BACKGROUND
The simplest arrangement for a relief vent system is to simply connect piping from the outlet of a single relief
valve or dual relief assembly and direct that piping to a safe terminal location. The sizing of single vent lines
to atmosphere is straightforward and tables given in standards such as ANSI/IIAR 2 (2010) and ANSI/ASHRAE
Research Staff
Dan Dettmers 608/262-8221
djdettme@wisc.edu
1
Vol. 12 No. 2, 2012
Noteworthy
Noteworthy
•• Visit
Markthe
your
IRCcalendars
website tonow
access
for the
presentations
2013 IRC madeResearch
at the 2011and
IRCTechnology
Research
Forum – May 2-3, 2012 at the Pyle Center in Madison, WI.
and Technology Forum.
•• Mark
Send your
itemscalendars now
of note for fornewsletter
next the 2012 Jekel, tbjekel@wisc.edu.
IRC Research
to Todd and Technology
Forum – May 2-3, 2012 at the Pyle Center in Madison, WI.
• Send items of note for next newsletter to Todd Jekel, tbjekel@wisc.edu.
2
Vol. 12 No. 2, 2012
function of pipe roughness and inside diameter:
where:
ε = pipe inside surface roughness (ft) – note a surface roughness of 0.00015 ft is assumed for piping
d = inside diameter of pipe (in)
As discussed by Reindl and Jekel (2006), the above formulation assumes subsonic isothermal compressible flow
through the vent pipe system. Although not in a convenient form, Equation 1 can be used to analyze flow
through both a single and headered relief system. For a single vent system, P0, represents the inlet pressure to
the vent system (which is identical to the outlet or back-pressure on the safety relief valve) while P2 is the
pressure at the vent pipe outlet. For an existing or proposed vent system, the known or assumed variables
include the equivalent length of pipe, friction factor, inside pipe diameter, rated relief device flow, and the
pressure at the outlet of the vent pipe. The single unknown is the inlet pressure. Unfortunately, Equation 1
cannot be rearranged to explicitly solve for vent pipe inlet pressure, P0; consequently, the inlet pressure to the
vent pipe must be found by iteratively solving the Equation 1.
For a headered relief vent system, Equation 1 can be used in a piecemeal fashion by analyzing segments of a vent
pipe system beginning at a point of known pressure (vent system outlet) and systematically applying the
equation to find the inlet pressure to that segment given the pipe diameter, equivalent length, mass flow rate,
and friction factor. This process is repeated until the pressures throughout the entire network of relief piping
have been determined. One of the critical tests for code/standard compliance of the vent piping system is that
the back-pressure on each relief device expected to be operating is less than the maximum allowable back-
pressure for that relief device.
Besides physical data on piping as well as flow rates obtained from the certified capacity of each relief device, the
sizing of a headered relief system requires consideration as to which relief valves are expected to be actuating
simultaneously. In this article, we introduce some fundamental concepts and considerations for determining
credible relief scenarios that then can be used as a basis for sizing the vent side of a headered relief system.
First, let’s review basic requirements from codes and standards and then we will consider various relief scenarios
that should be considered in the process of establishing a design basis for a relief vent system.
The PSM Standard does not prescriptively identify the information that should be included in the design and
design basis documentation; however, in its VPP Supplement, OSHA recommended that the following items be
included as part of the design and design basis documentation (OSHA 2008):
3
Vol. 12 No. 2, 2012
5. Listing of all sources of overpressure considered
6. Identification of the worst case overpressure scenario or relief design
7. State of material being relieved (i.e. liquid, vapor, liquid-vapor, liquid-vapor-solid, along with an
identification of the material which was the basis for the relief device selection)
8. Physical properties of the relieved materials, vapor rate, molecular weight, maximum relieving pressure,
heat of vaporization, specific gravity and viscosity
9. Design calculations
Items 1-4 above are obvious and unambiguous. Items 5, 6, 7, and 8 are often embedded in the assumptions that
form the foundation for the prescriptive methods used to size relief devices for industrial refrigeration systems
using either IIAR 2 or ASHRAE 15. Specifically, ASHRAE 15 and IIAR 2 incorporate refrigerant-specific properties
and a prescribed external heat load (i.e. fire) on a protected component such as a vessel as described by Reindl &
Jekel (2006) and the Cold Front (IRC 2011).
