Dated: 08/01/2018

TO,
MR. RATHI JI
Bikaner, Rajasthan

Subject: Techno Commercial proposal for 40 TPD Capacity


Calcium Carbonate Plant Machinery.

Dear Sir,
We thank you very much for the kind courtesy extended to us during our
discussion, we are pleased to note your interest in 40 TPD capacity calcium
carbonate plant machinery and send herewith our techno commercial budget
details.
I hope you will find our details in line with your requirements and should you
have any inquiries we are at your service.

Regards

Pawan Kumar
356, Brahampuri,
Muzaffarnagar – 251 001 (U.P.)
Mobile : 09760005051
08899136283
Land Line: 0131-2442265
Email : pawan.208@rediffmail.com
40 TPD CAPACITY PLANT & MACHINERY (PCC)

(A) LAND : 30000 M2


(B) BUILDING : Plant machinery process Shed-1 : 60'×270' Rs. - 60,00,000.00
(C) CIVIL FOUNDATIONS APPROX : Rs. - 25,00,000.00
(D) Labour Quarters and Offices Rs. – 20,00,000.00
(Total A) Rs. 1,05,00,000.00
PARTICULRS OF MACHINERY PROPOSED TO BE BOUGHT OF
FABRICATED
S. Description including broad Name of Qty. Unit Rate Amount
No. specification manufacturer
/ Supplier /
fabricator

1 2 3 4 5 6

1 LIME KILN 40 TPD of PCC Site 01 80,00,000.00 80,00,000.00


Fabrication
Dia 9', H-63' through
Contractor
Suitable to produce 40 TPD of PCC,
complete with skip Hoist Track,
Trolley, Winch, Wire Rope, Limit
Switch, Hydrolic Break, Continious
Discharge Rotery valve, Breaking
beam, Anchor Frame, top charging
cone which lever operated winch,
Lime stone charging hopper,
insulation with Mineral Wool Cold
Face, Insulation Brick, Moderate
heat, High Heat & super Heat duty
Fire brick, burner Block, Co firing
burners, Back fire protection device.
Digital thermo couple, meno meters
for measuring the temperature in
various sections of the kiln furnish
temperature & CO2 Gas
Temperature.

Temperature of discharged lime


should be less than 40ºC
temperature of CO2 should be less
than 250ºC shell Temp. should be
less then 60ºC supervision for
erection of commissioning.

2 Producer Gas Generator revolving Order or site 01 22,00,000.00 22,00,000.00


grate type, inside diameter complete fabricated
with air blower, reduction gear box
cyclone separate, double lock, coke
feeder, coke storage, hopper, bucket
elevator, fire brick lining suitable to
gasify 8 TPD of coke/charcoal.
3 Roots blower of capacity 2200 cfm Order 01 3,50,000.00 3,50,000.00

(M/s Swam
or Averst)

4 Vibrator Screens for final filtration Fabricated or 03 2,00,000.00 6,00,000.00


of Lime slurry. Order

5 Hydrolizer Lime slaking tanks filled Site 02 4,00,000.00 8,00,000.00


with slakers agitators, gear box, G.M. Fabrication
Bush, Thurst Bearing, SKF 29015
pully etc.

6 Lime preparation tank with turbine Site 03 4,00,000.00 12,00,000.00


type agitators Dia 10’ H 10' Fabrication

7 M.S. CO2 Reaction vassels, Circular Site 05 6,00,000.00 30,00,000.00


1680mm bore at centre & and 1500 Fabrication
mm boe at ends, with all length 5200
mm with agitator and complete
assembly.

8 Chalk Slurry washing and settling Site 08 4,00,000.00 32,00,000.00


tank fitted with agitators variable Fabrication
speed driver / reduction Gear Boxed
etc.

Dia 9', H-10'

9 Vibro screens 48" Dia screening Site 04 2,00,000.00 8,00,000.00


Area single deck self balancing, fitted Fabrication
with 250/300/350 mesh SS 304
wire mesh screening with SS 304
contact parts.

10 Electric Motors Order 10,00,000.00

11 Main Control Panel with Branch Order 16,00,000.00


Panel with cable

12 Rotary Vacuum filter (6x5) – SS – Order 01 9,00,000.00 9,00,000.00


304 Accessories

13 Electric Cable Order 12,00,000.00

14 Process pumps Order 14 4,50,000.00

15 Valve Order 7,00,000.00

16 Gear Boxes Order 15,00,000.00


17 Belt, Pully, Pattas Bearing Net Bolts, Order 12,00,000.00
Flanges, Bands socket etc.

18 Film Dryer – SS-304 Accessories Order 08 8,50,000.00 68,00,000.00

19 Boiler 6 MT Per HR, 1800C Temp., Order 01 70,00,000.00 70,00,000.00


11.54 Kg/cm2 working pressure –
Complete in running condition

20 Laboratory with equipments and Order 4,00,000.00


chemicals

21 Bore well Order 01 6,00,000.00 6,00,000.00

22 Workshop Items Order 4,50,000.00

23 Transformer Unit Order 6,00,000.00

24 Weight Bridge – 80 ton Capacity Order 8,00,000.00

25 DG Set – 320 KVA Order 20,00,000.00

Total B 4,73,50,000.00

Miscellaneous Expenses 15,00,000.00

Total (B) 4,88,50,000.00

Grand Total (A + B) = 5,78,50,000.00