Prashant Rao
Chief Signal & Telecomm Engineer
Slide 1
Delhi – the need for a mass transit system
Slide 2
DMRC today
• DMRC was then given a mandate to
construct >50 kms of Metro Rail tracks in
Delhi by 2005
Slide 3
Slide 4
DMRC phase 2 lines - by 2010
Slide 5
Metro Rails Major Building Blocks
Slide 6
Radio system Requirement
• Security Staff
Slide 7
Why TETRA
• TETRA was selected as the radio technology for the following
reasons:
– Open Standards
• Guaranteed minimum performance (~ 500 ms setup time)
• Provides evolutionary growth
• Sourcing from more than one vendor
• Competitive pricing
– Frequency efficient
– Group & Private Call
– Integrated voice and data
– Full Duplex
– Resilience
• Site Trunking
• DMO
Slide 8
DMRC Radio System
• Operational from 2002
Slide 9
System Sizing
• Phase 1 Phase 2
– Central Network Equipment – Standby Central Network
(SwMi) at Master Site Equipment (SwMi)
– 15 Radio Base Stations – 19 Radio Base Stations
– 12 Customized GUI – 17 Customized GUI
Dispatchers Dispatchers
– 120 Trainborne Mobile – 248 Trainborne Mobile
Radios Radios
• Mobile Radio, Train • Mobile Radio, Train
Control Interface, Radio Control Interface, Radio
Control Panel Control Panel
– 60 Fixed Radios – 122 Fixed Radios
• Standard Mobile Radio • Standard Mobile Radio
installation installation
– 500 Portable Radios – 600 Portable Radios
Slide 10
Slide 11
Radio Dispatch sub-system
• The radio dispatch application was
customized according to DMRC’s
operational requirements.
Slide 12
Trainborne equipment
• Implemented in front and rear cab
• Operating in main and standby
Slide 13
Trainborne Radio Equipment Architecture
TRIU
MR MR TRIU
CPU CPU
TRCP TRCP
I/O I/O
DC/DC DC/DC
Mobile Radio
Train Radio Control Panel
Train Radio Interface Unit
Slide 14
Radio Coverage in Underground
Slide 15
Further
ext
16
Slide 18
Radio CNE
Slide 17
Radio Tower (50 m)
Slide 18
Remote Base Station (BTS)
Slide 19
STATION RADIO PHONE
Slide 20
Conclusion
• TETRA communication system has been
implemented successfully
Slide 21
THANK YOU