What remains unclear in the process of engineering many relief systems is identification of credible scenarios
that involve simultaneous relief valve operation so that an appropriately sized relief vent system design can be
ensured. The goal of this issue of the Cold Front is to provide further guidance on scenario consideration
that can credibly support a proper design basis for a headered relief vent system. First, let’s review the codes
and standards that form the RAGAGEP (Recognized As Generally Accepted Good Engineering Practice) for relief
protection, as applied to industrial refrigeration systems.
ASHRAE 15
In 2000, ASHRAE modified its method for determining the allowable length for the outlet piping connected to a
relief device as summarized previously by the IRC (2001). Sections 9.7.8.4 and 9.7.8.5 of ASHRAE 15 (2010)
identify requirements for relief vent lines connecting two or more relief devices.
9.7.8.4 The size of the discharge pipe from a pressure relief device or fusible plug shall not be less than the outlet size of
the pressure-relief device or fusible plug. Where outlets of two or more relief devices or fusible plugs are
connected to a common line or header, the effect of back pressure that will be developed when more than one
relief device or fusible plug operates shall be considered. The sizing of the common discharge header
downstream from each of the two or more relief devices or fusible plugs that are expected to operate
simultaneously shall be based on the sum of their outlet areas with due allowance for the pressure drop in all
downstream sections.
9.7.8.5 The maximum length of the discharge piping installed on the outlets of pressure-relief devices and fusible plugs
discharging to the atmosphere shall be determined by the method in Normative Appendix E. See Table 3 for the
flow capacity of various equivalent lengths of discharge piping for conventional relief valves.
The highlighted provision in 9.7.8.4 above captures the essence of criteria expected for engineering a headered
or manifolded relief vent system. In reality, the vent side of a headered relief system must be sized sufficiently to
maintain the outlet pressure at each relief device expected to simultaneously operate at a pressure less than the
maximum allowable back pressure.
Some relief system designers mistakenly believe that sizing a vent header based on the “sum of the outlet areas”
of those connected pressure relief devices is sufficient to guarantee the vent system is able to provide adequate
capacity without exceeding the maximum allowable back pressure of any connected relief device. Unfortunately,
that is not always the case! In other words, there are cases where the sum of the areas criteria was met but the
back pressure at the outlet of one or more relief valves was greater than the maximum allowable. The failure of
the “sum of the outlet areas” guidance is increasingly probable when a given header has a mix of relief valves
with different set pressures (e.g. 150 psig and 250 psig set pressures). The “sum of the outlet areas” is not a
reliable criterion to ensure that the back pressure on relief valves will be equal to less than the maximum
allowable.
4
Vol. 12 No. 2, 2012
To arrive at a truly functional and code-compliant relief vent system, the designer can systematically apply the
line length equation (Equation 1) to segments of the vent system to demonstrate that the pressure at the outlet
of each relief device is less than the maximum allowable back pressure.
Normative Appendix E of ASHRAE 15 (2010) defines the following limits on back pressure for pressure relief
valves:
For the allowed back pressure (P0), use the percent of set pressure specified by the manufacturer, or, when the allowed
back pressure is not specified, use the following values, where P is the set pressure:
• for conventional relief valves, 15% of set pressure, P0 = (0.15 P) + atmospheric pressure
• for balanced relief valves, 25% of set pressure, P0 = (0.25 P) + atmospheric pressure
• for rupture members, fusible plugs, and pilot operated relief valves, 50% of set pressure, P0 = (0.50 P) +
atmospheric pressure
Unless a relief valve manufacturer provides specific data on the maximum allowable back pressure for their own
relief device(s), both IIAR 2 and Standard 15 provide limits the valve’s back pressure based on its type.
