PROCESS
AREA 1A
Feed:
Light naphtha:
Heavy Naphtha:
Unit total shutdown. Reaction section pressure @ 2.25Kg/cm2g. Regenerator pressure @0.9Kg/cm2g.
RT on D-1306 done during the night.
Unit shutdown.
R2303: catalyst loading completed and now boxed up.
R2302: catalyst loading is not started yet (0 drums of UOP I-8 plus PENEX /151 drums need to be loaded).
Pressurized T-2302 to 0.7Kg/cm2g & T-2301 to 3.4Kg/cm2g.
AREA 1B
Unit maintain inventory with crude and flushing oil; Pressure is kept at 0.5bar.
Drain and inerted the HGO line from outlet of E-1119 to B/L
P1101A and P1106B are isolated and inerted for maintenance.
D1106 – level gauge is dismantled for repair.
Scaffolding is being installed for inspection of the heater.
TV-015B dropped for maintenance.
Unit shutdown.
AREA 2
Feed circulation and Slurry circulation going on. HCO flushing oil system is operational. FD Fan (C-1502A) is
kept running to ventilate 1st Regenerator (D-1502).
Main fractionator: switched the blind between Main fractionator and the reaction section at 1000H (info).
Sometime make up LGO to D1518. Main Column Bottom level is intermittently routed to Tk-3801A.
Repairing PV-1501, not yet completed.
Open manhole at 1st regenerator.
Unit shutdown.
Page 2 of 10
Unit shutdown.
Unit 24: LCO Fire hydrant in between U-24 & U-18 is leaking isolated supply and work request prepared. The
butterfly valve is passing.
Feed:m3/h.
LCO R/d:m3/h
Unit total shutdown. Reaction Loop @ 29Kg/cm2g and fractionation Loop @ 7Kg/cm2g.
H-2401 with one pilot burner in service.
COLD UTILITIES
TK-3101 A/B (fresh water): % 41 Target 051FQI-047 (Fresh water supply): 1391065 Target
Tk-3103 A/B (demin water): % 91 - Chloride (031AI-521/621) mg/l 0.002 < 0.1
Conductivity 031AI-541/641 : µs/c 0.14 <4 Silica content (031AI-552A/B) ppb 6.28 <20
Conductivity 031AI-551/651
0.08 <0.2 DW consumption (m3/hr) 137
(after mixed bed) : µs/cm
Page 3 of 10
Pump in service P-3301B & D Sea water Temp. in/out : oC 30.10 / 30.42
Maintain in GAN mode due to high consumption from RFCC and liquid filling to V-3602.
Page 4 of 10
Outer steam at 2.2 t/h (10% open) while inner steam at 38t/h (flow rate not correct, valve opening at 6%
and work request already raised).
D-5702 temperature at about 29oC. level = 9.8%
4 aerators A5821E01A, B, C & D running in AUTO mode. Aeration basin A5821-TK02: pH = 6.86; O2=
4.81mg/l. Tk-5804 level = 59.07%
HOT UTILITIES
BOILER
Boiler A (DO @ 66t/h) manual mode & B (DO @ 61t/h) auto mode in service with total steam production @
127tons/h.
P-4032 is running, P-4033 standby. P-4031 lined up after strainer cleaning.
Boiler D is minimum firing with burner 3 using Diesel Oil temperature at 177oC.
Boiler C shut down for maintenance.
STG/EMCS
Page 5 of 10
P-5501B and P-5502B are both running for flushing oil supply.
Tk-5106A is the temporary LSO tank for other units.(info)
Tk-5106A outlet line and emptying line is now isolated and padlocked, key is with the Refinery shift
supervisor.
Tk-5107 & Tk-5109 remain on MOS due to erratic alarm on high-high & low-low level, MOS and work request
prepared.
P-5101B is running to supply LPG for U-37
Tk-5603 – filling up water to 14.18 meter completed @ 0350H (22/08/09) and now holding.
Tk-5604 – Draining water in progress.
Page 6 of 10
SPM HULL HPU header pressure 273 kg/cm2g & TT HPU Header pressure 231.9 kg/cm2
Page 7 of 10
Page 8 of 10
Note: Tk-5603 filling up water for mechanical seal test finished, now on holding time.
Tk-5604 water draining after mechanical seal test is in progress.
Page 9 of 10
Product Tanks
Page 10 of 10