Cash Flow
By Lou Giuliano, President of ITT Industries and Mike George, CEO of George Group
800%
% Increase in Supply Chain Velocity
700%
600%
500%
400%
300%
200%
100%
0%
50% 55% 60% 65% 70% 75% 80% 85% 90%
TABLE OF CONTENTS
What About the Velocity of Product Development, Marketing and Transactions? ..............................10
Page 2
Accelerating Supply Chain Velocity and Cash Flow
Our experience shows that managers must first understand the dynamics which determine supply chain
velocity. With this understanding and the team implementation capability inherent in Value-Based Six
Sigma processes, supply chain velocity can quickly be doubled, then re-doubled. If management does not
have this understanding, supply chain velocity does not improve. We felt so strongly about the need to
close this management knowledge gap that we agreed to co-author this paper. In this paper we will focus
on the drivers of supply chain velocity within the “four walls” of the factory. In a later paper we will discuss
external supply chain factors such as demand, distribution, logistics, and suppliers which are all currently
addressed by Supply Chain software (e.g., i2 Trade Matrix).
E-Business has created a new opportunity for growth and profits to companies like Dell Computer, who
have a flexible, high velocity supply chain. At ITT our CEO, Travis Engen, has announced:
We are currently pushing our e-business capabilities beyond basic customer
interaction to integrate all of our business processes… Further, we will use our
Value-Based Six Sigma continuous improvement initiative to improve our
competitive position and drive further growth across all of our businesses. This is
our roadmap for sustained growth and profitability.
Page 3
Accelerating Supply Chain Velocity and Cash Flow
Greater cash flow, less investment, lower operating costs, and higher revenue growth all result from a high
velocity supply chain. Since projects are prioritized using the tools of Value Based Management1,
shareholder value is maximized. To achieve these goals, Business Unit managers must know key velocity
drivers, know what questions to ask, and what level of performance improvement to demand. This paper
contains the core lessons every manager must master to create an ever-accelerating supply chain velocity.
Product Mix Change: Batch Size of 5 Product Mix Change: Batch Size of 1
1 The Value Imperative, James McTaggert, Peter Kontes and Michael Mankins, The Free Press, 1994.
Page 4
Accelerating Supply Chain Velocity and Cash Flow
In the animation, we learn that the velocity of the supply chain could be increased five-fold if the setup time
and batch size at the time bottleneck, the Punch workstation, could be reduced by 80%. This allows the
launching of batch sizes 80% smaller with no reduction in production rate, resulting in a five-fold increase in
overall velocity. By cutting WIP inventory by 80%, lead-time was reduced by 80%. In appendix 2 we will
see that a seven-fold improvement has been achieved in a real factory and contributed to a dramatic
increase in Economic Value Add.
We identify the Punch as the leading time bottleneck, because it creates the greatest single slowdown in
the velocity of the supply chain. Long setup time requires it to run large batches to produce at a given rate
of 10/hr. Given a large enough batch size, the Punch is able to deliver 11 parts per hour. Hence it is not a
capacity bottleneck, since a rate of only 10 per hour is required. Time Bottlenecks can generally be
removed by applying one of the six improvement methods described in the Application of Critical Insights
section of this paper (p. 9). Capacity bottlenecks may require capex investment (see pg. 14). Failure to
understand the difference between time bottlenecks and capacity bottlenecks has caused unnecessary
capex investment.
Excess inventory, whether due to large batch sizes or pre-mature or excessive releases, slows down
manufacturing velocity, just like too many cars slows down the freeway. By improving factory velocity, the
animation showed that the distribution channel velocity was also increased. Better customer service levels
were achieved with a fifth of the WIP and less than half the distribution inventory. The relationship between
WIP and supply chain velocity can be understood by the graph below. If you can reduce the WIP by 50%,
you will double the supply chain velocity. If you can reduce the WIP by 85% (as was achieved by the
company in Appendix 3), you can increase the supply chain velocity by 700%.
