. Ensure
readiness
of
the
school
to
accept
the
DCP
Package.
4.2. Ensure
that
School
Personnel
will
take
action
on
5. School
Property
5.1. Ensure
that
copies
of
the
IAR,
Contract,
etc.
are
ready
by
Custodian
or
the
time
the
delivery
of
the
DCP
Package
arrives.
Authorized
5.2. Responsible
for
documenting
(supported
with
photos/
Representative
video
footage)
the
delivery.
5.3. Ensure
that
the
initial
inspection
is
in
accordance
with
the
policies
and
procedures
set
forth
in
this
Handbook.
6. Recommended
Public
6.1. Ensure
that
documents
needed
in
securing
the
DCP
School
for
Temporary
Package
for
temporary
storage
are
issued
properly.
Storage
(in
case
of
6.2. Responsible
for
securing
the
DCP
Package
from
theft
armed
conflict
or
and
any
incident
that
may
cause
damage
to
it.
calamities)
C.2.
Inspection
of
DCP
Packages
at
the
Recipient
Schools
C.2.1.
Policies
1. Inspection
of
items
can
only
be
done
in
the
presence
of
the
School
Inspectorate
Team,
School
Officials/personnel
and
the
Supplier’s
Authorized
Service
Partner
(ASP)
prior
to
the
unpacking
of
the
items.
2. Actual
inspection
of
the
item/s
shall
be
done
by
the
School
Inspectorate
Team
and
should
be
according
to
the
technical
specifications
and
functionalities
being
required.
3. Inspection
shall
be
done
according
to
approved
policies
and
procedures.
4. Before
the
actual
inspection,
the
ASP
shall
turnover
the
Inspection
and
Acceptance
Report
(IAR)
to
the
School
Inspectorate
Team.
5. The
School
Inspectorate
Team
shall
accomplish
the
IAR
in
three
(3)
copies.
6. The
Supplier,
Recipient
School,
Region
and
Division
ITOs
are
instructed
to
update
the
progress
of
implementation
through
the
DepEd
Ticketing
System
via
SMS
(text
message).
C.2.2.
Procedures
2. Authorized
Service
2.1. Notifies
the
recipient
school
on
the
date
the
DCP
Partner
(ASP)
Package
will
be
unpacked
for
inspection
by
the
School
Inspectorate
Team.
2.2. Informs
the
recipient
school
on
the
identities
of
the
representatives
of
the
ASP
that
will
be
present
on
the
date
of
unpacking.
2.3. Inspects
and
shows
to
the
Principal/School
Head
or
any
authorized
School
Personnel,
School
Property
Custodian
and
School
Inspectorate
Team
the
exterior
condition,
completeness
of
the
items,
accessories
and
other
peripherals
of
the
packages.
2.4. Notes
down
any
signs
of
tampering,
mishandling
and/or
other
type
of
damage/s
to
the
DCP
Package
prior
to
the
inspection
by
the
School
Inspectorate
Team.
2.5. Turnovers
the
packages
to
the
School
Inspectorate
Team
for
further
inspection
if
it
complies
with
the
established
Technical
Specifications
and
the
TOR.
2.6. Assists
the
School
Inspectorate
Team
during
the
inspection
phase
only
when
needed.
2.7. Informs
Supplier
on
the
status
of
the
Inspection.
3. Principal/School
Head
3.1. Informs
School
Personnel
and
School
Inspectorate
Team
on
the
date
the
ASP
will
arrive
for
the
unpacking
of
the
DCP
Package.
3.2. Logs
representatives
of
the
ASP
who
will
conduct
the
unpacking
of
the
DCP
Package.
3.3. Directs
School
Personnel
to
document
the
inspection
proceedings.
3.4. Observes
the
unpacking
of
the
packages
together
with
the
School
Property
Custodian
and
School
Inspectorate
Team.
3.5. Instructs
authorized
School
Personnel
to
update
the
DepEd
Ticketing
System
with
regard
to
the
status
of
the
delivery
through
SMS.
5. School
Inspectorate
5.1. Inspects
the
physical
condition
of
the
DCP
Package
after
Committee
being
turned
over
by
the
ASP.