“Conventional relief valves” are the most widely used type of relief valves used in industrial refrigeration systems
and the limit on back pressure for these types of valves is 15% of the valve’s set pressure.
IIAR 2
In 2008, IIAR published an updated version of its design standard IIAR 2 with subsequent changes issued in 2010.
Section 11.3.4 of IIAR 2 establishes requirements for headered relief systems for industrial ammonia refrigeration
applications.
11.3.4 The size of the discharge pipe from a pressure relief device shall not be less than the outlet size of the pressure
relief device. The size and maximum equivalent length of common discharge piping downstream from each of two or
more relief devices shall be governed by the sum of the discharge capacities of all the relief devices that are expected
to discharge simultaneously, at the lowest pressure setting of any relief device that is discharging into the piping, with
due allowance for the pressure drop in all downstream sections.
The above IIAR 2 requirements mirror those outlined in ASHRAE 15-2010 §9.7.8.4. In addition, normative
Appendix A of IIAR 2 (2010) has established limits on the back pressure limits for pressure relief valves identical
to those identified in normative Appendix E of ASHRAE 15.
The key requirement in IIAR 2 and ASHRAE 15 related to sizing the vent piping for pressure relief devices is to
identify scenarios where one or more of the installed pressure relief devices are expected to simultaneously
actuate. Once those scenarios are identified, Equation 1 is used to systematically analyze the vent system to
determine whether or not the back pressure at the outlet of each relief device is greater than the maximum
allowable back pressure.
Although there is no limit to the number of relief devices that can be connected to a single header, the
complexity of the vent piping design process increases as the number of connected relief vent branch lines
increases. Part of the complexity involves considering situations or scenarios where two or more relief valves can
5
Vol. 12 No. 2, 2012
be expected to simultaneously lift.
For the purposes of this article, a relief vent line is satisfactorily sized if the back pressure at the outlet of each
relief device coincidently operating is less than the maximum allowable back pressure for that valve. We will
functionally characterize relief scenarios into the following three categories: maintenance, fire condition, and
operational upsets as illustrated in Figure 1. If installation of safety relief valves for your situation involves other
categories, they would should considered accordingly. Let’s look at each of these categories and identify a range
of different relief scenarios that can arise in the design process of engineering a relief vent system.
Figure 1: Categories of overpressure situations for industrial refrigeration systems relief scenarios.
Maintenance
The simplest case that must be considered in engineering the relief vent system for an industrial refrigeration
system involves the actuation of pressure relief valves protecting each individual piece of equipment to which
they are attached. This situation has the potential to occur when the individual pieces of equipment are isolated
from the system for maintenance purposes coincident with an external or internal heat load creating
overpressure.
For each individual piece of equipment, the maintenance relief scenario needs to be considered in the context of
the basis for sizing the relief for protecting the equipment. For vessels, the most common sizing basis is an
external heat load. For positive displacement compressors, the relief valve sizing basis is often the minimum
regulated flow of the machine. For heat exchangers, the sizing basis would be the larger of an external or
internal heat load. Details on relief sizing bases were discussed in the last edition of the Cold Front (Vol. 12 No. 1)
and additional information can be found by referring to Reindl and Jekel (2009 and 2006).
Considering separately the relief valve lifting on each individual piece of equipment establishes a minimum
branch line size. If one or more of the branch segments creates excessive outlet or back-pressure on operating
relief devices, the diameter of the offending branch pipe(s) must be increased to reduce the vent line pressure
drop which decreases the relief valve outlet or back pressure. Keep in mind that if a relief valve cannot pass the
maximum allowable back-pressure test when operating by itself, it will not pass when simultaneously operating
with other relief devices on a header. In some cases, it may be possible to maintain the size of an existing vent
pipe branch if a lower capacity relief valve can be installed. Keep in mind that any proposed relief valve
6
Vol. 12 No. 2, 2012
alternative must have sufficient flow capacity to protect the vessel or component.
