ETAP Page: 1
12.6.0H
Location: Date: 01-06-2018
Contract: SN:
Engineer: Study Case: GRD1 Filename: TPterreG2
Revision: Base
Frequency: 50,0
Revision: Base
System Data:
Soil Data:
Conductor & Rod Copper, annealed soft-drawn 100.0 0.00393 234.0 1083.0 1.72 3.42
Rod Data:
Grid Configuration:
Cost:
Conductor Rod
Total Total Length Cost Total Total Length Cost Total Cost
No. m $ No. m $ $
31 4960.00 49600.00 128 390.40 12800.00 62400.00
Project:
ETAP Page: 3
12.6.0H
Location: Date: 01-06-2018
Contract: SN:
Engineer: Study Case: GRD1 Filename: TPterreG2
Revision: Base
Rg GPR
Touch Potential Step Potential
Ground Ground
Resistance Potential Rise Tolerable Calculated Calculated Tolerable Calculated Calculated
ohm Volts Volts Volts % Volts Volts %
0.151 4756.9 826.8 708.0 85.6 2836.3 434.4 15.3
Maximum Grid Current: 31.550 kA Surface Layer Derating Factor (Cs): 0.948
Warnings:
The short-time temperature rise of ground conductors and/or rods exceed the limits
Grid area is smaller than 6.25 m² or greater than 10,000 m²
- Correction factor for grid geometry regarding touch voltage (Kim): 2.938
- Correction factor for grid geometry regarding step voltage (Kis): 2.938
- Corrective weighting factor that adjusts for the effects of inner conductors on the corner mesh (Kii): 1.000