800%
% Increase in Supply Chain Velocity
700%
600%
500%
400%
300%
200%
100%
0%
50% 55% 60% 65% 70% 75% 80% 85% 90%
Page 5
Accelerating Supply Chain Velocity and Cash Flow
We depict this situation by the Rocks diagram. The factory is likened to a boat that transforms raw material
to finished goods by crossing a perilous river strewn with dangerous rocks. As long as the water level
(batch size) is large enough, deficiencies like long setup time will not prevent the factory from hitting its
production rate, albeit with large inventory. The height of the rocks can be calculated using flow algorithms
and generally allows an immediate reduction in inventory and acceleration of velocity. This is as far as the
Theory of Constraints goes. Process Improvement, directed by SupplyChainAcceleratorSM goes much
further, applying improvement methods to eliminate the worst time bottleneck (highest rock) and allowing
much greater velocity acceleration and inventory reduction. The next time bottleneck is then attacked in a
never-ending cycle of improvement to the maximum supply chain velocity described in Appendix 1 (p. 14).
Raw Finished
Material Goods
Manufacturing
BATCH SIZE
CYCLE TIME
Figure 1
Page 6
Accelerating Supply Chain Velocity and Cash Flow
Process deficiencies are proportional to the height of the rocks under the water. The height of the water is
proportional to the batch size or WIP. The water level of most factories is significantly above the rocks
(Figure 1). We can reduce the batch size to just above the highest rock, making an immediate reduction in
inventory and acceleration of the supply chain (Figure 2). We then improve the worst workstation (in this
example) with the Four Step Rapid Setup method before we lower the water level (batch size) again
(Figure 3). We then move on to the next workstation and use Six Sigma quality tools, etc, in a never ending
cycle of improvement and supply chain velocity increase.
Raw Finished
Material Goods
Manufacturing
BATCH SIZE
CYCLE TIME
Transport Time Operation Time Rework Setup
Operation 3 Operation 7 Operation 4 Operation 10
Figure 2
Raw Finished
Material Goods
BATCH SIZE
CYCLE TIME
Manufacturing
Ra
Setupid
p
Figure 3
Page 7
Accelerating Supply Chain Velocity and Cash Flow
Most of our plants, including the Army Radio plant mentioned above, were launching batches that were far
greater than required for production demand, i.e., there weren’t any long setup times or other process
deficiencies that forced us to use large batches. Velocity was tripled within four months because we
immediately reduced batch size to the calculated minimum plus the recommended safety margin. It is very
important to calculate the minimum batch size rather than make arbitrary batch size reductions.
Compare your circled answers with the correct answers below. If you have a hard time believing them, the
calculations are quickly performed by SupplyChainAcceleratorSM using flow algorithms.
Page 8
Accelerating Supply Chain Velocity and Cash Flow
Leverage
We can turn the logic around -- if you have process deficiencies, you have an opportunity to accelerate the
velocity of the supply chain. In real factories, it turns out that only about 20% of the workstations are
responsible for destroying 80% of the velocity. Thus, improving only 20% of the workstations results in a
five-fold increase in supply chain velocity. Managers are attracted by this leverage offered by
continuous improvement. The insight that a 10% scrap rate can create a 53% increase in inventory and
slow down the supply chain velocity by 38% is also compelling.
Page 9
Accelerating Supply Chain Velocity and Cash Flow
Process Time Improvement: Increasing output per hour (after setup) using workstation
redesign, waste motion elimination, work instructions: principally applied to human paced
work.
Process Flow Improvement: Reducing the transport time between workstations, and
balancing line flow and work content. Particularly valuable for assembly work, it also
enables the Six Sigma successive checks quality method.
Pull System Implementation: Replacing all or part of a forecast demand system with a
replenishment system using either cards or computer to trigger demand based on
downstream customer consumption. Maximum intermediate and logistics output buffer size
is calculated, based on process deficiencies and demand fluctuations. Workstation shuts
down when max output inventory buffer quantity is reached.
The improvement methods are relatively easy to learn, but like any continuous improvement initiative, do
require the Black Belts to have both training in the improvement methods and team leadership skills.
