No Items/Activities/Documents/Reports/Notice mobilization Activities 1 Kick Off Meeting √ 2 Organization Chart √ 3 Key Personnel Resume for Review √ 4 IC/CIDB Cards/Work Permits (for foreigners) copy submission √ 5 HSE Officer Green Book Certificate/SHO registration with DOSH √ 6 Equipment List + all necessary documents, driver licenses, √ equipment checklist, PMA certificates, Road Tax & insurances 7 Lifting Plan for pile unloading √ 8 Calculation of pile hammer (Hiley's formula) √ 9 Mill certificate of piles and company profile of supplier √ 10 Trial Mix for the concrete √ 11 Laydown area design √ 12 Environmental plans & implementation √ 13 Topo Survey, Jupem BM √ 14 JMS & JSA of all activities √ 15 Lightning Arrestor and safety evacuation plan √ 16 Fire Extinguishers √ 17 Project Execution Plan √ 18 Health Safety and Environmental Management Plan √ 19 Logistics Plan √ 20 Labour Recruitment Plan √ 21 Emergency Preparedness Plan √ 22 Quality Management Plan √ 23 Quality Control Plan; ITP’s & Checklists √ 24 Change Request Register √ 25 Electrical Capabilities/Certificates of the workers. √ 26 Site facilities within 10 days - TCF facilities drawings. √ 27 Procedures for commissioning and performance testing, refer to √ Schedule 9A (HV Facility Performance Testing); 28 Procedures for commissioning and performance testing, refer to √ Schedule 9B (Testing & Commissioning. PPA Requirements); 29 Procedures for commissioning and performance testing, refer to √ Schedule 9C (Plant Performance Testing. SPP Works); 30 Schedule 29 (Project Documents) √ 31 A1 size copies of IFC drawings √ 32 Approved Lab/3RD party for related testing (MLT, PDA, PIT etc.) √ 33 Survey report signed by qualified surveyor √ 34 WPS, WQT, PQR (Welding documentation) √ 35 Temporary water, toilet facilities √ 36 Permit to work system √ 37 Approved hammer system provided in data sheet √ 38 Hammer approval letter √ 39 Requirements for protection of existing structures (vibration & √ excavation) 40 Required inspection & reporting forms √ 41 Check size of piles √ 42 In case of defects, explain in notes and comments √ 43 Mill certs report on piles √ 44 Maintain a pile record book √ 45 Proper number of piles being recorded √ 46 Daily, weekly, monthly reporting √ 47 Site communication plan √ 48 Logistics & transportation √ 49 Material storage √ 50 Change management plan √ 51 Rework procedure √ 52 Request for Inspection Notice (RFIN) √ 54 Approved construction material& supplier √ civil/structural,architectual,m&e material) 55 Approved lab/3rd party for related testing(soil,concrete,trial √ mix,steel,anchor bolts,…etc) 56 Approved batching plant √ 57 Mix design and trial mix approval for concrete √ 58 Survey and setting out of building √ 59 Survey report √ 60 Underground survey (if required) √ 61 Barbending schedule √