DELIVERABLE #5
CONTENTS AND CRITERIA
TABLE OF CONTENTS
1 Objectives ............................................................................................................................ 2
3 Scope ................................................................................................................................... 2
5 Submission Instructions...................................................................................................... 7
1
Deliverable #5 – Contents and criteria
1 Objectives
The Deliverable #5, is the Construction Documents’ phase deliverable, and its objectives are:
1. Present the information that define the construction of the houses and its assembly
process at the Solar Hai; showing the graphic representation of the work to be done
and including all necessary details and information of its systems, materials, and
equipment.
2. Show that the project is in line with the goals of the SDME.
3. Demonstrate that the project complies with the Competition's Rules and Building
Code.
4. Update and enhance the information presented in the Deliverable #4.
All materials and documents submitted by the teams must comply with SDME 2018 Rules and
Building Code.
Content, text, and people in the technical and communication materials must comply with the
Rule 3-4 SDME Conduct and Dress Code.
3 Scope
The Deliverable #5 includes the Project Documentation #3, the Design Approval Documents
DA#1, the Simulation Input Report SIR#1, the Electric and PV Chart and Checklists PV#2, and
the Press Kit PK#4.
2
Deliverable #5 – Contents and criteria
The construction documents define the quantities and qualities of, and relationships among,
all materials required to construct, assemble and disassemble the houses. These documents
include all the building systems, product selection, and information necessary to guaranty the
project constructability. They must be complete and accurate enough to:
SDME Organization will not publish or share the Project Documentations submitted in this
deliverable. These drawings and documents are confidential.
1. Cover Sheet
2. Summary of Changes (No required in this Deliverable)
3. Table of Contents
4. Rules and Building Code Compliance Checklist (Refer to Appendix 2)
5. Contests’ and Special Awards Supportive Information (Refer to Appendix 3; Updated info
and new sections)
5.1. Architecture Concept and Design (Refer to Appendix 2.1)
5.2. Engineering and Construction Design Narrative (Refer to Appendix 2.2)
3
Deliverable #5 – Contents and criteria
Teams must submit two simulation reports: Comprehensive House Performance Report and
Electrical Energy Balance Report.
4
Deliverable #5 – Contents and criteria
…
Note: 1. Media types: TV, Radio, Newspaper, Magazines, Journal, and Web.
The content of the Teams’ Press Kit is public information. It might be shared through the
SDME 2018 website and social media, in addition to SDME communication efforts.
Confidential information and images must not be included in the Press Kit.
Names and logos: The team and the project may have the same or different names and logos.
Please, include the team´s name and logo, as well as the project's name and logo, if they are
different. The logo image must be included in the Press Kit document and submitted as
independent vector image file (ai or eps).
5
Deliverable #5 – Contents and criteria
Photo(s) of Team Members: An updated group photo of all the team members must be
included with each deliverable. The images included in the Press Kit document shall also be
submitted separately as high‐resolution files.
Team mission statement: A short paragraph explaining the team’s mission statement. This
section can be revised from one deliverable to another.
The Team and its goals: The team shall provide a 100‐word description of the team and its
goals. This section will be used by the organizers for outreach and it will be placed on the Solar
Decathlon Middle East website. The content of this section can be revised form one deliverable
to another.
Current design rendmeters: Four high‐resolution architectural renderings of the house: two
exterior views and two interior views.
Team contact information: The submitted information will appear on the SDME website with
the full name of the team contact person and his (her) email and phone number.
Web pages and social media links: Include the Team Web page URL, and its social media links
(Facebook, Instagram, Twitter, YouTube, Vimeo, Flicker, etc.)
6
Deliverable #5 – Contents and criteria
5 Submission Instructions
5.1 Deliverable Submission Instructions
Each team should follow the defined schedule in sending the deliverables in the stipulated
format at the specific due dates and following the guidelines of the SDME 2018 Organization.
Deliverables are considered on-time if they are received by the SDME 2018 Organization by
10:00 a.m. in Dubai (UTC/GMT +4 hours) on the respective due date. Deliverable #5 files must
be submitted electronically, via the internet.
In addition of the regular PDF files, scanned PDF copies of the signed and stamped structural
and electrical drawings and calculations must be also submitted, in compliance with the Rule
6‐1.
Teams that are not sending the deliverables on time, or not fulfilling with all the content
requirements, will be subject to penalties, refer to Rule 2‐8.
All the deliverables submitted are the property of the SDME 2018 Organization.
7
Deliverable #5 – Contents and criteria
Multimedia Requirements
a). Vector artworks must be submitted in their original file format (ai or esp).
b). Photographs shall be submitted in the native format of the camera, such as JPEG or RAW.
c). Color photographs must be in RGB, 8-bit color.
d). Files produced in pixels, as photographs and renderings, shall be submitted in high-
resolution images (minimum 1632 pixels in shortest dimension).
e). For multimedia files to be properly credited, the following information shall be included in
each file’s metadata or a text file accompanying the multimedia files:
- Name, e-mail and affiliation of the photographer or graphic creator
- Multimedia file editor’s name and affiliation.