Page 10
Accelerating Supply Chain Velocity and Cash Flow
Value-Based Strategies Leadership Six Sigma Performance Supply Chain / Marketing &
Decisions driven by key Effectiveness Improvement Sales / Product
value drivers (EVA, ROIC, Model behavior Infrastructure of Development
Growth) Company-wide Champions, Black Pull from specific best
Determine priorities for communications Belts, & Green Belts practices to support process
business, markets, Robust problem solving improvement in cost, quality
Create alignment
product, and projects process that attacks and cycle time
Physical & Intellectual Optimize &
accelerate variability
capital allocation
performance
Page 11
Accelerating Supply Chain Velocity and Cash Flow
We have used simple examples and animations to show that Supply Chain Velocity and lead time is
determined by WIP inventory, and that WIP inventory is determined by process deficiencies such as setup
time. Most workstations are far more complicated, producing scores of different parts. Software is available
which makes easy the task of calculating the delay time imposed by each workstation. In analyzing a real
factory, we want to know which workstations are the time bottlenecks in priority of their destruction of
supply chain velocity. As we saw in the animation, we cannot always make this determination by looking for
inventory buildups. The bottleneck workstation, the Punch, required batch sizes of 5, but once this batch
size is launched throughout the factory, WIP spreads pretty uniformly. Moreover, the actual batch sizes
used in a factory are often arbitrarily chosen, not calculated using flow algorithms. Thus the batch size may
be larger than needed to compensate for process deficiencies. In such a case, we can immediately reduce
WIP and increase velocity without even improving any of the workstations.
Critical Insight: Maximum Supply Chain Velocity Results from Calculating and
Launching Minimum Batch Size
To maximize the velocity of the supply chain, we clearly have to minimize the WIP inventory. This in turn
requires that we launch the minimum batch size consistent with the production demand and the existing
process deficiencies. The power of SupplyChainAcceleratorSM is that it can calculate this minimum batch
size directly from the data. Other simulation programs can get to the minimum batch size by multiple runs.
Our goal is to put a tool into the hands of manufacturing that is no more difficult to learn than Excel™.
SupplyChainAcceleratorSM locates the same bottleneck more quickly, although it uses average rather than
distribution data.
Figure 4
Figure 5
Capex Avoidance
Capex should only be spent on capacity bottlenecks, and then only if capacity process deficiencies
such as setup time scrap, downtime, etc have first been eliminated. SupplyChainAcceleratorSM and
other simulation packages can calculate the capacity bottlenecks and allow “what if” scenarios to be
played. In our experience, nearly half of all capex investments can be avoided. Capex applied to non-
bottleneck workstations generates more excess inventory. The first step in attacking a capacity bottleneck
is to eliminate process deficiencies such as setup time, downtime, scrap, etc. The last step should be
purchasing additional capex. One of our clients was about to buy an expensive bar code tracking system.
Once the velocity had been increased five-fold, he no longer cared where the product was, since if it
entered the line on Monday it would hit test by Thursday.
Manufacturing Cycle Efficiency = MCE =(Value Add Time critical path) / (actual cycle time)
In the next appendix we will study a real factory which increased its supply chain velocity seven-fold in a
period of about a year. Lead times were reduced from 14 days to 2 days in this two-shift operation. Is this
good or bad? Well, clearly it is better than it was, and in fact was good enough to overpower the
competition and double revenue. Based on the above analysis, we shall find that the maximum velocity was
2.5 hours, so there was still plenty of room for improvement.
In performing this calculation, it is important to remove any bake and cure times from numerator and
denominator, as they distort the MCE upward, and in fact can often be eliminated by alternate technologies.
So what is a world-class benchmark? When I visited Toyota in Japan, I saw comparable factories running
at 20-30% cycle efficiencies, but which had been operating under continuous improvement for over a
decade. An MCE above 10% is generally going to surpass any competitor, and will be achieved in tandem
with a Six Sigma level of quality. In comparing the MCE of two factories, one must also estimate the relative
complexity of their product mix. Velocity is adversely affected by product complexity, and the relative impact
can be calculated by SupplyChainAcceleratorSM.
BEF O RE AF T ER
M a n u fa ctu rin g Cycle T im e 14 Day s 2 Day s
Re ve n u e ($M M ) 145 312
EBIT DA ($M M ) 10 48
O p e ra tin g M a rg in 5.4% 13.8%
Ca p ita l T u rn o ve r 2.8 3.7
RO IC 10.0% 33.3%
EV A = RO IC% - W ACC % -2.0% 21.3%
En te rp rise V a lu e ($M M ) 64 208
Figure 6
About 15% of all workstations (25% of non-assembly workstations) received a team-led application of the
improvement methods. To give one example, the flare machines shown in Figure 7 had a 2-hour setup time
and were a time bottleneck. The machines were setup off shift and a single part number was produced the
whole next shift, then moved to the next workstation. The principal metric used by management had been
direct labor productivity. By reducing the setup time to 10 minutes, the batch size was reduced and 8
different part numbers were set up and run during each shift, reducing the delay time and inventory by
more than 80%, with no loss of direct labor productivity.
