1.0 INPUT DATA


The wieght of fluid……….………………………………………………… 10 kN/m3
The weight of pipe 400 mm dia……….………………………………….. 95.5 kg/m
Adopted steel grade……………..…… ASTM A36 yield stren..Py= 245 N/mm2
The strength of the weld (Fexx=60% of Py)…….…………….…..Pyw= 147 N/mm2
The distance between two supports verticaly………..….……………L= 1 m
The galvanized/ductile iron steel friction assumed………….…………. 0.3
The pipe center line offset from the wall……….………………………… 1.5 m
The compressive strength of concrete after 28 days……….…...... fc'= 35 MPa
The density of the steel...……….………………………….………...γs= 7860 kg/m3
The earthquake zone, as per consultant instruction………....…..zone 0
The pipe diameter………………………………………………………..D= 400 mm
The clamp thk……………..…………………………………………. ...T= 10 mm
The width of clamp.……………………………………………………..Lc= 200 mm
The height of the structure (roof elevation)………………………………. 8 m
The bracket elevation (the highest)………………………………………. 7.5 m
Adopted bolts are steel grade… 8.8 GR, diameter………. 20 mm

2.0 THE CONCEPT


The concept is based prior to esier process of erection of steel brackets and easier
process of loading / maintenance of DI pipes.

Building / area: Potable Tank rev: POTABLE TANK Sheet:


issued for: APPROVAL 0 the pipe support 0 0 5

Princess Noura Bint Abdulrahman University for Women Project Joint venture
Riyadh, Kingdom of Saudi Arabia El Seif/CCC
part / package: package 3 - Utillity area references: time: date:
department: ENGINEERING 1:58 PM 1/16/2018
calcs by: Aleksandar Jankovic sr.str.eng

3. LOADS ANALYSES
3.1 Dead load
The wieght of the pipe………………………………………………. 95.5 kg
The weight of the fluid……………………………………………….. 125.6 kg
The weight of the clamp...………………………………………….. 22.705968 kg
total= 243.80597 kg
Total weight without water including stiffeners, bolts, nuts……… 130.02656 kg
total dead load G=…………….. 1.3002656 kN
Total weight including water weight (for seismic force required)… 255.62656 kg
total dead load Gs=…………… 2.5562656 kN

3.2 Seismic load


Seismic force as per UBC 1997 vol 2, section 1632-lateral seismic force for non structural
components and equipments supported by structures.
3.2.1 coefficients
Component amplification factor, Ap
Ap=…….. 1 as per table 16-O, for category 3B

Component response modification factor, Rp


Rp=…….. 3 as per table 16-O, for category 3B

Seismic importance factor, Ip


Ip=……… 1 as per table 16-K, for category 3

Seismic coefficient, Ca
Ca=…….. 0.19 as per table 16-Q, assuming soft soil (Se), and alternative for zone 1,
since for zone 0, coefficient is 0, so total seismic force will be zero.

3.2.2 TOTAL SEISMIC LATERAL FORCE


Fp=(((Ap*Ca*Ip)/Rp)*(1+3(Hx/Hr))) * Gs=….……………………………… 0.6172316 kN
Total force... E= 0.6172316 kN

3.3 Live load


Assumed pressure variation……………….……………………………p= 0.1 bar
Dynamic force created by water surge: Fw=A*P=…………….…...Fw= 1.256 kN

4. THE CHECK OF THE FRICTION BETWEEN PIPE CLAMPS AND DI PIPE


Friction ratio between steel and ductile iron….…..……………………… 0.3
Tension capacity of the bolts…..………………………………………….. 8.8 GR
ptcap=….. 560 N/mm2
D bolt=….. 20 mm
Ptcap=…. 140672 N………… 141 kN
The clamp will be tighten to the 80% of full bolt tension capacity force.
Tb=……… 112.5376 kN
The pressure on the pipe by steel clamp, Pp:
width=….. 523.333 mm
length=…. 200 mm
Pp=Tb/L*b
Pp=…….. 0.00108 kN/mm2
Pp=………. 0.21504 kN/mm
Building / area: Potable Tank rev: POTABLE TANK Sheet:
issued for: APPROVAL 0 the pipe support 0 0 6

Princess Noura Bint Abdulrahman University for Women Project Joint venture
Riyadh, Kingdom of Saudi Arabia El Seif/CCC
part / package: package 3 - Utillity area references: time: date:
department: ENGINEERING 1:58 PM 1/16/2018
calcs by: Aleksandar Jankovic sr.str.eng

The friction force Ff= 0.064512 kN/mm


The slip force due to dead load………………………………………… 0.0024846 kN/mm
The slip force due to live load………………………………………….. 0.0024 kN/mm
The factored combined slip force: 1.4*G + 1.6*Fw………………….. 0.0073184 kN/mm
Combined slip force=…………….. 0.007318 < 0.064512 kN/mm-friction force………… safe

5. THE LOAD DISTRIBUTION ON THE CLAMP/STEEL BRACKET LOCATION


Forces are:
dead load:
vertical force…………….. 2.556266 kN
bending moment………… 0.511253 kNm
live load:
vertical force…………….. 1.256 kN
bending moment………… 0.2512 kNm
seismic load horizontal perpendicular
horizontal force………….. 0.617232 kN
bending moment………… 0.123446 kNm
seismic load horizontal longitudinal 1
horizontal force………….. 0.617232 kN
seismic load horizontal longitudinal 2
horizontal force………….. 0.617232 kN

6. THE CHECK OF THE STEEL BRACKET


Is calculated in softwear STAAD PRO 2006 and input/output files are shown on following
pages.
The deisgn criteria AISC ASD included, and the bracket is checked on the torsion stress.
Building / area: Potable tabk rev: POTABLE TANK Sheet:
issued for: APPROVAL 0 the pipe support 0 0 7

Princess Noura Bint Abdulrahman University for Women Project Joint venture
Riyadh, Kingdom of Saudi Arabia El Seif/CCC
part / package: package 3 - Utillity area references: time: date:
department: ENGINEERING 1:58 PM 1/16/2018
calcs by: Aleksandar Jankovic sr.str.eng

7.0 THE CHECK OF THE ANCHORING SYSTEM

The adopted is post drilled HILTI anchored system using galvanized HILTI bolts prior to
water's environment.
Due to water's environment the designed anchored system is not using grouting, the plate
will be directly tighten to the concrete wall. All other steel items, susch as beam, clamp and
connection bolts will be hot deep galvanized.

The calculations are based on maximum reaction forces assuming all types of loads:
dead load:
live load,
seismic load horizontal perpendicular,
seismic load horizontal longitudinal 1, and
seismic load horizontal longitudinal 2.

Fx= 0.61 kN Mx= 1.794 kNm


Fy= 2.641 kN My= 0.425 kNm
Fz= 0.61 kN Mz= 0 kNm

Assuming safety factor of ……. 2

Fx= 1.22 kN Mx= 3.588 kNm


Fy= 5.282 kN My= 0.85 kNm
Fz= 1.22 kN Mz= 0 kNm