5.2. Checks
if
the
items
are
in
accordance
with
the
Contract
and
on
the
template
IAR
provided
by
the
ASP,
following
the
exact
quantity
and
technical
specifications.
a. If
the
items
comply
with
what
is
stated
in
the
Contract
and
IAR,
the
School
Inspectorate
Team
signs
the
IAR
as
to
compliance
of
the
items.
b. If
some
or
all
of
the
items
do
not
comply
with
what
is
stated
in
the
contract,
the
School
Inspectorate
Team:
• Informs
the
Supplier
by
calling/texting
any
of
the
numbers
to
be
provided.
• Informs
the
Division
ITO
regarding
the
concern/s.
• Makes
a
note
in
the
IAR
of
the
observed
problems.
5.3. Advises
the
ASP
that
it
can
proceed
to
the
installation
phase
if
the
DCP
Package
is
found
to
be
complying
with
the
Contract,
IAR
and
TOR.
6. Division
IT
Officer
6.1. Notes
down
issues
encountered
during
the
inspection
done
by
the
School
Inspectorate
Team
for
future
reference
in
accomplishing
reports
for
the
Regional
ITO
and
DCP/ICTS.
6.2. Assists
the
Principal/School
Head,
School
Property
Custodian
and
School
Inspectorate
Team
on
the
next
action
to
take
with
regard
to
inspection
concerns.
6.3. Updates
DepEd
Ticketing
System
with
regard
to
the
status
of
the
inspection.
7. Regional
IT
Officer
7.1. Monitors
inspection
concerns
collected
from
the
Division
ITOs
for
consolidation
and
to
be
reported
to
DCP/ICTS.
7.2. Assists
Division
ITOs
with
regard
to
inspection
concerns.
7.3. Updates
DepEd
Ticketing
System
with
regard
to
the
status
of
the
inspection.
C.2.3.
Responsibilities
1. Supplier
1.1. Ensure
that
the
ASP
strictly
follows
the
timelines
set
to
complete
their
respective
duties.
1.2. Ensure
the
provision
of
IARs
to
the
ASP
for
use
of
the
School
Inspectorate
Teams.
1.3. Provide
assistance
in
resolving
concerns
with
regard
to
inspection.
1.4. Ensure
that
DepEd
Ticketing
System
is
updated.
1.5. Attend
bi-‐monthly
meetings
with
DCP/ICTS
on
progress
of
implementation
and
resolution
of
inspection
concerns.
2. Authorized
Service
2.1. Ensure
that
recipient
schools
are
informed
of
on
the
Partner
(ASP)
date
of
unpacking
the
DCP
Package
and
followed
by
the
inspection
stage.
2.2. Responsible
for
handing
over
the
IAR
(provided
by
the
Supplier)
to
the
School
Inspectorate
Team
prior
to
the
inspection
stage.
2.3. Responsible
for
initially
inspecting
the
DCP
Package
prior
to
the
inspection
by
the
School
Inspectorate
Team.
2.4. Provide
assistance
to
the
School
Inspectorate
Team
when
needed.
2.5. Ensure
to
report
on
the
status
of
the
Inspection.
3. Principal/School
Head
3.1. Responsible
for
monitoring
the
unpacking
and
inspection
of
the
DCP
Package.
3.2. Ensure
the
inspection
is
done
according
to
approved
policies
and
procedures.
3.3. Ensure
complete
documentation
of
the
inspection
proceedings
copy
furnished
the
Division
ITO.
3.4. Ensure
updating
of
the
DepEd
Ticketing
System.
4. Property
Custodian
4.1. Ensure
appropriate
inspection
proceedings
are
followed.
5. School
Inspectorate
5.1. Ensure
conformity
of
DCP
Package
to
the
Contract,
IAR
Committee
and
TOR.
6. Division
IT
Officer
6.1. Ensure
appropriate
inspection
proceedings
in
recipient
schools
and
assist
in
resolving
concerns.
6.2. Provide
progress
reports
to
the
Regional
ITO.
6.3. Update
and
monitor
DCP
Ticketing
System
on
C.3.
Installation
of
DCP
Packages
at
the
Recipient
Schools
C.3.1.