2 Hour
Excess WIP Setup Time 10 Minute
Setup Time
BEFORE AFTER
Metal Ware Flare running large batches with Metal Ware Flare with pull system and setup
large amounts of WIP at revenue of $145MM reduction: inventory reduced 85% at revenue
of $300MM
Figure 7
This is just one of about 20 workstations which were high priority time bottlenecks that received team-led
application of one or more of the improvement methods. A four-hour videotape is available which details
the improvements in the other workstations, and was used as a training video in sister plants. The fact that
a 7-fold improvement in velocity can result from improving 15% of a plant’s workstations is far more
important now than ever before.
VALUE
6 5-6
4-5
5 3-4
H&F
H&F
3.6
3.6 2-3
4
Market to 1-2
Book
Equity 3
>5%
H&F
H&F
2 2% to 5%
1.0
1.0
1 -2 to+2%
Figure 8
Thus far we have discussed how to reduce WIP and lead time by launching the minimum calculated batch
size. This has been illustrated by performing manual calculations using a few parameters such as setup
time, scrap, etc. We have also used the SupplyChainAcceleratorSM software tool, which can accept 35
additional production parameters and performs laborious calculations for you. We have shown the financial
benefits of launching calculated batches throughout an automotive supplier factory.
Is it practical for a Black Belt to manually input and model a whole factory using
SupplyChainAcceleratorSM? A typical plant has hundreds of workstations producing thousands of part
numbers. Even a modest factory of 75 workstations and 2000 part numbers would take six weeks of
uninterrupted work to model, and the time rises linearly with the number of workstations and part numbers.
To this must be added the chore of manually inputting changes in schedule demand, updating machine
downtime, etc.
90%
Percentage of Lead time delay
80%
70%
60%
50%
40%
30%
20%
10%
0%
0% 5% 10% 15% 20% 25% 30%
Percentage of Workstations
Figure 9
Thus a set of Black Belt projects that will reduce lead time by 80% can be defined, executed and monitored
through e-Tracker. When planning a project, the Black Belt can download data from
SupplyChainAcceleratorSM so that he or she can plan the improvement project using “what if” scenarios and
sensitivity analysis. This enables the Black Belt/Production Planning to decide which improvement methods
(immediate batch size reduction, setup reduction, total productive maintenance, poka yoke, operation time
improvement, etc) will be most effective in eliminating a time bottleneck.
The advantage of SupplyChainAcceleratorSM is that WIP and lead time reduction can be accomplished
much faster due to the early knowledge of time bottlenecks in priority order. At one client, the delivery time
and WIP was reduced by 50% in just three months using SupplyChainAcceleratorSM. The demands of e-
Commerce are creating requirements for rapid acceleration of the supply chain velocity with resulting agility
and responsiveness, making a high velocity Supply Chain increasingly important.
The minimum process data necessary for input to SupplyChainAcceleratorSM from MRP include: monthly
demand by part number, setup time, and processing time per unit. Workstations which are shown to be
suspect time bottlenecks also require Machine Downtime %, Scrap and Rework %, as do all other
workstations in which these parameters exceed 5%, respectively. SupplyChainAcceleratorSM includes 35
input parameters, which describe virtually all manufacturing conditions (e.g., Startup Scrap, MTTR, etc).
Any significant departure of a parameter from normal should be input. Great accuracy is not generally
needed until a workstation is determined to be a suspect time bottleneck. At this point the Black Belt will
enter detailed data to validate its priority as described above. SupplyChainAcceleratorSM typically runs on a
mainframe or an NT Server 4, or NT 2000. Individual workstations can be downloaded to
SupplyChainAcceleratorSM via ASCII input. The attached SupplyChainAcceleratorSM output is an Air-
conditioning factory consisting of 75 workstations, primarily presses and assembly. The output has been
sorted by Workstation cycle time and calculated Batch size. The data from this factory provided the input
for the graph above.
Station Name Flags Station Cycle Cycle Percent Percent Percent Percent
Cycle Time Time Time Unit Setup Process Down Idle
Unit Mode Time Time Time Time
Station Name Flags Station Cycle Cycle Percent Percent Percent Percent
Cycle Time Time Time Unit Setup Process Down Idle
Unit Mode Time Time Time Time
Station Name Part Number Step Shipping Rate Processed Rate Rate Rate Period Batch Flags
Number Period Mode Size
Station Name Part Number Step Shipping Rate Processed Rate Rate Rate Period Batch Flags
Number Period Mode Size