RENCANA ANGGARAN BIAYA (RAB)

No. Jenis Pekerjaan Satuan Volume


1 2 3 4
I Pekerjaan Persiapan
1 Pembersihan Lapangan Ls 1.00
2 Pegukuran dan pemasangan 1 m
bouwplank Ls 1.00
3 Papan Nama Proyek Ls 1.00
4 Mobilisasi/Demobilisasi Ls 1.00
5 Obat-obatan Ls 1.00
Sub Jumlah
II Pekerjaan Lantai
1 Pasir Urug Bawah Lantai M3 1.15
2 Lantai Beton Tumbuk finising
Acian M3 1.68
Sub Jumlah
III Pekerjaan Dinding
Pemasangan Rangka Dinding
1 Baja Rigan C.75, 0,6 mm M2 55.56
2 Pemasangan Dinding Plywood t = M2 55.56
9 mm
Sub Jumlah
IV Pekerjaan Pintu/Jendela &
1 Ventilasi
Pintu type 1 (3 bh)
a Daun Pintu double triplek 4 mm bh 2.00
uk.80 x 210 cm
b Engsel Pintu bh 4.00
c Kunci Tanam bh 2.00
2 Jendela Type 1 (2 bh)
a Daun Jendela uk. 100 x 110 cm bh 2.00
b Engsel Jendela bh 8.00
c Grendel Jendela bh 4.00
d Hak Angin bh 8.00
3 Jendela Type 2 (1 bh)
a Daun Jendela uk. 50 x 110 cm bh 1.00
b Engsel Jendela bh 2.00
c Grendel Jendela bh 1.00
d Hak Angin bh 2.00
Sub Jumlah
V Pekerjaan Atap
a Pemasangan Rangka Kuda2 M2 34.10
Pemasangan Penutup Atap (Seng
b Gelombang BJLS 0,2 mm M2 34.10
c Rabuang seng t = 0,2 mm M 5.80
d List Plank GRC t = 9 mm M 20.2
Sub Jumlah
VI Pekerjaan Instalasi Listrik
1 Lampu bh 4.00
2 Titik Lampu + Instalasi titik 4.00
3 Stop Kontak + Instalasi titik 3.00
Sub Jumlah
VII Pekerjaan Lain-lain
Pembersihan akhir Ls 1
Sub Jumlah
Jumlah (A)
PPN 10% (B)
Jumla (A) + (B)
Pembulatan
NA ANGGARAN BIAYA (RAB)

Harga Satuan Jumlah Harga


Analisa (Rp) (Rp)
5

Taksir 85,000.00 85,000.00

111,000.00 111,000.00
15,000.00 15,000.00
75,000.00 75,000.00
15,000.00 15,000.00
301,000.00

218,730.00 251,976.96

972,870.00 1,636,289.51
1,888,266.47

111,590.00 6,199,940.40

110,960.00 6,164,937.60
12,364,878.00

300,000.00
600,000.00
51,300.00 205,200.00
255,500.00 511,000.00

500,000.00 1,000,000.00
38,000.00 304,000.00
53,100.00 212,400.00
17,500.00 140,000.00

250,000.00 250,000.00
38,000.00 76,000.00
53,100.00 53,100.00
18,000.00 36,000.00
3,387,700.00

150,000.00 5,115,000.00

76,750.00 2,617,175.00
46,070.00 267,206.00
29,000.00 585,800.00
8,585,181.00

38,000.00 152,000.00
75,000.00 300,000.00
70,000.00 210,000.00
662,000.00

75,000.00 75,000.00
75,000.00
27,264,025.47
2,726,400.00
29,990,425.47
29,990,000.00
RENCANA ANGGARAN BIAYA (RAB)