- For photographs, please indicate the date and location, and identification of any
individuals visible.
The deliverable will be “on time” if they are received by the Competition Manager before 10:00
a.m. Dubai time (UTC/GMT +4 hours), Wednesday, February 14, 2018.
8
Deliverable #5 – Contents and criteria
0. GENERAL (GE)
GE-001 Cover sheet
GE-101 Sheet List
GE-201 General legend and notes
GE-301 Exterior Renderings
2. ARCHITECTURAL (AR)
AR-001 Solar Hai Plan (Indicating the Team's lot)
AR-002 Site Plan (Including the exterior elements)
AR-011 Ground Floor Plan
AR-012 First Floor Plan (If any)
AR-021 Roof Plan
AR-101 Building Elevations
AR-201 Longitudinal Sections
AR-211 Transversal Sections
AR-301 Window Schedule and Details (Included thermal transmittance)
AR-311 Door Schedule and Details (Included thermal transmittance)
AR-321 Floor Construction Details (Included thermal transmittance)
AR-331 Roof Construction Details (Included thermal transmittance)
AR-341 Wall Sections and Construction Details (Included thermal transmittance)
AR-351 Partitions Details (Included thermal transmittance)
AR-401 Terraces, ramps, stairs and railing drawings and details.
4. INTERIORS (IN)
IN-001 Floor plan
IN-101 Reflected ceiling
IN-201 Interior Elevations
IN-301 Furnishings and furniture details (if designed by the team)
IN-401 Kitchen Plan (Furniture and Appliances)
IN-411 Kitchen Elevations (Furniture, Appliances and Details)
IN-501 Bathroom plan (including tables of Fixtures and Accessories)
IN-511 Bathroom elevations and details (Fixtures and Accessories)
IN-601 Interior Renderings
9
Deliverable #5 – Contents and criteria
5. STRUCTURAL (ST)
ST-001 Foundation Plan and Details
ST-011 Structural Floor Plan(s)
ST-021 Structural Roof Plan
ST-101 Structural Sections
ST-201 Structural Blow ups
ST-301 Structural Details (including railings, solar systems support structure and any site or free-standing element)
7. PLUMBING (PL)
PL-001 Plumbing Plan-Supply and removal (including the legend)
PL-011 Roof plan (indicating vents and solar thermal system - if apply)
PL-101 Tanks (deposits) floor plan (indicating the tanks location and points of water filling and emptying)
PL-111 Tanks (deposits) details
PL-201 Supply (cold and hot water), isometric and details
PL-211 Grey Water system, isometric and details (including treatment and filtering systems)
PL-221 Drain / Waste / Vents, isometric and details
9. MECHANICAL (ME)
ME-001 HVAC distribution Plan (including the legend)
ME-011 HVAC equipment and details
ME-101 Mechanical room plan and interior elevations
ME-231 Control and automatization systems
10
Deliverable #5 – Contents and criteria
15. HEALTH AND SAFETY (HS) (See H&S Rule in the SDME Portal)
HS-001 Health and Safety Drawings
Notes
1. Add pages as needed. (Only change the third digit of the page ID, e.g. AR-021 Ground Floor Plan & AR-022 Second Floor Plan)
2. In floor plans, indicate the finish floor levels and clearly indicate any change of level.
3. The north shall be indicated on all site, floor and roof plans.
4. The scale of the drawings will be selected considering the real size of the object, the level of detail that is required, and the size of
the pages (A3). Suggested scales for drawings:
- Site Plans (1:100)
- Floor Plans, Elevations, and Sections (1:50)
- Site Plan and Elevations for the Solar Envelope (1:200 or 1:100)
- Footprint and Measurable Area plans (1:100)
5. Graphic scales must be included in all scaled drawings.
6. Inside logistic: detailed process of approximation of transport vehicles, up to their arrival at the lot. These drawings shall include
the type and number of vehicles, order of entry, dimensions and load per axle of each vehicle, turn ratios, characteristics and
dimensions of the load to be transported (with the weight of all the elements), way to proceed with the unloading, etc. The lot,
accesses, loading and unloading area, elements and materials stock area and footprint of the house.
7. Assembly/ disassembly: Plan for the assembly and disassembly. It will include graphics with the assembly and disassembly phases,
work units, persons that will take part, necessary machinery, auxiliary resources, necessary timing, etc.
8. There are three main drawings that are required for the public tour. The first is PT-001 site accessibility where the pathway for
public to access the house should be shown taking to account the public area in the solar hai where the pedestrians are and the
walkable area in the team’s lot (tour route outside the house). The other is PT-101 house tour floor plan. This documents should
include the tour’s route (inside the house) where the ramp information, changes in elevation, spaces between furniture, width of the
door, gates, and corridors and any other aspect related to the accessibility. PT – 201 house tour general information indicates where
the teams’ stopping points will be for explanation.
