Finishes Target Vs Achieved

DQ Marriott Project
4-Jan-18 False Ceiling Works Wall Painting Works Wall Tiling Works Floor Tiling Works
MEP False Grid Works Grid Works False Ceiling False Ceiling Wall Floor Screed
Fire sealent Plaster Ceiling Primary/Secondary Wall Studs/ Wall MEP Wall Wall Tiles/Marble
Builders Work Ceiling (Dry Area (Wet Area works (Dry works (Wet Wall Boarding Tiles(Wet Clearance for
Application Clearance Painting paint on walls Waterproofing- 1 Lining Clearance Waterproofing-2 Flooring
Clearance Only) Only) Area) Area) area) Tiling
Achieved GF 49 49 47 42 48 8 40 3 18 49 49 45 45 29 29 15 45 40
Achieved L1 82 82 79 79 81 17 69 11 46 77 82 80 79 70 67 56 76 70
Achieved L2 88 83 51 61 77 0 26 0 5 38 79 40 27 18 7 0 42 39

Achieved Total (Dec'17) 219 214 177 182 206 25 135 14 69 164 210 165 151 117 103 71 163 149
Target Total (Dec'17) 220 220 220 220 220 220 220 210 210 175 220 220 220 190 190 136 175 150
Balance 1 6 43 38 14 195 85 196 141 11 10 55 69 73 87 65 12 1