Fire Condition
As noted above, the most common basis for sizing relief valves on pressure vessels is a radiative heat load from a
fire causing overpressure due to liquid refrigerant evaporating (or by the specific volume increase in vapor-only
vessels ). The relief device sizing methods included in ASHRAE 15 and IIAR 2 do not take any “credit” for heat
load reduction on vessels due to the presence of insulation or metallic jacket materials – both of which could
theoretically reduce the effective heat load on the vessel. As a result, the fire condition scenarios will consider
the relief valves protecting one or more vessels or other equipment operating at their rated flow coincidentally.
Let’s explore when and where this may occur.
Machinery Room
A fire condition within a machinery room can create overpressure in a number of situations. Depending on how
the machinery room is configured, the fire condition could be limited to a geographic area of the space as shown
in Figure 2. If the machinery room has some form of a fire protection system, this may be a reasonable
assumption. In this case, the machinery room fire scenario may only consider the simultaneous relief of the
recirculator and Booster 1. A more conservative approach would be to assume that a fire in the machinery room
affects all refrigerant containing vessels/equipment within the room.
Figure 2: Machinery room fire scenario with limited geographical impact due to the presence of a fire
protection system.
Another question that often arises in machinery room scenarios involving a fire condition is whether or not one
or more positive displacement compressors co-located in the room should be considered as relieving
coincidentally with vessels. The answer to this question is “probably not” as it would be highly unlikely for
compressors to continue their operation during a fire condition. In addition, compressors are required to be
fitted with engineering controls in the form of a high-pressure cutout that shuts down the machine at discharge
pressures no higher than 90% of the pressure relief valve’s set pressure. This engineering control reduces the
likelihood of compressors continuing to operate.
Two types of equipment that we have not discussed yet in the context of a fire scenario in a machinery room are
oil separators and the refrigerant-side of thermosiphon oil cooling heat exchangers. Frequently, the pressure
relief protection affixed to an oil separator is sized to accommodate the positive displacement compressor to
which it is connected1. In this case, the capacity of the relief valve is far in excess of the minimum required to
protect the vessel due to an external heat load based on the traditional sizing approach for a vessel (C=fDL).
7
Vol. 12 No. 2, 2012
That being the case, it is natural to ask: Is it reasonable to include the simultaneous relief of the PRVs on the oil
separators along with other vessels in the machinery room during a fire scenario? The answer to this question is
“no” if the separator is not isolated from the system for maintenance but connected to high-side with piping and
associated downstream equipment such as evaporative condensers, HPR, thermosiphon pilot receiver, etc. which
are located outside of the machinery room. In this situation, heat gained to the oil separator will cause the
refrigerant vapor to expand and pressure to build. When the pressure of refrigerant vapor in the oil separator
exceeds the prevailing high-side pressure, the compressor’s discharge check valve will naturally “relieve” vapor
from the separator to high side of the system where the higher pressure gas will have a greater volume to occupy
or it may be condensed as it gives up heat to the ambient environment. In the case where the plant anticipates
having one or more of its compressors routinely valved out of the system, it would be prudent to include the
simultaneous relief of the pressure relief valve connected to that compressor’s oil separator for fire condition
cases.
In a similar fashion to that described above for the oil separators, the fire condition would not warrant inclusion
of the pressure relief valves protecting the refrigerant-side of the oil cooling heat exchangers in a simultaneous
relief scenario with other vessels in the machinery room. Individually, the oil coolers should be evaluated to
ensure they have sufficiently sized vent piping but they would not be expected to relieve simultaneously with
pressure vessels because they would normally be open to the high-side of the system. If more than one oil
cooling heat exchanger can be expected to routinely be left valved out of the system, those oil coolers should be
included in the fire scenario with the other vessels simultaneously relieving.