Policies
1. The
school
should
follow
the
prescribed
DCP
Package
Layout
(see
Appendix
5).
2. Installation
of
the
DCP
Package
should
immediately
commence
right
after
satisfactory
result
of
the
inspection
done
by
the
School
Inspectorate
Team.
3. Keep
in
mind
that
the
Supplier
will
install
the
DCP
Package
only
once
per
school
and
is
considered
permanent.
4. Sudden
and
unnecessary
changes
or
adjustments
to
pre-‐arranged
installation
layouts
with
the
Supplier/ASP,
is
not
allowed
as
this
will
cause
delays.
5. Representatives
of
the
ASP
shall
not
make
any
modifications
and/or
additional
improvements
to
the
equipment
and
installation
specifications
set
down
in
the
Terms
of
Reference
(TOR)
of
the
DepEd
Central
Office.
Any
modification
must
be
consulted
first
with
the
Supplier
and
DepEd.
6. Liabilities
incurred
in
the
performance
of
any
unauthorized
work
at
the
behest
of
school
representatives
shall
be
charged
to
the
school
accordingly.
7. During
installation,
in
the
event
the
ASP’s
representative/s
intentionally
or
unintentionally
damage
and/or
break
any
school
property,
the
Supplier/ASP
shall
replace
the
affected
item/s
immediately.
8. The
Supplier,
Recipient
School,
Region
and
Division
ITOs
are
instructed
to
update
the
progress
of
implementation
through
the
DepEd
Ticketing
System
via
SMS
(text
message).
4. School
Property
4.1. Observes
and
documents
the
whole
installation
phase.
Custodian
and
School
4.2. Informs
School
Officials/Division
ITO
of
concerns
during
Personnel
installation
for
clarification
and
guidance.
C.3.3.
Responsibilities
1. ASP
1.1. Responsible
for
setting-‐up,
installation,
configuration
and
testing
of
DCP
Packages
according
to
conditions
specified
in
the
Contract.
1.2. Ensure
updates
on
installation
concerns
to
the
Supplier.
3. Principal/School
Head
3.1. Ensure
School
Personnel
are
always
present
to
oversee
and
document
the
installation
process.
5. Division
IT
Officer
5.1. Ensure
monitoring
of
installation
progress
and
assist
in
resolving
concerns.
6. Regional
IT
Officer
6.1. Ensure
monitoring
of
installation
progress
and
assist
in
resolving
concerns.
C.4.
Training
of
School
Personnel
at
the
Recipient
Schools
C.4.1.
Policies
2. School
Personnel
to
be
2.1. The
school
personnel/representatives
fills-‐up
the
trained
attendance
sheet
that
forms
part
of
the
Training
Checklist.
2.2. As
proof
of
attendance,
attendees
are
advised
to
prepare
beforehand
a
photocopy
of
their
DepEd/School
ID
(front
and
back)
with
signature
which
will
be
submitted
to
the
ASP
for
documentation
purposes.
3. Division
IT
Officer
3.1. Gathers
concerns
encountered
during
training
done
by
the
ASPs
for
future
reference
in
accomplishing
report
for
the
Regional
ITO
and
DCP/ICTS.
3.2. Provides
assistance
to
recipient
schools
with
regard
to
training
issues.
4. Regional
IT
Officer
4.1. Provides
assistance
to
Division
ITOs
and
recipient
schools
with
regard
to
training
issues.
C.4.3.
Responsibilities
1. Principal/School
Head/
1.1. Coordinate
with
the
ASP
with
regard
to
the
proceedings
of
the
training
course.
1.2. Ensure
that
the
training
is
conducted
according
to
the
TOR.
1.3. Ensure
availability
of
venue
&
attendees.
2. School
Personnel
to
be
2.1. Ensure
to
fill-‐up
the
attendance
sheet
and
training
Trained
checklist.
2.2. Inform
the
School
Head/Principal
with
regard
to
the
proceedings
of
the
training.
3. Division
IT
Officer
3.1. Provide
assistance
to
the
recipient
schools,
Supplier
and
ASPs
in
resolving
concerns
encountered
during
the
training
of
the
school
personnel.
3.2. Submit
progress
reports
and
issues
encountered
during
the
training
of
school
personnel
to
the
Regional
ITO.