No. Jenis Pekerjaan Satuan Volume


1 2 3 4
I Pekerjaan Persiapan
1 Pembersihan Lapangan Ls 1.00
2 Pegukuran dan pemasangan 1 m
bouwplank Ls 1.00
3 Papan Nama Proyek Ls 1.00
4 Mobilisasi/Demobilisasi Ls 1.00
5 Obat-obatan Ls 1.00
Sub Jumlah
II Pekerjaan Lantai
1 Pasir Urug Bawah Lantai M3 1.15
2 Lantai Beton Tumbuk finising
Acian M3 1.70
Sub Jumlah
III Pekerjaan Dinding
Pemasangan Rangka Dinding
1 Baja Rigan C.75, 0,6 mm M2 45.00
2 Pemasangan Dinding Plywood t = M2 55.56
9 mm
Sub Jumlah
IV Pekerjaan Pintu/Jendela &
1 Ventilasi
Pintu type 1 (3 bh)
a Daun Pintu double triplek 4 mm bh 2.00
uk.80 x 210 cm
b Engsel Pintu bh 4.00
c Kunci Tanam bh 2.00
2 Jendela Type 1 (2 bh)
a Daun Jendela uk. 100 x 110 cm bh 2.00
b Engsel Jendela bh 8.00
c Grendel Jendela bh 4.00
d Hak Angin bh 8.00
3 Jendela Type 2 (1 bh)
a Daun Jendela uk. 50 x 110 cm bh 1.00
b Engsel Jendela bh 2.00
c Grendel Jendela bh 1.00
d Hak Angin bh 2.00
Sub Jumlah
V Pekerjaan Atap
a Pemasangan Rangka Atap M2 33.64
b Pemasangan Rangka Kuda2 M2 22.95

Pemasangan Penutup Atap (Seng


c Gelombang BJLS 0,2 mm M2 33.64
d Rabuang seng t = 0,2 mm M 5.80
e List Plank GRC t = 9 mm M 20.2
Sub Jumlah
VI Pekerjaan Instalasi Listrik
1 Lampu bh 4.00
2 Titik Lampu + Instalasi titik 4.00
3 Stop Kontak + Instalasi titik 3.00
Sub Jumlah
VII Pekerjaan Lain-lain
Pembersihan akhir Ls 1
Sub Jumlah
Jumlah (A)
PPN 10% (B)
Jumla (A) + (B)
Pembulatan
NA ANGGARAN BIAYA (RAB)

Harga Satuan Jumlah Harga


Analisa (Rp) (Rp)
5

Taksir 85,000.00 85,000.00

111,000.00 111,000.00
15,000.00 15,000.00
75,000.00 75,000.00
15,000.00 15,000.00
301,000.00

218,730.00 251,539.50

972,870.00 1,653,879.00
1,905,418.50

111,590.00 5,021,550.00

110,960.00 6,164,937.60
11,186,487.60

300,000.00
600,000.00
51,300.00 205,200.00
255,500.00 511,000.00

500,000.00 1,000,000.00
38,000.00 304,000.00
53,100.00 212,400.00
17,500.00 140,000.00

250,000.00 250,000.00
38,000.00 76,000.00
53,100.00 53,100.00
18,000.00 36,000.00
3,387,700.00

111,590.00 3,753,887.60
111,590.00 2,560,990.50

76,750.00 2,581,870.00
46,070.00 267,206.00
29,000.00 585,800.00
9,749,754.10

38,000.00 152,000.00
75,000.00 300,000.00
70,000.00 210,000.00
662,000.00

75,000.00 75,000.00
75,000.00
27,267,360.20
2,726,400.00
29,993,760.20
29,990,000.00
RENCANA ANGGARAN BIAYA (RAB)