Figure 3: Production area fire scenario effecting process equipment with PRVs but not machinery room
equipment with PRVs where both share a common vent pipe system.
1
The most notable exception would be the case where there is an intervening stop valve between the compressor and the oil
separator. In this case, separate relief valves would need to be installed: one on the upstream side of the stop valve to protect the
compressor and one on the downstream side to protect the oil separator.
8
Vol. 12 No. 2, 2012
For a fire scenario where the protected equipment resides in an area separated from the machinery room but
sharing a comment vent pipe system, we recommend evaluating a scenario where the protected equipment
located within the separate area (e.g. the plant) would be relieving coincidentally and independently of the
equipment located within the machinery room.
Operations-Related Scenario
Probably the most difficult of categories for establishing all possible overpressure scenarios is related to facility
operations. The challenge, in part, is due to the diversity of refrigeration-equipment within a plant that may be
connected to a headered vent pipe system but the difficulty is also attributable to the designer’s clairvoyance in
identifying those situations where one or more relief valves protecting pieces of equipment in the refrigeration
system may simultaneously lift. Let’s look at a couple of examples.
From a relief scenario standpoint, it will often be the case that protected equipment will relieve individually and
not simultaneously. If there are situations where the refrigerant-side of multiple pieces of equipment are valved-
out from the system and subjected to internal heat loads that lead to over-pressuring, a scenario where the PRVs
on those pieces of equipment relieving simultaneously should be analyzed.
UPSET CONDITIONS
The term “upset condition” is used to broadly describe system operating excursions outside of a normal range.
The underlying factors that contribute to upset conditions are varied but could include: abnormal weather,
production starts or stops, loss and/or restoration of commercial power, temporary operations, equipment
mechanical failure, controls (sensors, actuators, control logic) failure, human error, or any other situation that
can drive the system outside of its normal operating range of pressures, temperatures, or flows.
It is important to think broadly about the refrigeration system layout, equipment, and operations to identify
2
Values assume ammonia as the refrigerant and temperatures are based on MAWP as well as an allowed 10% overpressure.
9
Vol. 12 No. 2, 2012
those factors that have the potential to cause upset conditions that lead to overpressure. The process hazard
analysis (PHA) process is a useful tool to uncover possible upset conditions as well as their likelihood and
consequence. Applying the PHA process directly to operating and maintenance procedures (e.g. What if a
procedural step is skipped?) can also help define other possible scenarios that should be considered in a relief
systems analysis. Any upset condition scenarios identified either in the PHA processes or during operations (as
near misses) should feed into the analysis of safety relief systems to ensure the functional performance of relief
devices and vent systems.
OPERATING MISHAPS
Operating mishaps can lead to upset conditions that result in overpressuring equipment. Consider a system
design that uses a dedicated evaporative condenser for heat rejection of a thermosiphon oil cooling system as
shown in Figure 4 and described in more detail in a past edition of the Cold Front (Vol. 3 No. 1). In this case,
the oil cooling circuit has a dedicated refrigerant charge not shared or cross-connected with the main
refrigeration system. Should an operator inadvertently shutdown the TSOC circuit evaporative condenser fan (or
pump) while compressor oil coolers are rejecting heat to the circuit, the pressure in the entire oil cooling circuit
will rise rapidly leading to an overpressure condition. Although the oil temperature in each operating
compressor will also rise, the refrigerant pressure in the fixed oil cooling circuit will rise at a faster rate.
In this design, an overpressure scenario included with the vent piping analysis would have all of the connected
thermosiphon oil cooler pressure relief valves (e.g. PRVs 1-3 shown above) lifting simultaneously and flowing at
their stamped capacity. This is just one example of an operator mishap. For each installation, it is important to
identify situations that involve advertent or inadvertent actions operations staff that can lead to overpressuring
equipment. Analyze all overpressure scenarios identified accordingly.