4. Regional
IT
Officer
4.1. Monitor
training
concerns
collected
from
the
Division
ITOs
for
consolidation
and
to
be
reported
to
DCP/ICTS.
4.2. Submit
bi-‐monthly
progress
implementation
and
issues
for
the
region
and
DCP/ICTS;
4.3. Provide
technical
assistance
to
Division
ITO
for
the
resolution
of
issues
on
the
training
course.
C.5.
Acceptance
of
DCP
Packages
at
the
Recipient
Schools
C.5.1.
Policies
1. All
forms/documents
used
during
delivery,
inspection
and
installation
(training
included)
shall
be
completely
accomplished
and
signed.
1. School
Inspectorate
1.1. Signs
IAR
after
the
delivery,
inspection
and
installation
Team
(training
included)
have
been
conducted
and
completed.
2. School
Property
2.1. Affixes
his/her
printed
name,
signature
and
date
on
the
Custodian
or
final
acceptance
(including
the
Delivery
Receipt,
IAR
and
Authorized
Training
Checklist).
Representative
2.2. Returns
original
copies
(with
complete
signatures
of
concerned
personnel)
of
the
said
documents
must
be
returned
to
the
Supplier/ASP
for
payment
purposes.
2.3. Informs
the
Division
IT
Officer
on
the
status
of
the
acceptance
proceedings.
2.4. Furnish
the
Division
IT
Officer
a
copy
of
the
Final
Acceptance
Documents
for
recording
and
future
reference.
3. Division
Supply
Officer
3.1. Assists
recipient
schools
with
regard
to
Final
Acceptance
issues;
and
3.2. Reports
findings
to
Regional
ITOs
and
DCP/ICTS;
3.3. Records
the
delivery
to
their
Property
Card
or
Stock
Card
and
eventually
in
the
Inventory
Report
to
include
the
items
as
Property,
Plans
and
Equipment
(PPE)
or
Inventory
Items.
4. Regional
IT
Officer
4.1. Assists
Division
ITOs
and
recipient
schools
with
regard
to
Final
Acceptance
issues.
5. DCP/ICTS
5.1. Discuss
with
Supplier
issues
with
regard
to
the
Final
Acceptance
of
the
DCP
Package.
C.5.3.
Responsibilities
1.
School
Inspectorate
1.1. Ensure
that
the
delivery,
inspection
and
installation
Team
(training
included)
have
been
conducted
and
completed
before
signing
the
IAR.
2. School
Property
2.1. Ensure
that
all
the
forms
are
signed
by
respective
school
Custodian
or
personnel.
Authorized
2.2. Ensure
that
the
School
has
a
copy
(temporary)
of
the
Representative
Final
Acceptance
documents.
2.3. Ensure
that
a
copy
of
the
Final
Acceptance
documents
(temporary)
to
the
Division
Office.
3. Division
Supply
Officer
3.1. Provide
the
Regional
ITO
copies
of
all
forms/documents
pertaining
to
the
Final
Acceptance
of
the
DCP
Packages
in
the
recipient
schools.
3.2. Provide
copy
of
the
Final
Acceptance
documents
to
the
Division
Supply
Officer
for
recording
purposes.
4. Regional
IT
Officer
4.1. Provide
assistance
to
Division
ITOs
when
needed.
4.2. Consolidate
all
forms/documents
pertaining
to
the
Final
Acceptance
of
the
DCP
Packages
for
future
reference.
D.1.
Recording
the
Receipt
of
DCP
Packages
D.1.1.
Policies
1. To
facilitate
recording
of
the
DCP
Package,
the
Supplier
must
submit
complete,
in
order
and
properly
signed
Final
Acceptance
documents
(i.e.
Delivery
Receipt,
Inspection
and
Acceptance
Report
and
Training
Checklist).
2. Final
Acceptance
documents
will
be
submitted
by
DCP/ICTS
to
the
following
offices
for
recording/payment:
Final
Acceptance
Docs
Copy
1
Copy
2
Copy
3
Delivery Receipt
Training Checklist
3. Asset
Management
Division
–
DepEd
CO
will
generate
the
Property
Transfer
Report
(PTR)
formerly
known
as
the
‘Invoice
Receipt
of
Property
(IRP)’
(see
Appendix
7)
for
Inventory
Recording
of
the
Division
Offices.