No. Jenis Pekerjaan Satuan Volume


1 2 3 4
I Pekerjaan Persiapan
1 Pembersihan Lapangan Ls 1.00
2 Pegukuran dan pemasangan 1 m
bouwplank Ls 1.00
3 Papan Nama Proyek Ls 1.00
4 Mobilisasi/Demobilisasi Ls 1.00
5 Obat-obatan Ls 1.00
Sub Jumlah
II Pekerjaan Lantai
1 Pasir Urug Bawah Lantai M3 1.15
2 Lantai Beton Tumbuk finising
Acian M3 2.20
Sub Jumlah
III Pekerjaan Dinding
Pemasangan Rangka Dinding
1 Baja Rigan C.75, 0,6 mm M2 40.63
2 Pemasangan Dinding Plywood t = M2 55.56
9 mm
Sub Jumlah
IV Pekerjaan Pintu/Jendela &
1 Ventilasi
Pintu type 1 (3 bh)
a Daun Pintu double triplek 4 mm bh 2.00
uk.80 x 210 cm
b Engsel Pintu bh 4.00
c Kunci Tanam bh 2.00
2 Jendela Type 1 (2 bh)
a Daun Jendela uk. 100 x 110 cm bh 2.00
b Engsel Jendela bh 8.00
c Grendel Jendela bh 4.00
d Hak Angin bh 8.00
3 Jendela Type 2 (1 bh)
a Daun Jendela uk. 50 x 110 cm bh 1.00
b Engsel Jendela bh 2.00
c Grendel Jendela bh 1.00
d Hak Angin bh 2.00
Sub Jumlah
V Pekerjaan Atap
a Pemasangan Rangka Atap M2 33.64
b Pemasangan Rangka Kuda2 M2 22.95

Pemasangan Penutup Atap (Seng


c Gelombang BJLS 0,2 mm M2 33.64
d Rabuang seng t = 0,2 mm M 5.80
e List Plank GRC t = 9 mm M 20.2
Sub Jumlah
VI Pekerjaan Instalasi Listrik
1 Lampu bh 4.00
2 Titik Lampu + Instalasi titik 4.00
3 Stop Kontak + Instalasi titik 3.00
Sub Jumlah
VII Pekerjaan Lain-lain
Pembersihan akhir Ls 1
Sub Jumlah
Jumlah (A)
PPN 10% (B)
Jumla (A) + (B)
Pembulatan
NA ANGGARAN BIAYA (RAB)

Harga Satuan Jumlah Harga


Analisa (Rp) (Rp)
5

Taksir 85,000.00 85,000.00

111,000.00 111,000.00
15,000.00 15,000.00
75,000.00 75,000.00
15,000.00 15,000.00
301,000.00

218,730.00 251,539.50

972,870.00 2,140,314.00
2,391,853.50

111,590.00 4,533,901.70

110,960.00 6,164,937.60
10,698,839.30

300,000.00
600,000.00
51,300.00 205,200.00
255,500.00 511,000.00

500,000.00 1,000,000.00
38,000.00 304,000.00
53,100.00 212,400.00
17,500.00 140,000.00

250,000.00 250,000.00
38,000.00 76,000.00
53,100.00 53,100.00
18,000.00 36,000.00
3,387,700.00

111,590.00 3,753,887.60
111,590.00 2,560,990.50

76,750.00 2,581,870.00
46,070.00 267,206.00
29,000.00 585,800.00
9,749,754.10

38,000.00 152,000.00
75,000.00 300,000.00
70,000.00 210,000.00
662,000.00

75,000.00 75,000.00
75,000.00
27,266,146.90
2,726,400.00
29,992,546.90
29,990,000.00
No. Item Pekerjaan Panjang Lebar

1 Kuda-kuda rangka baja C-75.60 16.06


2 Seng Gelombang
Rangka Dinding Baja Ringan

Jumlah
Volume Terpasang Volume Kontrak Selisih
Tinggi Volume M2 M2 Volume

10.97 15.66 34.10 18.44


33.64 34.10 0.46
26.9 55.56 28.66
Harga Satuan Selisih Harga Total Selisih
(Rp) (Rp) (Rp)

150,000.00 2,766,000.00 536,604,000.00


76,750.00 35,305.00 6,849,170.00
111,590.00 3,198,169.40 620,444,863.60

1,163,898,033.60