Você está na página 1de 24

WGP

Location Location
Description RFI Description Description

BGP PAINTING
SHOP

BGP PAINTING
SHOP

BGP PAINTING
SHOP

BGP F14 LIVE


AREA

BGP SLEEPER
AREA

BGP SLEEPER
AREA

BGP SLEEPER
AREA
BGP SLEEPER
AREA

BGP PAINTING
SHOP
BGP

Location
RFI Description Description

Inspection of primer coat prior to top coat application of pipe Spools ; Paint System -APCS-2C/1E KGP LIVE / OVER
BRIDGE "A".

Inspection of surface preparation & Prior to primer application of pipe spools ; coating System
-APCS-2C

In-process inspection of primer coat OR First coat application of pipe spools ; coating System
-APCS-2C

Inspection of primer coat prior to top coat application of of damage areas of line No# F14-SF-
0881J-10 A -01 A-001,F14-SF-0882J-10 A-01 A-001,,F14-SF-2034J-4 A-10 A-001; Coating System
-APCS-2C on F14 TANK &PUMP AREA.

Inspection of surface preparation & Prior to primer application of Guide Support weld Joints
Coating System -APCS-1C at Loop - 3 to Loop 4.

In-process inspection of primer coat OR First coat application of Guide Support weld Joints
Coating System -APCS-1C at Loop - 3 to Loop 4.

Inspection of surface preparation & Prior to primer application of HT PKG # F17-P-003-04-HT-025 ,


F17-P-003-04-HT-026 & F17-P-003-04-HT-029 including weld joints, welded supports and
jumpovers. Paint System - APCS-2C at Loop - 3 to Loop 4
In-process inspection of primer coat OR First coat application of HT PKG # F17-P-003-04-HT-025 &
F17-P-003-04-HT-026 &F17-P-003-04-HT-029 including weld joints, welded supports and
jumpovers. Paint System - APCS-2C at Loop - 3 to Loop 4.

Inspection of primer coat prior to top coat application of pipe Spools ; Paint System
-APCS-1E
KGP

RFI Description

Inspection for Final DFT coat touch up at Weld joint area for Anchor Support AS-001, Installated for 8"
Molten Sulfur Pipeline Coating System APCS 2C.
WGP

Location Location
Description RFI Description Description

Visual Verification of Paint material : 1)INTERNATIONAL INTERLINE 399 PART A/B : 4 CANS, 2) BGP PAINTING
WGP TANK "C" INTERNATIONAL THINNER GTA 220: 1 CANS SHOP

Inspection for Surface Preparation prior to application of primer coat touch up at Flanges BGP PAINTING
WGP TANK "C" ( Faces & Edges) on Tank C ( Roof & Shell ) / Coating System APCS 2A SHOP

In process Inspection of primer coat touch up application at Flanges BGP PAINTING


WGP TANK "C" ( Faces & Edges) on Tank C ( Roof & Shell ) / Coating System APCS 2A SHOP

BGP PAINTING
SHOP

BGP SLEEPER
AREA

BGP SLEEPER
AREA

BGP SLEEPER
AREA
BGP SLEEPER
AREA

BGP F17/ FUME


STACK AREA

BGP F17/ FUME


STACK AREA
BGP

Location
RFI Description Description

21 KM PIPELINE
Inspection of primer coat prior to top coat application of pipe Spools ; Paint System -APCS-2C KGP

Inspection of surface preparation & Prior to primer application of pipe spools ; coating System
-APCS-2C

In-process inspection of primer coat OR First coat application of pipe spools ; coating System
-APCS-2C

Inspection of Top coat Application (Dry / Cured coating ); 24 Supports; Paint System - APCS-2C

Inspection of surface preparation & Prior to primer application of Guide Support weld Joints
Coating System -APCS-1C at Loop - 3 to Loop 4.FROM 30'DEC-2017 TO 01'JAN-2018

In-process inspection of primer coat OR First coat application of Guide Support weld Joints
Coating System -APCS-1C at Loop - 3 to Loop 4.FROM 30'DEC-2017 TO 01'JAN-2018

Inspection of surface preparation & Prior to primer application of HT PKG # F17-P-003-04-


HT-025 , F17-P-003-04-HT-026 & F17-P-003-04-HT-029 including weld joints, welded
supports and jumpovers. Paint System - APCS-2C at Loop - 3 to Loop 4. FROM 30'DEC-
2017 TO 01'JAN-2018
In-process inspection of primer coat OR First coat application of HT PKG # F17-P-003-04-
HT-025 & F17-P-003-04-HT-026 &F17-P-003-04-HT-029 including weld joints, welded
supports and jumpovers. Paint System - APCS-2C at Loop - 3 to Loop 4.FROM 30'DEC-
2017 TO 01'JAN-2018

Inspection of surface preparation for paint to touch up at Galwanised structure at weld


joint for Cable tray and Condute support, frome ( loading shelter to fume stack ) / APCS
1C Primer coat application only

Inprocess Inspection for paint to touch up at Galwanised structure at weld joint for
Cable tray and Condute support, frome ( loading shelter to fume stack ) / APCS 1C
Primer coat application only
KGP

RFI Description

INSULATION INSPECTION PRIOR TO START CLADDING FOR THE LOOP


NO:L24,L25,L26,L27,L28,L29,L30,L32,L33,L34,L35,L36 & LX12 UPSIDE ELBOW ONLY
(PARTIAL BALANCE)