4. Accounting
Division
–
DepEd
CO
will
generate
the
Journal
Entry
Voucher
(JEV)
which
completes
the
recording
of
the
DCP
Packages.
D.1.2.
Procedures
4. Asset
Management
4.1. Upon
receipt
of
the
Copy
3
of
the
Final
Acceptance
Division
(AMD)
–
DepEd
documents,
AMD
starts
generating
the
Property
CO
Transfer
Report
(PTR)
which
will
then
be
forwarded
to
the
concerned
Division
Offices
for
Inventory
Recording
by
the
Division
Supply
Officer.
5. Division
Office
(DO),
5.1. Upon
acceptance
of
the
PTR,
the
Division
Supply
Officer
Division
Supply
Officer
records
the
receipt
of
materials
and
equipment
and
and
Schools
Division
include
it
in
the
inventory
of
the
Division
Office.
Superintendent
(SDS)
5.2. After
recording,
the
PTR
shall
be
signed
by
the
Schools
Division
Superintendent
(SDS)
and
then
sent
back
to
the
Accounting
Division
–
DepEd
CO
for
generation
of
the
Journal
Entry
Voucher
(JEV).
5.3. At
the
time
when
the
processed
JEV
arrives,
a
copy
of
which
(together
with
the
finalized
PTR)
will
be
sent
to
the
respective
schools
(if
considered
to
be
Implementing
Units
(IUs)).
If
not,
the
JEV
and
PTR
will
stay
with
the
Division
Office.
6. Accounting
Division
–
6.1. Upon
receipt
of
the
signed
PTR
by
the
SDS,
the
DepEd
CO
Accounting
Division
will
process
the
documents
and
generate
a
Journal
Entry
Voucher
(JEV)
then
forwarded
to
the
Division
Office.
D.1.3.
Responsibilities
2. UNDP
2.1. Ensure
that
all
Final
Acceptance
documents
are
in
order
and
forward
the
corresponding
copies
to
DCP/ICTS.
3. DCP/ICTS
3.1. Ensure
that
all
Final
Acceptance
documents
are
in
order
and
forward
the
corresponding
copies
to
respective
offices
for
recording
purposes.
5. Division
Supply
Officer
5.1. Ensure
the
proper
recording
of
the
IRP
to
facilitate
the
and
Schools
Division
processing
of
the
Journal
Entry
Voucher
(JEV).
Superintendent
(SDS)
5.2. Ensure
that
respective
schools
(IUs)
receive
copies
of
the
JEV
together
with
the
finalized
IRP.
6. Accounting
Division
–
6.1. Ensure
that
the
PTR
has
been
signed
by
the
SDS
to
DepEd
CO
finalize
the
JEV
and
forward
it
back
to
the
Division
Office.
D.2.
Accountability,
Utilization
and
Warranty
of
DCP
Packages
D.2.1.
Policies
1. On
accountability,
the
Asset
Management
Division
(AMD)
of
the
Department
of
Education
require
that
only
those
holding
“Permanent”
positions
should
be
issued
Equipment,
Furniture
and
Office
Supplies
(in
this
case
the
DCP
Package)
through
a
Property
Acknowledgement
Receipt
(PAR)
formerly
known
as
the
‘Acknowledgement
Receipt
of
Equipment
(ARE)’
(see
Appendix
8).
In
case
that
the
Teacher/s-‐In-‐Charge
is
not
holding
a
‘Permanent’
position,
the
PAR
must
be
issued
to
an
authorized
school
personnel
with
a
‘Permanent’
position
and
the
name
of
the
Teacher/s-‐In-‐Charge
of
the
computer
laboratory
be
indicated
in
the
details
of
the
PAR.