Figure 4: System-segregated closed circuit heat rejection system for thermosiphon oil cooling.
10
Vol. 12 No. 2, 2012
Note that in this rather unique case, we highly recommend the addition of one or more separate pressure
transducer(s) be installed on the refrigerant-side of the oil cooling heat rejection circuit and wired to shut down
the compressors in the event the circuit pressure rises above a defined threshold level. We have seen more than
one case where the refrigerant-side of that dedicated thermosiphon oil cooling circuit was overpressured
without actuating a related safety, high oil temperature, to shutdown compressors. To be consistent with the
engineered safeties on the compressor’s themselves; the cutout threshold should not be greater than 90% of the
MAWP of the equipment within the oil cooling circuit. If this safety is added and maintained, the scenario
outlined above may be relaxed to an external fire scenario where the total heat absorbed by the oil coolers and
the pilot receiver would need to be relieved.
Table 2 provides a summary of various pressure relief scenarios that incorporate maintenance, fire, and
operational upsets. The summary includes examples of protected equipment, relief device set pressures,
equipment locations and descriptive scenarios. It is intended to capture the more common relief scenarios but
each installation and facility needs to be considered in its own context.
REQUIRED CHANGES
In the course of analyzing all credible relief scenarios, it is essential to identify any case where the calculated back
pressure at the outlet of a relief valve is greater than the maximum allowable. When this occurs, changes are
required to bring the vent system into compliance. The most logical change is to increase the diameter of the
vent pipe branch, sub-main, or main; however, there may also be an opportunity to reduce the length of pipe as
well or “right-size” the relief device. Because there are multiple paths that can be taken to achieve a compliant
relief system, designers have some degree flexibility. Here are a few approaches to consider as you try to bring a
relief system into compliance:
1. Branch piping: Increase the size of the branch line (i.e. the piping connected to the outlet of the relief
device experiencing excessive back pressure).
2. Right-size the relief device: If the installed relief device capacity is greater than the minimum required
to protect a given vessel, compressor, or other piece of equipment, there may be an opportunity to
select a valve with lower capacity. When the capacity of the installed relief device is reduced, the ability
for a given vent pipe size to carry flow increases. The increase in flow carrying capability of the vent line
translates into reduced relief device back pressure. With this approach, the designer must ensure that
the proposed relief device capacity is equal to or greater than the minimum required capacity for the
protected component. Remember to check the capacity of the proposed replacement relief device when
accounting for relief device inlet pressure losses. With inlet losses, the corrected relief device capacity
must be equal to or greater than the minimum capacity required to protect the component. Although
ASHRAE 15 and IIAR 2 allow the vent pipe on a relief valve to be sized based on its diminished capacity
due to inlet losses, we highly recommend that the vent system be sized based on the stamped capacity
on the relief valve. This approach is somewhat conservative but it eliminates future problems that may
arise if modifications are made that result in reduced inlet pressure losses. Such modifications could
include the removal of rupture disks on a combination relief arrangement or replacement of a three-way
manifold with a valve that has lower pressure drop.
3. Sub-main and main piping: Increase the size of any sub-main or main headers. This strategy is often not
entirely helpful because mains tend to be the largest pipe in a vent system with the least pressure drop.
Nonetheless, there can be circumstances where bottlenecks occur in main parts of a vent system –
11
Vol. 12 No. 2, 2012
3
Each positive displacement compressor relieves individually. For thermosiphon oil-cooled compressors, this scenario would also include the simultaneous relief of the
refrigerant-side of the oil coolers when the compressor standing maintenance procedures require the refrigerant-side of the oil cooling heat exchanger to be valved out along
with the compressor during maintenance.
12
Vol. 12 No. 2, 2012
upsize them if their pressure drop is high. Undersized mains result from designs that only considers
individual relief valves lifting (i.e. no simultaneous relief scenarios considered).