11
Deliverable #5 – Contents and criteria
Teams must fill in each of the aspects required, specifying the drawing or section where included.
No. Rule Requirement Drawing(s)/Report(s)
3-2 Team Officers List of Team Officers and their Contact Information
4-4 Footings Drawing(s) of the low impact footing system
4-13 Electrical Vehicles Drawing showing the parking area for the electrical vehicle
Dimensioned drawing(s) showing the location of all house
5-1 Solar Envelope and site components and their realtion with the solar
envelope
Dimensioned drawing(s) showing Architectural Footing
6-2 Architectural Footprint
compliance
Dimensioned drawing(s) showing Measurable Area
6-2 Measurable Area
compliance
Drawing(s) showing the accessible public tour route,
6-3 Entrance and Exit Routes specifying the entrance and exit of the house to a street of
Dubai Solar Hai.
6-4 Minimum requirements Drawings showing the workstation location
PV modules, inverters and interface protection equipment
7-3 PV Equipment Eligibility are included in the DEWA-Shams Dubai List of eligible
equipment or the information for the evaluation is supplied.
Drawings showings the AC side maximum power level of the
7‐5 Inverters
grid‐tied solar power inverter(s).
Drawings showing the energy storage capacity of the, as per
7‐6 Batteries
the manufacturer specifications.
Drawing(s) describing the operation of the desiccant system
7‐9 Desiccant Systems
and corresponding specifications
Containers and their Drawing(s) showing the location of all the water tanks and
8‐1
location their capacity.
8‐5 Grey Water Specifications for greywater reuse systems
Drawing(s) showing the artwork, content, and design of the
11-4 Team Uniforms
team uniform
Drawing(s) showing the public tour route, indicating the
12-4 Public Tour dimensions of any narrow area in the route, complying with
the accessibility requirements
House Functioning - Drawing(s) showing the clothes drying method and the
Contest 5
Drying Method place where the clothes will be dried.
House Functioning -
Contest 5 Drawing showing the location of the appliances
Appliances
12
Deliverable #5 – Contents and criteria
13
Deliverable #5 – Contents and criteria
14
Deliverable #5 – Contents and criteria
1. Introduction
a) Description of the house envelope including its thermal and optics characteristics.
b) Passive design strategies including project geometric, shading devices, orientation of the spaces, buffer zones,
and any other strategy that could contribute to the house energy efficiency.
b) Housing unit modeling assumptions including internal gains, occupancy behavior patterns, ventilation and
comfortable temperature.
c) HVAC systems
a) Passive analysis: Simulation of house performance using only ventilation (without AC), to determining the
thermal requirements and the predicted indoor temperatures and cooling loads using only passive strategies.
Results and Discussions.
b) Active analysis: Simulation of the house performance with HVAC equipment, to determining the predicting AC
energy demand (Tint ≤ 24 ⁰C). Results and Discussions.
5. House performance during the contests period (For the next deliverable)
6. Conclusions
15
Deliverable #5 – Contents and criteria
A report about the electrical energy balance of the household for the typical generation and consumption
conditions. It must include at least the following aspects :
1. Introduction
Description of the methodology for the estimate of the electrical production and the environmental benefits.
2. List of the electric loads (household appliances, lights, etc.) used in the household
Includes the main technical characteristics given by the manufacturer, and the estimated consumption for their
use during the Contest Week.
Necessary information about the PV system (types of modules and wiring), inverter(s), batteries, etc.
These could be commercial software or tools created by participating teams, in which case the algorithms used
must be included.
5. Simulations
b) Contests period energy simulation - daily and general results (For the next deliverable)
a) Standard PV system
b) BIPV systems
c) Energy Balance
a) Standard PV system
b) BIPV systems
8. Conclusions
Notes :
16
Deliverable #5 – Contents and criteria
1. There are no restrictions on the simulation tools that can be used for this analysis, but all such tools should be identified.
3. For the simulations, the weather file furnished by the SDME Organization shall be used.
5. For the environmental indicators of PV refer to the report IEA-PVPS-T10-01:2006 that is available on the website of the
International Energy Agency – Photovoltaic Systems Programme - Task 10 – www.iea-pvps.org.
17
Deliverable #5 – Contents and criteria
18
Deliverable #5 – Contents and criteria
1. Introduction
The objective of the Site Operations Plan (SOP) is to ensure that the competition deadlines will be met, providing
a realistic, logic and safe procedures and schedules for both, assembly and disassembly of the houses. In the
developing of their SOP, the teams must take into account all of the activities, resources, needs to assemble and
disassemble their houses as well as the inspections and competition deadlines.
The SDME organization will develop the General Site Operations Plan of Dubai Solar Hai; based on the
information sent by each of the teams.
19
Deliverable #5 – Contents and criteria
20
Deliverable #5 – Contents and criteria
21