2. In
the
event
School
Personnel
with
any
accountability
to
the
DCP
package
(including
its
contents)
will:
• Be
reassigned
to
another
department
within
the
same
school
• Be
reassigned
to
another
institution
other
that
the
school
being
served
• Be
discharged
from
the
service
• Resign
or
retire
from
the
service
• Travel
within
the
country
or
overseas
The
said
individual
shall
turnover
the
accountability
of
the
DCP
package
(including
its
contents)
to
another
authorized
School
Personnel
in
coordination
with
the
School
Property
Custodian
and
Division
Supply
Officer
prior
to
the
issuance
of
a
certification
that
the
person
has
been
cleared
of
all
accountabilities
pertaining
to
tangible
assets.
2. School
Property
2.1. Prior
to
the
issuance
of
the
PAR,
look
into
the
position
Custodian/Division
status
of
the
assigned
Teacher/s-‐In-‐Charge
if
Supply
Officer
‘Permanent’
or
not.
2.2. If
‘Permanent’
issue
the
PAR
in
his/her
name.
Otherwise,
issue
the
PAR
to
an
authorized
school
personnel
and
indicate
in
the
details
of
the
PAR
the
personnel
assigned
as
Teacher/s-‐In-‐Charge
of
the
computer
laboratory
containing
the
DCP
Package.
2.3. When
school
personnel
with
accountability
to
the
DCP
3. School
ICT
Coordinator
3.1. Organize
a
meeting
with
school
faculty/personnel
and
put
together
rules
and
regulations
in
the
utilization
and
security
of
the
DCP
Package/Computer
Laboratory.
3.2. Inform
all
School
Personnel
that
the
DCP
Package
shall
only
be
stored
and
used
within
the
computer
laboratory.
3.3. Put
up
posters/signs
with
regard
to
rules
and
regulations
to
be
followed
in
using
the
computer
laboratory.
3.4. Educate
the
computer
laboratory
users/students
on
the
proper
way
of
using
the
equipment.
3.5. Monitor
computer
laboratory
utilization/activities.
D.2.3.
Responsibilities
1. Principal/School
Head
1.1. Appoint
School
Personnel
for
the
utilization
and
accountability
of
the
DCP
Package.
2. School
Property
2.1. Ensure
the
proper
issuance
of
the
ARE
to
school
Custodian/Division
personnel
and
inform
them
of
their
responsibilities.
Supply
Officer
2.2. Ensure
that
all
necessary
steps
have
been
taken
before
issuance
of
clearance
from
all
accountabilities.
2.3. Ensure
to
keep
track
of
warranty
coverage
of
DCP
Package.
3. School
ICT
Coordinator
3.1. Ensure
to
educate
all
school
personnel
and
computer
laboratory
users
on
the
proper
use
of
the
computer
D.3.
Maintenance,
Troubleshooting
and
Helpdesk
Support
D.3.1.
Policies
1. Supplier
shall
maintain
the
IT
equipment
to
be
functional
and
in
good
running
condition
as
a
whole
package
by
providing
post
implementation
support
and
services
including:
• Operations
and
management
of
all
hardware
and
licensed
software
products
provided
by
the
supplier.
• Setting-‐up
and
managing
Helpdesk
Support
that
shall
accommodate
and
process
all
queries
and
troubleshooting
calls
within
applicable
business
hours
and
business
days.
• Helpdesk
Support
shall
process
the
recipient’s
immediate
hardware
or
software
concerns.
Inquiries
coming
from
the
SMS
ticketing
system
shall
be
addressed
accordingly.
• Deployment
of
support
technicians
for
maintenance,
troubleshooting,
repair
and
replacement
of
defective
items/equipment
purposes.
• A
three
(3)
day
guarantee
to
repair
the
unit/s
upon
receipt
of
request.
• Ensure
availability
of
required
spare
parts
of
hardware
items
for
quick
response/resolution
time.
• In
case
unit/s
cannot
be
repaired
within
the
three
(3)
day
guarantee
period,
the
unit/s
must
be
replaced
within
a
maximum
of
seven
(7)
calendar
days.
Replacement
must
be
of
the
same
brand
and
specifications
and
shall
be
installed
prior
to
the
pull-‐out
of
the
defective
unit/s.
• No
pull-‐out
of
any
equipment
for
repair/replacement
shall
be
made
without
written
authorization
from
the
Supplier
duly
approved
by
the
School
Head
or
his/her
authorized
representative.
