Daily Operation Management Report

Published at 06:25hr on 30 Nov 2007

Day Shift Shift D 4 RSM : ###########


Subbarayudu Yenuganti
Night Shift Shift C 3 RSM : Muhammad Nazri
3 B Abdullah

HSE Issues :
nil

Unit Throughput :
Unit Name Actual (bbls) MDR Final Plan Act /Plan
Remarks
Last 24hr 1 hr avg current (bbls) (bbls) (24 hours)

CDU1 99,276 94,614 94,746 95,000 100,000 99.3%

CFU 28,103 27,992 28,038 25,000 28,000 100.4%

CRU1 22,024 22,047 22,097 24,000 22,000 100.1%

CDU2 131,640 131,635 131,691 133,000 140,000 94.0% Feed reduced to 130 Mbpsd to reduce column overhead pressure.

Feed reduced to 16.5 Mbpsd to conserve feed stock in case of U-21


CRU2 15,817 15,835 15,802 29,300 29,000 54.5% shut down.

DHT 27,674 27,635 27,727 40,500 33,000 83.9%

HCK 17,636 17,682 17,733 37,500 38,000 46.4% Feed reduced to 17.5 Mbpsd to conserve feed stock in case of U-21 s/d.

DCU 24,204 24,692 24,829 23,500 23,500 103.0%


Rate based on
SRU 152 157 156 250 crude quality
ref BOPT ref Unit Regulation
Actual (bbls) MDR MWh % Utilization TNB
Cogen Remarks
Last 24hr 1 hr avg current MDR ton/h Boilers
Electricity
70 2 GTG2 still under rectification of "rachet" instrumentation
(MWh)
Steam
133 143
(ton/hr)
##
## Reliability :
## Unit Name estm. Uptime (%) estm. ULPO (in US$) Last Days
## Last 24hr MTD QtrTD FYTD Weekly MTD QTD FYTD Trip Date w/o Trip
## CDU1 100.0% 100.0% 100.0% 100.0% 0 0 0 8,289 16-Nov-07 14 days
## CFU 95.8% 99.8% 99.9% 99.9% 2,304 2,304 5,165 9,575 16-Nov-07 14 days
## CRU1 100.0% 100.0% 100.0% 100.0% 0 0 18 2,239 16-Nov-07 14 days
## CDU2 100.0% 94.7% 97.7% 97.7% 0 82,664 118,600 133,728 17-Jun-07 166 days
CRU2 100.0% 100.0% 100.0% 100.0% 0 0 350 91,511 26-May-07 188 days
DCU 100.0% 98.9% 97.7% 97.7% 1,085 2,108 16,522 82,536 09-Apr-07 235 days
DHT 98.5% 99.6% 99.0% 99.0% 809 2,138 19,479 32,459 26-May-07 188 days
HCK 100.0% 96.3% 96.4% 96.4% 37,306 171,903 610,447 920,885 28-Apr-07 216 days
Plant or Unit trips defination - If major equipment I.e heaters trip and cause main product send to slop tank.
Major Equipment Not Available :
Unit Equip. Tag (Service) Cause Status & ETC Mitigation Requirement
Unit 51 F-5102 (HP Steam Boiler) Air register stuck Repair plan in progress. ETC TBA F-51201/ 203 are kept at optimum condition.

U-75 V-75202 C ( LPG Bullet) CF renewal by DOSH. Internal scaffolding in progress, etc PSR 1 + PSR2 : 6 bullets available.
@ 31/12

Major Operational Issue :


nil

Other Shift Activities :


nil

25 ULPO Uptime 100%

0.99
19.06 0.96
ULPO in US$ Millions

20 0.95 90%
0.93 0.93 0.92
Uptime in %

15 12.89 80%
12.35
10.95
10 0.74 70%
7.09
5.99
Q:\Rsm\DAILY-Opt-Mgmt.xls Page 1 of 1