4. Vent main outlet location: The location of the relief vent outlet to atmosphere can play an important
role in the back pressure developed as a result of relief device actuation. To the greatest extent possible,
it is desirable to locate the outlet of a relief vent system nearest to lower set pressure reliefs (on a
system with a mix of set pressures). It is also desirable to locate the vent outlet near the largest capacity
relief valves on the vent header in order to reduce its effect on the installed capacity of the connected
relief devices. This is often a strategy that is most applicable to vent systems that are under design for
new installations. It is a less helpful strategy if one is attempting to “rehabilitate” an existing relief vent
system.
5. Watch set your pressures: It is possible to engineer a compliant relief vent system with connected relief
valves of varying set pressures. With that said, lower set pressure relief valves have lower maximum
allowable back pressures. This means that less pressure drop can be tolerated in the portion of a vent
pipe system serving the lower set pressure relief valves. In some cases, it may be desirable (or
necessary) to split up a vent pipe system and have separate vent lines serving the lower set pressure
relief valves.
Of course these are not the only strategies that can be applied to arrive at a compliant relief system. Be creative
but not crazy!
CONCLUSIONS
Achieving a compliant pressure relief system requires design professionals to identify and evaluate a range of
situations that can lead to equipment overpressure. These overpressure conditions are an important part of
ensuring that the relief devices themselves have sufficient capacity but that the vent pipe system will also allow
one or more of the relief valves to operate coincidently without adversely effecting valve operation. The
scenarios assumed for the purpose of evaluating a vent pipe system need to be internally consistent with the
assumptions made for sizing the relief devices themselves.
In this edition of the Cold Front, we focused on identifying overpressure situations that are rooted in fire
conditions, maintenance, and operational upsets. We discussed a range of scenarios where multiple relief valves
may be actuated. These scenarios would then be included in a vent system analysis to ensure that no operating
relief valve has a back pressure greater than its maximum allowable back pressure.
REFERENCES
ANSI/ASHRAE 15, “Safety Standard for Refrigeration Systems”, ASHRAE, Atlanta, GA (2010).
ASME B31.5, “Refrigeration Piping and Heat Transfer Components”, American Society of Mechanical Engineers,
(2010).
ASME Section VIII Div. 1, “Boiler and Pressure Vessel Code – Rules for Construction of Pressure Vessels”,
American Society of Mechanical Engineers, (2010).
ANSI/IIAR 2, “Equipment, Design, and Installation of Closed-Circuit Ammonia Mechanical Refrigerating Systems”,
2008 edition including Addendum A published in 2010, International Institute of Ammonia Refrigeration,
(2010).
IRC, “Engineering Relief Systems – Relief Valve Sizing Considerations”, Industrial Refrigeration Consortium Cold
Front newsletter, Vol. 12, No. 1 (2012).
13
Vol. 12 No. 2, 2012
IRC, “Closed Refrigerant Circuit for Screw Compressor Oil Cooling”, Industrial Refrigeration Consortium Cold Front
newsletter, Vol. 3, No. 1, (2003).
IRC, “Code Changes for Relief Vent Lines”, Industrial Refrigeration Consortium Cold Front newsletter, Vol. 3, No. 1
(2001).
IRC, “Relief Vent Lines TechNote - An Overview of Standard Changes”, Industrial Refrigeration Consortium
technical note, (2001).
Reindl, D. T. and Jekel, T. B, “Pressure Relief Device Capacity Determination,” ASHRAE Transactions, Vol. 115, No.
1, pp. 603-612, (2009).
Reindl, D. T. and Jekel, T. B., Engineering Safety Relief Systems Guidebook, Industrial Refrigeration Consortium,
University of Wisconsin-Madison, (2006).
OSHA, “VPP Application Supplement for Sites Subject to the Process Safety Management (PSM) Standard”,
Occupational Safety and Health Administration,
http://www.osha.gov/dcsp/vpp/psm_app_supplement_final.html (2008).