• Support
Technicians
deployed
by
the
Supplier/Authorized
Service
Center
to
resolve
problems
in
the
field
shall
issue
a
Field
Service
Report
(see
Appendix
9)
to
the
recipient
school.
1. School
ICT
Coordinator
1.1. Inform
everybody
on
how
to
maintain
and
care
for
the
items/equipment
inside
the
computer
laboratory.
1.2. Monitor
computer
laboratory
activities.
1.3. When
experiencing
hardware,
software,
network
and/or
internet
(if
applicable)
breakdown
or
errors,
record
the
date,
time
and
problem/s
encountered
(include
error/notification
messages
if
present).
1.4. Take
a
photo/video
of
the
problem/s
encountered.
1.5. If
able,
restart/reboot
the
equipment.
3. Supplier/Authorized
3.1. Upon
receiving
trouble
calls,
the
helpdesk
support
agent
Service
Center/
should
introduce
his/her
complete
name
then
gather
Helpdesk
Support
the
following
information:
• School
ID
• School
Name
• Division
• Name
of
caller
• Position
of
the
said
person
• Mobile
number
• Landline
number
(include
area
code)
• Email
address
• Problem/s
encountered
(include
error/notification
messages
if
present).
3.2. Make
an
initial
analysis
of
the
problem
encountered
and
give
probable
solutions
to
resolve
the
problem.
3.3. When
the
initial
actions
taken
to
resolve
the
problem
have
failed,
inform
the
caller
that
the
matter/problem
will
be
referred
to
an
Authorized
Service
Center
to
deploy
support
technicians
to
the
site.
Repair
to
the
unit/s
should
not
exceed
three
(3)
days.
3.4. If
the
unit/s
cannot
be
repaired
within
three
(3)
days,
the
unit/s
must
be
replaced
within
a
maximum
of
seven
(7)
calendar
days.
3.5. If
an
equipment/unit
is
to
be
pulled-‐out
for
repair/replacement,
a
written
authorization
from
the
Supplier
shall
first
be
presented
to
the
School
Head
or
his/her
representative
for
approval.
3.6. Exchange
of
contact
numbers
between
the
recipient
school
and
the
Support
Technician
is
required
just
in
case
some
concerns
need
to
be
addressed.
3.7. Provide
a
Field
Service
Report
to
the
recipient
school
which
will
serve
as
the
record
of
the
transaction
made.
3.8. When
DCP/ICTS
reports
to
the
Supplier
that
some
schools
have
referred
information
that
they
have
pending
concerns
with
regard
to
troubleshooting
and
helpdesk
support,
the
Supplier
should
immediately
1. School
ICT
Coordinator
1.1. Ensure
that
all
computer
laboratory
users
follow
maintenance
and
care
tips
to
prolong
the
life
of
the
items/equipment.
1.2. Document
computer
laboratory
activities
and
concerns.
1.3. Ensure
that
specified
timelines
are
followed
to
address
concerns
promptly.
1.4. Ensure
that
documents
and
contact
information
needed
in
relation
to
maintenance,
troubleshooting,
repair
and/or
replacement
are
readily
available
and
shared
between
parties
concerned.
1.5. Escalate
to
DCP/ICTS
concerns
that
exceed
specified
timelines.
2. DCP/ICTS
2.1. Ensure
that
the
Supplier
will
give
high
priority
in
handling
troubleshooting
and
helpdesk
concerns
that
have
exceeded
specified
timelines.
D.4.
Relief
from
Accountability
in
case
of
Loss
of
any
item
included
in
the
DCP
Package
D.4.1.
Policies
1. DCP
Packages
are
considered
Government
Property,
and
the
Commission
on
Audit
(COA)
is
tasked
to
credit
the
loss
of
such
property
or
take
steps
on
requests
for
relief
from
accountability.
Loss
of
Government
Property
could
be
attributed
to
the
following
occurrences:
• Lost
in
transit
• Theft
or
Robbery/Hold-‐up
• Damaged
item
due
to
improper
use
2. Division
IT
Officer/
2.1. Upon
receipt
of
the
incident
report
accompanied
with
Accounting
Unit/
request
for
relief
of
accountability
(including
supporting
Schools
Division
documents)
from
the
accountable
officer
and
school
Superintendent
involved,
the
Division
IT
Officer
must
inform
the
Accounting
Unit
of
the
incident.
