Perencana Kegiatan
Pelaksana Kegiatan Realisasi
Jumlah
No Jenis Kegiatan Penerima
Satuan Volume DAK Pendamping Total Biaya Swakelola Kontrak Fisik Keuangan
Manfaat
(Rp.) (Rp.) (Rp.) (Rp.) (Rp.) % %
1 2 3 4 5 6 7 8 9 10 11 12
1 Pengaspalan Jalan AC - BC Km 17.577 20,652,975,000 - 20,652,975,000
(100) Ruas Sumber Rejeki - Kukutio Km 7.700 9,047,500,000 - 9,047,500,000 - 8,720,623,000 100% 100%
(106) Ruas Tandebura - Ranomentaa Km 3.410 4,006,750,000 - 4,006,750,000 - 3,806,129,000 100% 100%
(094) Ruas Wolulu - Polinggona Km 3.830 4,500,250,000 - 4,500,250,000 - 4,321,802,000 100% 100%
(061) Ruas Puundoho - Puubunga Km 2.637 3,098,475,000 - 3,098,475,000 - 3,060,000,000 100% 100%
Perjalanan dinas ke lokasi kegiatan dalam rangka evaluasi dan monitoring Keg. 1.00 50,000,000 - 50,000,000 50,000,000 - 0% 80.21%
Pengawasan Pengaspalan Jalan AC - BC Ruas (061) Puundoho - Puubunga Keg. 1.00 81,115,000 - 81,115,000 - 80,000,000 100% 100%
Kec. Baula
Penguatan data base dan survey kondisi Keg. 1.00 244,350,000 - 244,350,000 244,350,000 - 0% 100%
Penyusunan laporan pelaksanaan kegiatan DAK fisik Keg. 1.00 15,000,000 - 15,000,000 15,000,000 - 0% 100%
Honor petugas pelaporan E- Monitoring DAK Keg. 1.00 9,000,000 - 9,000,000 9,000,000 0% 66.67%
Kolaka, Desember
Ya Ya
Ya Ya
Ya Ya
Ya Ya
Ya Ya
Ya Ya
Ya Ya
Ya Ya
Ya Ya
Ya Ya
Ya Ya
Ya Ya
Ya Ya
Ya Ya
Jl. Mekongga Indah Kel. Tahoa Telp. (0405) - 21065 Kolaka 93517
L A P O R A N K E G I ATA N D A K P E N U G A S A N
TRIWULAN IV
BIDANG BINA MARGA
TA H U N A N G G A R A N 2 0 1 7
DATA DD 1 KABUPATEN KOLAKA