2.2. A
letter
addressed
to
COA
and
signed
by
the
Schools
Division
Superintendent
recommending
the
accountable
officer
be
relieved
of
accountability
must
be
provided.
2.3. When
COA
has
granted
the
request
for
relief
of
accountability
of
the
accountable
officer,
the
Accounting
Unit
must
coordinate
with
the
Accounting
of
the
DepEd
Central
Office
for
dropping
the
lost
item/s
from
the
books
of
accounts.
2.4. Provide
the
DCP/ICTS
a
copy
of
the
incident
report
and
COA
report
granting
the
accountable
officer
relief
of
accountability.
3. DCP/ICTS
3.1. Upon
receipt
of
a
copy
of
the
incident
report
and
COA
report
on
the
granting
of
relief
of
accountability,
DCP/ICTS
will
review
the
school’s
eligibility
and
include
in
future
batches
for
the
DCP.
D.4.3.
Responsibilities
2. Division
IT
Officer/
2.1. Ensure
the
immediate
reporting
of
the
incident
to
Accounting
Unit/
authorities
concerned.
Schools
Division
2.2. Ensure
the
provision
of
all
documents
needed
by
the
Superintendent
authorities.
APPENDIX 1
APPENDICES
Page
Page 245
DepEdDepEd Computerization
Computerization Program
Program (DCP)
(DCP) Orientation
Orientation Handbook
Handbook Page 1
United
Nations
Development
Programme
(UNDP)
edition
APPENDIX
United
1
Nations Development Programme (UNDP) edition
APPENDIX 1
APPENDIX 1
Republic
of
the
Philippines
DEPARTMENT
OF
EDUCATION
DCP
Batch
No.
38
Supplier:
Planson
International
UNDP
PO:
PHL10-‐0000037178
Item
Qty
Description
Required
Dell
Vostro
3900
Desktop
Computer
LAN
Support:
On
Board
10/100/1000
Mbps
I/O
Ports:
6
USB
Ports
(2x
USB
3.0,
4x
USB
2.0),
2x
SATA,
LAN,
2x
PS2,
Mic
and
Headphones
Jacks,
VGA,
HDMI
Audio:
High
Definition
(HD)
Audio
System
Video:
Integrated:
Intel
HD
Graphics
Microprocessor:
Intel
i5-‐4460
Base
Frequency:
3.2
GHz,
Cache:
6MB
L3,
No.
of
Cores:
4
Memory:
1
x
8GB
DDR3
(Expandable
to
16GB)
Hard
Disk:
500GB
7200
rpm
(SATA)
Dell
USB
Keyboard
–
US
English
layout,
Dell
USB
Optical
Mouse
Pre-‐installed
Software
and
Applications:
Windows
10
“Shape
the
Future”,
Microsoft
LOE
provided
by
DepEd
NetSupport
School
Classroom
Management
Software
1a
51
each
E-‐Learning
Materials
Provided
by
DepEd
DepEd
Logo
Installed
in
the
PC
Bios,
Logo
Design
in
Softcopy
Provided
by
DepEd
One
Step
Recovery
Key
(F1
to
F12)
Copy
of
Recovery
Image
in
DVD
Format
to
be
Provided
for
Each
Recipient
School
and
One
Master
Copy
for
DepEd
Central
Office
HDD
Partitioned
in
Two
Drives:
Drive
C
(System)
and
Drive
D
(Data).
Approximate
Hard
Disk
Partitioning:
•
10%
Per-‐Installed
Recovery
Partition,
Not
Active,
Primary,
Hidden
•
40%
System
And
Software,
Primary,
Active
•
40%
Data
Logical
•
10%
Pre-‐Installed
Image
In
Standard
Dvd
Size,
Iso
Format,
Hidden
Certifications,
Regulations
and
Standards:
Motherboard
Will
Bear
A
Visible
Manufacturer
Serial
Number
Iso
9001:2008
Certified,
Iso
14001:2004
Certified
APPENDIX 1
Training
Provider
Contact